{"id":29110,"date":"2017-08-11T00:11:58","date_gmt":"2017-08-11T00:11:58","guid":{"rendered":"http:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/table-of-contents-details\/section-6-b-installation\/"},"modified":"2018-01-26T15:35:46","modified_gmt":"2018-01-26T20:35:46","slug":"section-6-b-installation","status":"publish","type":"page","link":"https:\/\/www.miamibeachfl.gov\/fr\/city-hall\/public-works\/engineering-division\/section-6-b-installation\/","title":{"rendered":"Section 6 B. Installation"},"content":{"rendered":"<\/p>\n<p><strong>SECTION 6 DISTRIBUTION DE L&#039;EAU<\/p>\n<p>B. INSTALLATION<\/p>\n<p><\/strong><strong>1.01<\/strong>\u00a0<\/p>\n<p>\u00a0A. Tous les tuyaux en fonte ductile doivent \u00eatre install\u00e9s de mani\u00e8re droite et droite, conform\u00e9ment \u00e0 la derni\u00e8re r\u00e9vision de la norme ANSI\/AWWA C 600. La d\u00e9flexion admissible du tuyau ne doit pas d\u00e9passer 50% de la d\u00e9flexion maximale recommand\u00e9e par le fabricant du tuyau.<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0 B. Ruban d\u00e9tecteur\u00a0: Tous les tuyaux doivent \u00eatre munis d\u2019un ruban d\u00e9tecteur bleu de 7,6\u00a0cm de large pour les conduites principales. La mention \u00ab\u00a0ATTENTION, CONDUITE D\u2019EAU ENTERR\u00c9E\u00a0\u00bb doit \u00eatre imprim\u00e9e sur la face sup\u00e9rieure du tuyau \u00e0 intervalles de 76\u00a0cm le long du ruban. Le ruban doit \u00eatre plac\u00e9 \u00e0 45\u00a0cm sous le niveau du sol, au-dessus de toutes les conduites principales et de tous les services, ou selon les recommandations du fabricant. Un ruban non m\u00e9tallique doit \u00eatre utilis\u00e9 au-dessus des tuyaux en fonte ductile. Toutes les conduites principales en PVC doivent \u00eatre install\u00e9es avec un syst\u00e8me de localisation de fil de cuivre multibrins de calibre 14, compatible avec le localisateur de tuyaux et de c\u00e2bles Schonstedt MAC-51Bx, ou un syst\u00e8me \u00e9quivalent approuv\u00e9 par la Ville. Le fil doit \u00eatre attach\u00e9 au tuyau \u00e0 des intervalles maximum de 3\u00a0m et remont\u00e9 \u00e0 chaque bo\u00eete \u00e0 vannes, en laissant un exc\u00e9dent de fil de 1,2\u00a0m enroul\u00e9 \u00e0 chaque vanne. Lors de l\u2019essai de pression de la conduite principale, un essai de continuit\u00e9 doit \u00eatre effectu\u00e9 par l\u2019entrepreneur. Cet essai de continuit\u00e9 doit \u00eatre observ\u00e9 et approuv\u00e9 par le repr\u00e9sentant de la Ville et l\u2019ing\u00e9nieur responsable.<\/p>\n<p>\u00a0\u00a0\u00a0 C. La liti\u00e8re et le remblai initial doivent \u00eatre conformes aux d\u00e9tails approuv\u00e9s par la ville de Miami Beach.<\/p>\n<p>D. Les tuyaux en fonte ductile et en PVC doivent \u00eatre pos\u00e9s avec une couverture verticale minimale de 91 cm (36 po) sous le niveau du sol, sur les routes municipales et du FDOT. La couverture verticale minimale sur les tuyaux en fonte ductile et en PVC sur les routes du comt\u00e9 de Miami-Dade doit \u00eatre de 122 cm (48 po).<\/p>\n<p>\u00a0<\/p>\n<p>E. Le tuyau de branchement d&#039;eau minimal \u00e0 installer entre la conduite principale et le compteur doit \u00eatre en poly\u00e9thyl\u00e8ne d&#039;un diam\u00e8tre minimal de deux (2) pouces. Les raccordements des conduites de branchement d&#039;eau en poly\u00e9thyl\u00e8ne \u00e0 la conduite principale (qu&#039;il s&#039;agisse de conduites neuves ou existantes) doivent se faire par une selle \u00e0 double bride en acier inoxydable avec robinet d&#039;arr\u00eat. Les raccordements des conduites de branchement et des conduites d&#039;incendie en fonte ductile (de trois (3) pouces et plus) aux conduites principales existantes doivent se faire par une selle de piquage et une vanne, la vanne \u00e9tant contenue dans un bo\u00eetier de vanne. Les raccordements des conduites de branchement et des conduites d&#039;incendie en fonte ductile (de trois (3) pouces et plus) aux nouvelles conduites doivent se faire par un t\u00e9 et un robinet-vanne, la vanne \u00e9tant contenue dans un bo\u00eetier de vanne, sur la conduite de d\u00e9rivation de la conduite principale.