{"id":29122,"date":"2017-08-11T00:12:05","date_gmt":"2017-08-11T00:12:05","guid":{"rendered":"http:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/table-of-contents-details\/section-7-2-installation\/"},"modified":"2018-01-26T15:36:29","modified_gmt":"2018-01-26T20:36:29","slug":"section-7-2-installation","status":"publish","type":"page","link":"https:\/\/www.miamibeachfl.gov\/fr\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/","title":{"rendered":"Section 7 2. Installation"},"content":{"rendered":"<\/p>\n<p><strong>SECTION 7 SYST\u00c8ME DE COLLECTE GRAVIQUE DES \u00c9GOUTS SANITAIRES<\/p>\n<p>2. INSTALLATION<\/strong><\/p>\n<p>A. Des outils et \u00e9quipements appropri\u00e9s et adapt\u00e9s \u00e0 la manutention et \u00e0 la pose des tuyaux doivent \u00eatre utilis\u00e9s, conform\u00e9ment aux recommandations du fabricant. Lors de la pose, les tuyaux doivent \u00eatre soigneusement examin\u00e9s pour d\u00e9celer tout d\u00e9faut. Si un tuyau est d\u00e9couvert apr\u00e8s la pose, il doit \u00eatre retir\u00e9 et remplac\u00e9 par un tuyau en bon \u00e9tat par l&#039;entrepreneur, \u00e0 ses frais.<\/p>\n<p>B. L&#039;excavation et le remblayage des tranch\u00e9es et des regards doivent \u00eatre sp\u00e9cifi\u00e9s dans la section Excavation et remblayage du chantier pour les services publics et les structures du Manuel des travaux publics du CMB.<\/p>\n<p>C. Si l&#039;emplacement de l&#039;\u00e9gout n&#039;est pas clairement d\u00e9fini, l&#039;installer de mani\u00e8re \u00e0 ce qu&#039;il soit \u00e0 au moins 1,80 m (6 pi) horizontalement, face \u00e0 face (de pr\u00e9f\u00e9rence 3 m) d&#039;une conduite d&#039;alimentation en eau principale ou d&#039;une conduite de service. Lorsque le bas de la conduite d&#039;eau se trouve \u00e0 au moins 45 cm (18 po) au-dessus du haut de la conduite d&#039;\u00e9gout, l&#039;espacement horizontal peut \u00eatre d&#039;au moins 1,80 m (6 pi) entre les faces de la conduite (voir la section (IV)(A)(4) pour le mat\u00e9riau de la conduite).<\/p>\n<p>D. La largeur des tranch\u00e9es en sols stables doit offrir un espace libre maximal de 30 cm (12 po) de chaque c\u00f4t\u00e9, entre l&#039;ext\u00e9rieur du f\u00fbt du tube et la face de l&#039;excavation, ou le rev\u00eatement si utilis\u00e9, mesur\u00e9 \u00e0 30 cm (12 po) au-dessus du sommet du tube. Dans les m\u00eames conditions, la largeur minimale des tranch\u00e9es doit \u00eatre d&#039;au moins 15 cm (6 po) de chaque c\u00f4t\u00e9. Cette largeur minimale est n\u00e9cessaire pour permettre \u00e0 une personne de placer et de compacter les remblais et le mat\u00e9riau de remblai initial. Dans les sols instables (tourbe, paillis ou autres sols organiques, limons \u00e9lastiques, argile ou sables fins sous la nappe phr\u00e9atique), la largeur des tranch\u00e9es doit \u00eatre d&#039;au moins cinq (5) diam\u00e8tres nominaux de tube mesur\u00e9s \u00e0 30 cm (12 po) au-dessus du sommet du tube, afin de permettre l&#039;installation et le compactage des \u00e9quipements de tranch\u00e9e et de compactage.<\/p>\n<p>E. La liti\u00e8re et le remblai initial \u00e0 6 pouces en dessous et \u00e0 12 pouces au-dessus des conduites d&#039;\u00e9gout et des services doivent \u00eatre constitu\u00e9s de sable grossier sans roches de plus de \u00be de pouce de diam\u00e8tre.