{"id":29122,"date":"2017-08-11T00:12:05","date_gmt":"2017-08-11T00:12:05","guid":{"rendered":"http:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/table-of-contents-details\/section-7-2-installation\/"},"modified":"2018-01-26T15:36:29","modified_gmt":"2018-01-26T20:36:29","slug":"section-7-2-installation","status":"publish","type":"page","link":"https:\/\/www.miamibeachfl.gov\/es\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/","title":{"rendered":"Secci\u00f3n 7 2. Instalaci\u00f3n"},"content":{"rendered":"<\/p>\n<p><strong>SECCI\u00d3N 7 SISTEMA DE RECOLECCI\u00d3N POR GRAVEDAD DE ALCANTARILLADO SANITARIO<\/p>\n<p>2. INSTALACI\u00d3N<\/strong><\/p>\n<p>A. Se utilizar\u00e1n herramientas y equipos adecuados para el manejo y tendido seguro y conveniente de las tuber\u00edas, de acuerdo con las recomendaciones del fabricante. Al colocarlas, se examinar\u00e1 cuidadosamente la tuber\u00eda para detectar defectos, y si se descubre alguna tuber\u00eda defectuosa despu\u00e9s de la colocaci\u00f3n, el contratista la retirar\u00e1 y la reemplazar\u00e1 por una tuber\u00eda s\u00f3lida, a su cargo.<\/p>\n<p>B. La excavaci\u00f3n y el relleno de zanjas y pozos de registro se deber\u00e1n especificar en la Secci\u00f3n de Excavaci\u00f3n y Relleno de Obras de Sitio para Servicios P\u00fablicos y Estructuras del Manual de Obras P\u00fablicas de CMB.<\/p>\n<p>C. Si la ubicaci\u00f3n del alcantarillado no est\u00e1 claramente definida, inst\u00e1lelo de manera que no est\u00e9 a menos de 1.8 metros (6 pies) de distancia horizontal, entre tuber\u00edas (preferiblemente 3 metros) de la tuber\u00eda principal o de servicio de agua. Si la parte inferior de la tuber\u00eda de agua se encuentra al menos 45.7 cm (18 pulgadas) por encima de la parte superior de la tuber\u00eda de alcantarillado, la separaci\u00f3n horizontal puede ser de al menos 1.8 metros (6 pies) entre tuber\u00edas (v\u00e9ase la secci\u00f3n (IV)(A)(4) para el material de la tuber\u00eda que se utilizar\u00e1).<\/p>\n<p>D. El ancho de las zanjas en suelos estables debe proporcionar un espacio libre m\u00e1ximo de 30 cm (12 pulgadas) a cada lado, entre el exterior del cuerpo de la tuber\u00eda y el frente de la excavaci\u00f3n, o la l\u00e1mina si se utiliza, cuando se mide a 30 cm (12 pulgadas) por encima del borde superior de la tuber\u00eda. El ancho m\u00ednimo de las zanjas en las mismas condiciones debe ser de 15 cm (6 pulgadas) a cada lado. El ancho m\u00ednimo de las zanjas debe ser suficiente para que una persona coloque y compacte los refuerzos y el material de relleno inicial. En suelos inestables (definidos como turba, mantillo u otros suelos org\u00e1nicos, limos el\u00e1sticos y arcilla o arenas finas por debajo del nivel fre\u00e1tico), el ancho de las zanjas debe ser de al menos cinco (5) di\u00e1metros nominales de tuber\u00eda, cuando se mide a 30 cm (12 pulgadas) por encima del borde superior de la tuber\u00eda, para acomodar el equipo y los requisitos de zanjado y compactaci\u00f3n.<\/p>\n<p>E. La cama y el relleno inicial 6 pulgadas por debajo y 12 pulgadas por encima de las tuber\u00edas principales y los servicios de alcantarillado deber\u00e1n ser de arena gruesa sin rocas de m\u00e1s de \u00be de pulgada de di\u00e1metro.<\/p>\n<p>\u00a0<\/p>\n<p>F. Modele manualmente el fondo de la zanja para dar un soporte circunferencial pr\u00e1cticamente uniforme a la base de cada tuber\u00eda. Cuando corresponda, la instalaci\u00f3n de las tuber\u00edas se realizar\u00e1 en sentido ascendente, con los extremos de las espigas orientados en la direcci\u00f3n del flujo.<\/p>\n<p>G. La tuber\u00eda se colocar\u00e1 en la zanja preparada, alineada y nivelada. El tubo tubular recibir\u00e1 un soporte continuo y uniforme, sin que el fondo de la zanja ejerza presi\u00f3n sobre las juntas.<\/p>\n<p>H. Se deber\u00e1 colocar una cinta detectora de pl\u00e1stico \u201cverde\u201d con papel met\u00e1lico y con las palabras \u201cPRECAUCI\u00d3N L\u00cdNEA DE ALCANTARILLADO ENTERRADA DEBAJO\u201d impresas a intervalos de 30\u2033 a lo largo de la cinta, a 18\u2033 por encima de todas las tuber\u00edas principales y laterales de alcantarillado.<\/p>\n<p>I. Cada tuber\u00eda se tender\u00e1 alineada y nivelada seg\u00fan lo indicado en los planos, de manera que forme una uni\u00f3n conc\u00e9ntrica cerrada con la tuber\u00eda adyacente y evite desplazamientos repentinos de la l\u00ednea de flujo. La tuber\u00eda se tender\u00e1 de manera que las marcas de identificaci\u00f3n se ubiquen en la parte superior de las tuber\u00edas instaladas. El contratista utilizar\u00e1 instrumentos topogr\u00e1ficos para mantener la alineaci\u00f3n y la nivelaci\u00f3n. Se tomar\u00e1 al menos una medici\u00f3n de elevaci\u00f3n en cada uni\u00f3n de tuber\u00eda.