<\/p>\n<p>\u00a0<\/p>\n<p>F. Les tuyaux et accessoires doivent \u00eatre descendus avec pr\u00e9caution dans la tranch\u00e9e \u00e0 l&#039;aide d&#039;une grue, de cordes, d&#039;\u00e9lingues ou de tout autre \u00e9quipement autoris\u00e9. En aucun cas, les mat\u00e9riaux de la conduite d&#039;eau ne doivent \u00eatre jet\u00e9s ou d\u00e9vers\u00e9s dans la tranch\u00e9e. Tous les tuyaux, raccords et accessoires doivent \u00eatre gain\u00e9s de tubes en poly\u00e9thyl\u00e8ne (8 mil) d&#039;\u00e9paisseur.<\/p>\n<p>\u00a0<\/p>\n<p>G. Des pr\u00e9cautions doivent \u00eatre prises pour \u00e9viter toute abrasion du rev\u00eatement des conduites. Sauf si n\u00e9cessaire pour les raccordements avec d&#039;autres conduites, les conduites doivent \u00eatre pos\u00e9es avec les collets orient\u00e9s dans le sens de la pose. Les d\u00e9fauts de rev\u00eatement doivent \u00eatre r\u00e9par\u00e9s sur place.<\/p>\n<p>H. Chaque section de tuyau doit reposer solidement sur le lit de la canalisation achev\u00e9e sur toute sa longueur, avec des \u00e9videments creus\u00e9s et profil\u00e9s pour accueillir les cloches, les raccords et les joints. Tout tuyau dont la pente ou le joint est perturb\u00e9 apr\u00e8s la pose doit \u00eatre retir\u00e9 et repos\u00e9.\u00a0<\/p>\n<p>I. Le raccordement \u00e0 la conduite d&#039;eau principale de la Ville ne doit \u00eatre effectu\u00e9 que si l&#039;eau dans la tranch\u00e9e au point de raccordement se trouve \u00e0 au moins 15 cm sous le fond de la conduite. En dehors des travaux, les extr\u00e9mit\u00e9s ouvertes des tuyaux, raccords et vannes doivent \u00eatre solidement obtur\u00e9es avec du film plastique ou du tissu filtrant afin d&#039;emp\u00eacher l&#039;eau de la tranch\u00e9e, la terre ou toute autre substance de p\u00e9n\u00e9trer dans les tuyaux ou les raccords. Si une partie du rev\u00eatement ou du rev\u00eatement est endommag\u00e9e, l&#039;entrepreneur doit la r\u00e9parer de mani\u00e8re satisfaisante \u00e0 ses frais. Les extr\u00e9mit\u00e9s de tuyaux laiss\u00e9es pour des raccordements ult\u00e9rieurs doivent \u00eatre obtur\u00e9es, bouch\u00e9es ou obtur\u00e9es et correctement retenues.<\/p>\n<p>J. City supervise le raccordement entre les anciennes et les nouvelles canalisations et r\u00e9alise tous les piquages humides sur les canalisations existantes. Les piquages sur mesure ne sont pas autoris\u00e9s, sauf autorisation de l&#039;ing\u00e9nieur municipal. Les presse-\u00e9toupes doivent \u00eatre test\u00e9s et subir un essai de pression de 120 psi pendant deux heures avant le piquage.<\/p>\n<p>K. La Ville doit r\u00e9aliser tous les robinets humides sur la tuyauterie existante et faire fonctionner toutes les vannes existantes.<\/p>\n<p>\n2.02 Contention<\/p>\n<p>A. Tous les tuyaux doivent \u00eatre retenus int\u00e9rieurement. Les tuyaux reli\u00e9s aux raccords, vannes et accessoires doivent \u00eatre retenus int\u00e9rieurement et le premier joint par des tiges de retenue ext\u00e9rieures en acier inoxydable. L&#039;utilisation de but\u00e9es est interdite, sauf autorisation \u00e9crite expresse des services des Travaux Publics.<\/p>\n<p>B. Tous les raccords et joints de tuyaux sp\u00e9cifiques doivent \u00eatre retenus comme indiqu\u00e9 ci-dessous (AUCUNE SUBSTITUTION) :<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0CONTENTION ARTICULAIRE<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0Harnais en PVC EBAA s\u00e9rie Iron 2800 \u00e0 embo\u00eeter<\/p>\n<p>\u00a0Push-On DIP TR-Flex par tuyau US ou Flex Ring par<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0S\u00e9rie am\u00e9ricaine ou EBAA Iron<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a01700 M\u00e9galug<\/p>\n<p>\u00a0Raccord avec tube DIP EBAA Iron Series 1100 Megalug<\/p>\n<p>\u00a0Raccord avec tube PVC EBAA Iron Series 2000 Megalug<\/p>\n<p>2.03 R\u00e9glage des vannes et des bo\u00eetes<\/p>\n<p>\u00a0\u00a0\u00a0 A. Installer aux endroits indiqu\u00e9s ou sp\u00e9cifi\u00e9s, et les placer d&#039;aplomb. Les bo\u00eetiers de vannes doivent \u00eatre centr\u00e9s sur les vannes et plac\u00e9s d&#039;aplomb au niveau du sol. Sauf indication contraire, les bo\u00eetiers doivent \u00eatre install\u00e9s au-dessus de chaque vanne.<\/p>\n<p>\u00a0\u00a0\u00a0 B. Dans la mesure du possible, les vannes doivent \u00eatre situ\u00e9es hors des voies de circulation et des parkings. Le remblai doit \u00eatre soigneusement compact\u00e9 autour de chaque bo\u00eetier de vanne sur une distance de 1,20 m (4 pi) de chaque c\u00f4t\u00e9 du bo\u00eetier, ou jusqu&#039;\u00e0 la paroi non remani\u00e9e de la tranch\u00e9e si la distance est inf\u00e9rieure \u00e0 1,20 m.