<\/p>\n<p>\u00a0<\/p>\n<p>F. Fa\u00e7onner le fond de la tranch\u00e9e \u00e0 la main afin d&#039;assurer un support circonf\u00e9rentiel sensiblement uniforme au bas de chaque tuyau. Le cas \u00e9ch\u00e9ant, la pose des tuyaux doit se faire en amont, les extr\u00e9mit\u00e9s des bouts m\u00e2les \u00e9tant orient\u00e9es dans le sens de l&#039;\u00e9coulement.<\/p>\n<p>G. Le tuyau sera pos\u00e9 dans la tranch\u00e9e pr\u00e9par\u00e9e, conform\u00e9ment au profil et au niveau. Le f\u00fbt du tuyau b\u00e9n\u00e9ficiera d&#039;un support continu et uniforme, sans aucune pression exerc\u00e9e sur les joints du tuyau depuis le fond de la tranch\u00e9e.<\/p>\n<p>H. Un ruban d\u00e9tecteur en plastique \u00ab vert \u00bb avec une feuille m\u00e9tallique et portant les mots \u00ab ATTENTION CONDUITE D&#039;\u00c9GOUT ENTERR\u00c9E EN DESSOUS \u00bb imprim\u00e9s \u00e0 des intervalles de 30 pouces le long du ruban, doit \u00eatre plac\u00e9 \u00e0 18 pouces au-dessus de toutes les conduites d&#039;\u00e9gout principales et lat\u00e9rales.<\/p>\n<p>I. Chaque conduite doit \u00eatre pos\u00e9e conform\u00e9ment \u00e0 l&#039;alignement et \u00e0 la pente indiqu\u00e9s sur les plans, de mani\u00e8re \u00e0 former un joint concentrique \u00e9troit avec la conduite adjacente et \u00e0 \u00e9viter tout d\u00e9calage soudain de la conduite d&#039;\u00e9coulement. Les conduites doivent \u00eatre pos\u00e9es de mani\u00e8re \u00e0 ce que les marquages d&#039;identification soient situ\u00e9s sur le dessus des canalisations install\u00e9es. L&#039;entrepreneur doit utiliser des instruments de topographie pour maintenir l&#039;alignement et la pente. Au moins une prise de vue en \u00e9l\u00e9vation doit \u00eatre effectu\u00e9e \u00e0 chaque joint de conduite.<\/p>\n<p>J. L&#039;int\u00e9rieur des canalisations d&#039;\u00e9gout doit \u00eatre maintenu propre et exempt de toute salet\u00e9 et de tout mat\u00e9riau superflu. Si le nettoyage apr\u00e8s la pose est difficile en raison de la petite taille des canalisations, un \u00e9couvillon ou une raclette appropri\u00e9e doit \u00eatre plac\u00e9 dans la canalisation et tir\u00e9 vers l&#039;avant au-del\u00e0 de chaque joint imm\u00e9diatement apr\u00e8s la fin des travaux. En cas d&#039;interruption des travaux, quelle qu&#039;en soit la raison, un bouchon appropri\u00e9 doit \u00eatre plac\u00e9 \u00e0 l&#039;extr\u00e9mit\u00e9 de la derni\u00e8re canalisation pos\u00e9e afin d&#039;emp\u00eacher la p\u00e9n\u00e9tration de boue ou de tout autre corps \u00e9tranger. Un support ad\u00e9quat doit alors \u00eatre pr\u00e9vu pour maintenir la canalisation en place contre le soul\u00e8vement d\u00fb \u00e0 l&#039;eau dans la tranch\u00e9e. Toute canalisation d\u00e9fectueuse doit \u00eatre imm\u00e9diatement retir\u00e9e et remplac\u00e9e par une canalisation en bon \u00e9tat.<\/p>\n<p>K. Les tuyaux d&#039;\u00e9gout doivent \u00eatre install\u00e9s conform\u00e9ment \u00e0 la derni\u00e8re r\u00e9vision de la norme ASTM D2321 et aux \u00ab Pratiques recommand\u00e9es pour l&#039;installation de tuyaux d&#039;\u00e9gout en PVC \u00bb de l&#039;Uni-Bell Plastic Pipe Association.<\/p>\n<p>L. Les regards doivent \u00eatre construits conform\u00e9ment aux plans et aux sp\u00e9cifications de la ville de Miami Beach. Les ouvertures des tuyaux des regards doivent \u00eatre scell\u00e9es avec du coulis \u00e9lastom\u00e8re ou un produit \u00e9quivalent approuv\u00e9. Aucun enduit de moulage n&#039;est autoris\u00e9.