West Avenue Phase II

Project Phase: Pre-Construction

Project Limits

The project limits will include the following areas:

  • West Avenue between 8 Street and Lincoln Road, including side streets
  • Bay Road between 14 Street and the Collins Canal
  • Alton Court between 16 Street and Lincoln Road

Scope of Work

  • Storm water drainage system, including a pump station at the western street end of Lincoln Road
  • Fire hydrants
  • Sanitary sewer main
  • Water main and service lines
  • Elevating the roadway
  • Constructing new curb, gutter and sidewalks
  • Installing new crosswalk pavers at various intersections
  • Installing new signage and pavement markings
  • Installing new protected bicycle lanes along West Avenue
  • Installing new street and pedestrian lighting and traffic signals
  • Rebuilding Alton Court between Lincoln Road and 16 Street
  • Harmonizing the new roadway elevation to existing driveways
  • Constructing a section of the Baywalk and seawall at the Lincoln Road street end
  • Installing some new landscaping on the corridor

Project Timeline
Estimated Design Start Date – TBD
Estimated Design Completion Date – TBD

Project Status
Please note: At the December 2017 commission meeting, the project was referred to the Sustainability and Resiliency Committee for review and evaluation of the stormwater program being conducted.

Project Team

City of Miami Beach Senior Capital Projects Coordinator
Sabrina Baglieri 

City of Miami Beach Capital Project Coordinator
Jorge Rodriguez

Engineer of Record / Resident Project Representative
Chen-Moore and Associates

Design Consultant
CES Consultants, Inc.

Contractor
Ric- Man Construction FL, Inc.

Public Information
Heather M. Leslie
HML Public Outreach
Ph: 305.905.5876
Email: heather@hmlPublicOutreach.com