<\/p>\n<p>C. Une vanne doit \u00eatre install\u00e9e \u00e0 tous les t\u00e9s et croisements de branchement, \u00e0 l&#039;exception des bornes d&#039;incendie et des conduites d&#039;incendie. L&#039;\u00e9crou de commande de la vanne doit \u00eatre situ\u00e9 \u00e0 un maximum de 30 cm sous le niveau du sol.<\/p>\n<p>D. Les bo\u00eetes \u00e0 vannes doivent \u00eatre entour\u00e9es d&#039;une dalle en b\u00e9ton arm\u00e9 de 12\u2033 x 12\u2033 x 8\u2033, sur les zones pav\u00e9es au niveau du sol et dans les zones de rigoles \u00e0 4\u2033 sous le niveau du sol pour le placement du gazon sur la dalle.<\/p>","protected":false},"excerpt":{"rendered":"<p>SECTION 6 WATER DISTRIBUTION B.\u00a0 INSTALLATION 1.01\u00a0 \u00a0A.\u00a0All ductile iron pipes shall be installed true and straight in accordance with [&hellip;]<\/p>\n","protected":false},"author":222,"featured_media":0,"parent":28940,"menu_order":183,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_searchwp_excluded":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[],"tags":[],"class_list":["post-29110","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Section 6  B.\u00a0 Installation - City of Miami Beach<\/title>\n<meta name=\"description\" content=\"%\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.miamibeachfl.gov\/fr\/city-hall\/public-works\/engineering-division\/section-6-b-installation\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Section 6  B.\u00a0 Installation\" \/>\n<meta property=\"og:description\" content=\"%\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.miamibeachfl.gov\/fr\/city-hall\/public-works\/engineering-division\/section-6-b-installation\/\" \/>\n<meta property=\"og:site_name\" content=\"City of Miami Beach\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/cityofmiamibeach\" \/>\n<meta property=\"article:modified_time\" content=\"2018-01-26T20:35:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2024\/01\/1000pxSquare-miamibeach-aerial-southpointview.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@Miamibeachnews\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-6-b-installation\\\/\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-6-b-installation\\\/\",\"name\":\"Section 6 B.\u00a0 Installation - City of Miami Beach\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#website\"},\"datePublished\":\"2017-08-11T00:11:58+00:00\",\"dateModified\":\"2018-01-26T20:35:46+00:00\",\"description\":\"%\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-6-b-installation\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-6-b-installation\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-6-b-installation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"City Hall\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Public Works\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Engineering Division\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Section 6 B.\u00a0 Installation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#website\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\",\"name\":\"City of Miami Beach\",\"description\":\"The official website of the City of Miami Beach. Stay informed, find important information on city services, news, alerts, events, trolley routes, government employment and more.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#organization\",\"name\":\"City of Miami Beach\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/miamibeach-logoblue.png\",\"contentUrl\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/miamibeach-logoblue.png\",\"width\":1962,\"height\":381,\"caption\":\"City of Miami Beach\"},\"image\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/cityofmiamibeach\",\"https:\\\/\\\/x.com\\\/Miamibeachnews\",\"https:\\\/\\\/www.instagram.com\\\/miamibeachnews\\\/\"],\"description\":\"The official website of the City of Miami Beach. Stay informed, find important information on city services, news, alerts, events, trolley routes, government employment and more.