<\/p>\n<p>J. El interior de las tuber\u00edas de alcantarillado deber\u00e1 mantenerse limpio y libre de suciedad y materiales superfluos. Si la limpieza posterior a la instalaci\u00f3n resulta dif\u00edcil debido al peque\u00f1o tama\u00f1o de la tuber\u00eda, se mantendr\u00e1 un hisopo o rastra adecuado en la tuber\u00eda y se pasar\u00e1 por cada junta inmediatamente despu\u00e9s de completarla. Durante la suspensi\u00f3n del trabajo, por cualquier motivo y en cualquier momento, se colocar\u00e1 un tap\u00f3n adecuado en el extremo de la \u00faltima tuber\u00eda instalada para evitar la entrada de lodo u otros materiales extra\u00f1os. En este caso, se proporcionar\u00e1 un soporte adecuado para evitar que la tuber\u00eda se levante debido al agua en la zanja. Cualquier tuber\u00eda defectuosa deber\u00e1 retirarse inmediatamente y reemplazarse por una tuber\u00eda en buen estado.<\/p>\n<p>K. Las tuber\u00edas de alcantarillado se deben instalar de acuerdo con la \u00faltima revisi\u00f3n de la norma ASTM D2321 y la \u201cPr\u00e1ctica recomendada para la instalaci\u00f3n de tuber\u00edas de alcantarillado de PVC\u201d de la Asociaci\u00f3n de tuber\u00edas pl\u00e1sticas Uni-Bell.<\/p>\n<p>L. Los pozos de registro se construir\u00e1n seg\u00fan lo indicado en los planos, de acuerdo con los Detalles Est\u00e1ndar de la Ciudad de Miami Beach. Las aberturas de las tuber\u00edas de los pozos de registro se sellar\u00e1n con lechada elastom\u00e9rica o un material similar aprobado. No se permitir\u00e1 el uso de yeso para molduras.<\/p>\n<p>M. Los canales de fondo se formar\u00e1n con ladrillo o escombros de ladrillo, completamente asentados y cubiertos con lechada de arena y cemento, con una forma precisa hasta formar un fondo semicircular que se ajuste al interior de la secci\u00f3n de alcantarillado adyacente. Se evitar\u00e1n pendientes pronunciadas fuera de los canales de fondo. Los cambios de tama\u00f1o y pendiente se realizar\u00e1n de forma gradual y uniforme. Los cambios de direcci\u00f3n del alcantarillado o ramal de entrada deber\u00e1n ser una curva suave con un radio lo m\u00e1s largo posible.<\/p>\n<p>N. Despu\u00e9s de que la Ciudad haya instalado los pozos de registro y los haya inspeccionado para detectar grietas y defectos, se aplicar\u00e1n dos (2) capas (con un espesor m\u00ednimo de 8 mil\u00e9simas de pulgada cada una seca de material protector, Kopper&#039;s 300M o equivalente) a la superficie interior del pozo en la obra. Este material se aplicar\u00e1 de acuerdo con las especificaciones del fabricante y cubrir\u00e1 todos los huecos. Las capas deber\u00e1n tener colores contrastantes para facilitar su verificaci\u00f3n.<\/p>\n<p>O. Conexiones principales de pozo de registro a alcantarillado:<\/p>\n<p>1. Alcantarillado de PVC: La primera uni\u00f3n en los alcantarillados de entrada y salida de cada pozo, incluyendo las derivaciones de servicio, consistir\u00e1 en un acoplamiento de pozo aprobado, fijado con lechada en la pared del pozo, que proporcione un sello herm\u00e9tico continuo de elast\u00f3mero entre el acoplamiento y la tuber\u00eda insertada. El acoplamiento tendr\u00e1 un interior c\u00f3nico creciente desde la ranura de la junta para permitir flexibilidad a la tuber\u00eda en caso de asentamiento futuro del pozo o la tuber\u00eda. El primer tramo de tuber\u00eda de PVC que entre o salga del pozo tendr\u00e1 una longitud m\u00e1xima de dos (2) pies y ser\u00e1 de extremo liso con extremo liso o de extremo liso con campana. En la primera opci\u00f3n, la siguiente uni\u00f3n ser\u00e1 un acoplamiento de reparaci\u00f3n de PVC de doble campana (sin tope) con una separaci\u00f3n m\u00e1xima de una (1) pulgada entre las tuber\u00edas insertadas. En la segunda opci\u00f3n, la siguiente uni\u00f3n ser\u00e1 otra secci\u00f3n de dos (2) pies de longitud m\u00e1xima de tuber\u00eda de PVC de extremo liso con campana.<\/p>\n<p>2. Tuber\u00edas de hierro d\u00factil: El primer tramo de tuber\u00eda que entre o salga del pozo deber\u00e1 ser de 60 cm (2 pies) de hierro d\u00factil de extremo liso a extremo liso (es decir, 60 cm (2 pies), medidos desde la pared exterior), fijado con lechada directamente en la abertura de la pared del pozo. Este manguito corto de extremo liso a extremo liso se conectar\u00e1 al extremo de espiga de un tubo de hierro d\u00factil adyacente o a la tuber\u00eda de arcilla vitrificada con un adaptador Fernco.