\",\"telephone\":\"305.604.CITY(2489)\",\"legalName\":\"City of Miami Beach\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Section 6 B. Installation - Ville de Miami Beach","description":"%","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.miamibeachfl.gov\/fr\/city-hall\/public-works\/engineering-division\/section-6-b-installation\/","og_locale":"fr_FR","og_type":"article","og_title":"Section 6  B.\u00a0 Installation","og_description":"%","og_url":"https:\/\/www.miamibeachfl.gov\/fr\/city-hall\/public-works\/engineering-division\/section-6-b-installation\/","og_site_name":"City of Miami Beach","article_publisher":"https:\/\/www.facebook.com\/cityofmiamibeach","article_modified_time":"2018-01-26T20:35:46+00:00","og_image":[{"width":1000,"height":1000,"url":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2024\/01\/1000pxSquare-miamibeach-aerial-southpointview.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@Miamibeachnews","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-6-b-installation\/","url":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-6-b-installation\/","name":"Section 6 B. Installation - Ville de Miami Beach","isPartOf":{"@id":"https:\/\/www.miamibeachfl.gov\/#website"},"datePublished":"2017-08-11T00:11:58+00:00","dateModified":"2018-01-26T20:35:46+00:00","description":"%","breadcrumb":{"@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-6-b-installation\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-6-b-installation\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-6-b-installation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.miamibeachfl.gov\/"},{"@type":"ListItem","position":2,"name":"City Hall","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/"},{"@type":"ListItem","position":3,"name":"Public Works","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/"},{"@type":"ListItem","position":4,"name":"Engineering Division","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/"},{"@type":"ListItem","position":5,"name":"Section 6 B.\u00a0 Installation"}]},{"@type":"WebSite","@id":"https:\/\/www.miamibeachfl.gov\/#website","url":"https:\/\/www.miamibeachfl.gov\/","name":"Ville de Miami Beach","description":"Site officiel de la ville de Miami Beach. Restez inform\u00e9 et trouvez des informations importantes sur les services municipaux, les actualit\u00e9s, les alertes, les \u00e9v\u00e9nements, les itin\u00e9raires de tramway, les emplois gouvernementaux et bien plus encore.","publisher":{"@id":"https:\/\/www.miamibeachfl.gov\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.miamibeachfl.gov\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.miamibeachfl.gov\/#organization","name":"Ville de Miami Beach","url":"https:\/\/www.miamibeachfl.gov\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.miamibeachfl.gov\/#\/schema\/logo\/image\/","url":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2022\/06\/miamibeach-logoblue.png","contentUrl":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2022\/06\/miamibeach-logoblue.png","width":1962,"height":381,"caption":"City of Miami Beach"},"image":{"@id":"https:\/\/www.miamibeachfl.gov\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/cityofmiamibeach","https:\/\/x.com\/Miamibeachnews","https:\/\/www.instagram.com\/miamibeachnews\/"],"description":"Site officiel de la ville de Miami Beach. Restez inform\u00e9 et trouvez des informations importantes sur les services municipaux, les actualit\u00e9s, les alertes, les \u00e9v\u00e9nements, les itin\u00e9raires de tramway, les emplois gouvernementaux et bien plus encore.","telephone":"305.604.CITY(2489)","legalName":"City of Miami Beach"}]}},"_links":{"self":[{"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/pages\/29110","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/users\/222"}],"replies":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/comments?post=29110"}],"version-history":[{"count":0,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/pages\/29110\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/pages\/28940"}],"wp:attachment":[{"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/media?parent=29110"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/categories?post=29110"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/tags?post=29110"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}