<\/p>\n<p>3. Tuber\u00edas de arcilla vitrificada (VCP): se retirar\u00e1n y reemplazar\u00e1n con tuber\u00edas de PVC o DI. Las nuevas tuber\u00edas se conectar\u00e1n a las VCP existentes mediante adaptadores Fernco adecuados.<\/p>\n<p>\u00a0\u00a0\u00a0<\/p>\n<p>4. Cuando una l\u00ednea lateral de servicio desemboca en un pozo de registro a una altura de dos (2) pies o menos, se deber\u00e1 instalar un desag\u00fce interno. Para desag\u00fces superiores a dos (2) pies por encima de la l\u00ednea principal de alcantarillado, se deber\u00e1 instalar una conexi\u00f3n de desag\u00fce en el exterior, con una prolongaci\u00f3n de limpieza hacia el pozo de registro. No se permiten pozos de registro de ladrillo con desag\u00fces externos.<\/p>\n<p>P. Marcos y tapas: Los marcos y tapas de hierro fundido se asentar\u00e1n sobre una capa de mortero y se ajustar\u00e1n cuidadosamente a la cota indicada en los planos. Se colocar\u00e1n un m\u00ednimo de 3 y un m\u00e1ximo de 5 hiladas de ladrillo debajo de los marcos para ajustar la cota de las tapas de las alcantarillas. El interior se sellar\u00e1 seg\u00fan lo especificado anteriormente para las alcantarillas.<\/p>","protected":false},"excerpt":{"rendered":"<p>SECTION 7 SANITARY SEWER GRAVITY COLLECTION SYSTEM 2. INSTALLATION A.\u00a0Proper and suitable tools and equipment for the safe and convenient [&hellip;]<\/p>\n","protected":false},"author":222,"featured_media":0,"parent":28940,"menu_order":183,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_searchwp_excluded":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[],"tags":[],"class_list":["post-29122","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Section 7  2. Installation - City of Miami Beach<\/title>\n<meta name=\"description\" content=\"%\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.miamibeachfl.gov\/es\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Section 7  2. Installation\" \/>\n<meta property=\"og:description\" content=\"%\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.miamibeachfl.gov\/es\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/\" \/>\n<meta property=\"og:site_name\" content=\"City of Miami Beach\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/cityofmiamibeach\" \/>\n<meta property=\"article:modified_time\" content=\"2018-01-26T20:36:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2024\/01\/1000pxSquare-miamibeach-aerial-southpointview.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@Miamibeachnews\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-7-2-installation\\\/\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-7-2-installation\\\/\",\"name\":\"Section 7 2. Installation - City of Miami Beach\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#website\"},\"datePublished\":\"2017-08-11T00:12:05+00:00\",\"dateModified\":\"2018-01-26T20:36:29+00:00\",\"description\":\"%\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-7-2-installation\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-7-2-installation\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-7-2-installation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"City Hall\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Public Works\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Engineering Division\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Section 7 2. Installation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#website\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\",\"name\":\"City of Miami Beach\",\"description\":\"The official website of the City of Miami Beach. Stay informed, find important information on city services, news, alerts, events, trolley routes, government employment and more.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#organization\",\"name\":\"City of Miami Beach\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/miamibeach-logoblue.png\",\"contentUrl\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/miamibeach-logoblue.png\",\"width\":1962,\"height\":381,\"caption\":\"City of Miami Beach\"},\"image\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/cityofmiamibeach\",\"https:\\\/\\\/x.com\\\/Miamibeachnews\",\"https:\\\/\\\/www.instagram.com\\\/miamibeachnews\\\/\"],\"description\":\"The official website of the City of Miami Beach. Stay informed, find important information on city services, news, alerts, events, trolley routes, government employment and more.\",\"telephone\":\"305.604.CITY(2489)\",\"legalName\":\"City of Miami Beach\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Secci\u00f3n 7 2. Instalaci\u00f3n - Ciudad de Miami Beach","description":"%","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.miamibeachfl.gov\/es\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/","og_locale":"es_ES","og_type":"article","og_title":"Section 7  2. Installation","og_description":"%","og_url":"https:\/\/www.miamibeachfl.gov\/es\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/","og_site_name":"City of Miami Beach","article_publisher":"https:\/\/www.facebook.com\/cityofmiamibeach","article_modified_time":"2018-01-26T20:36:29+00:00","og_image":[{"width":1000,"height":1000,"url":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2024\/01\/1000pxSquare-miamibeach-aerial-southpointview.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@Miamibeachnews","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/","url":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/","name":"Secci\u00f3n 7 2. Instalaci\u00f3n - Ciudad de Miami Beach","isPartOf":{"@id":"https:\/\/www.miamibeachfl.gov\/#website"},"datePublished":"2017-08-11T00:12:05+00:00","dateModified":"2018-01-26T20:36:29+00:00","description":"%","breadcrumb":{"@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.miamibeachfl.gov\/"},{"@type":"ListItem","position":2,"name":"City Hall","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/"},{"@type":"ListItem","position":3,"name":"Public Works","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/"},{"@type":"ListItem","position":4,"name":"Engineering Division","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/"},{"@type":"ListItem","position":5,"name":"Section 7 2. Installation"}]},{"@type":"WebSite","@id":"https:\/\/www.miamibeachfl.gov\/#website","url":"https:\/\/www.miamibeachfl.gov\/","name":"Ciudad de Miami Beach","description":"Sitio web oficial de la Ciudad de Miami Beach. Mant\u00e9ngase informado, encuentre informaci\u00f3n importante sobre servicios municipales, noticias, alertas, eventos, rutas de tranv\u00edas, empleos gubernamentales y m\u00e1s.","publisher":{"@id":"https:\/\/www.miamibeachfl.gov\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.miamibeachfl.gov\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/www.miamibeachfl.gov\/#organization","name":"Ciudad de Miami Beach","url":"https:\/\/www.miamibeachfl.gov\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.miamibeachfl.gov\/#\/schema\/logo\/image\/","url":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2022\/06\/miamibeach-logoblue.png","contentUrl":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2022\/06\/miamibeach-logoblue.png","width":1962,"height":381,"caption":"City of Miami Beach"},"image":{"@id":"https:\/\/www.miamibeachfl.gov\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/cityofmiamibeach","https:\/\/x.com\/Miamibeachnews","https:\/\/www.instagram.com\/miamibeachnews\/"],"description":"Sitio web oficial de la Ciudad de Miami Beach. Mant\u00e9ngase informado, encuentre informaci\u00f3n importante sobre servicios municipales, noticias, alertas, eventos, rutas de tranv\u00edas, empleos gubernamentales y m\u00e1s.","telephone":"305.604.CITY(2489)","legalName":"City of Miami Beach"}]}},"_links":{"self":[{"href":"https:\/\/www.miamibeachfl.gov\/es\/wp-json\/wp\/v2\/pages\/29122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.miamibeachfl.gov\/es\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.miamibeachfl.gov\/es\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/es\/wp-json\/wp\/v2\/users\/222"}],"replies":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/es\/wp-json\/wp\/v2\/comments?post=29122"}],"version-history":[{"count":0,"href":"https:\/\/www.miamibeachfl.gov\/es\/wp-json\/wp\/v2\/pages\/29122\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/es\/wp-json\/wp\/v2\/pages\/28940"}],"wp:attachment":[{"href":"https:\/\/www.miamibeachfl.gov\/es\/wp-json\/wp\/v2\/media?parent=29122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/es\/wp-json\/wp\/v2\/categories?post=29122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/es\/wp-json\/wp\/v2\/tags?post=29122"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}