<\/p>\n<p>M. Les caniveaux de retournement doivent \u00eatre constitu\u00e9s de briques ou de moellons de briques, soigneusement pos\u00e9s et recouverts d&#039;un coulis sable-ciment, et fa\u00e7onn\u00e9s avec pr\u00e9cision pour former un fond semi-circulaire \u00e9pousant l&#039;int\u00e9rieur de la section d&#039;\u00e9gout adjacente. Les pentes abruptes \u00e0 l&#039;ext\u00e9rieur des caniveaux de retournement doivent \u00eatre \u00e9vit\u00e9es. Les changements de dimension et de pente doivent \u00eatre progressifs et r\u00e9guliers. Les changements de direction de l&#039;\u00e9gout ou de la branche d&#039;entr\u00e9e doivent suivre une courbe douce dont le rayon est aussi long que possible.<\/p>\n<p>N. Une fois les regards install\u00e9s et inspect\u00e9s par la Ville pour d\u00e9celer les fissures et les d\u00e9fauts, deux (2) couches (d&#039;une \u00e9paisseur minimale de 8 mils chacune, \u00e0 sec, de mat\u00e9riau protecteur, Kopper&#039;s 300M ou \u00e9quivalent) doivent \u00eatre appliqu\u00e9es sur la surface int\u00e9rieure du regard sur le chantier. Ce mat\u00e9riau doit \u00eatre appliqu\u00e9 conform\u00e9ment aux sp\u00e9cifications du fabricant et couvrir tous les vides. Les couches doivent \u00eatre de couleurs contrast\u00e9es pour faciliter la v\u00e9rification.<\/p>\n<p>O. Raccordements du regard au collecteur d&#039;\u00e9gout :<\/p>\n<p>1. \u00c9gouts en PVC\u00a0: Le premier joint, tant pour les \u00e9gouts entrants que sortants de chaque regard, y compris les branchements lat\u00e9raux, doit \u00eatre constitu\u00e9 d&#039;un manchon de regard approuv\u00e9, scell\u00e9 dans la paroi du regard et assurant une \u00e9tanch\u00e9it\u00e9 continue par joint \u00e9lastom\u00e8re entre le manchon et le tuyau qui y est ins\u00e9r\u00e9. Le manchon doit pr\u00e9senter une forme conique croissante \u00e0 l&#039;int\u00e9rieur de la rainure du joint afin de permettre une certaine flexibilit\u00e9 du tuyau en cas de tassement ult\u00e9rieur du regard ou de la canalisation. La premi\u00e8re section de tuyau en PVC entrant ou sortant du regard doit mesurer au maximum 60\u00a0cm de long et \u00eatre soit lisse sur lisse, soit lisse sur embase. Dans le premier cas, le joint suivant doit \u00eatre un manchon de r\u00e9paration en PVC \u00e0 double embase (sans but\u00e9e) avec un espace maximal de 2,5\u00a0cm entre les tuyaux qui y sont ins\u00e9r\u00e9s. Dans le second cas, le joint suivant doit \u00eatre une autre section de tuyau en PVC de 60\u00a0cm de long au maximum, lisse sur embase.<\/p>\n<p>2. Tuyaux en fonte ductile\u00a0: La premi\u00e8re section de tuyau entrant ou sortant du regard doit \u00eatre un tube en fonte ductile lisse de 60\u00a0cm (soit 60\u00a0cm, mesur\u00e9 \u00e0 partir du mur ext\u00e9rieur) scell\u00e9 directement dans l&#039;ouverture du regard. Ce manchon court lisse-lisse doit \u00eatre raccord\u00e9 \u00e0 l&#039;extr\u00e9mit\u00e9 m\u00e2le d&#039;un tuyau en fonte ductile adjacent ou au tuyau en gr\u00e8s c\u00e9rame \u00e0 l&#039;aide d&#039;un adaptateur Fernco.<\/p>\n<p>3. Tuyaux en gr\u00e8s c\u00e9rame (VCP)\u00a0: ils doivent \u00eatre retir\u00e9s et remplac\u00e9s par des tuyaux en PVC ou en fonte ductile. Les nouveaux tuyaux doivent \u00eatre raccord\u00e9s aux VCP existants \u00e0 l&#039;aide d&#039;adaptateurs Fernco appropri\u00e9s.<\/p>\n<p>\u00a0\u00a0\u00a0<\/p>\n<p>4. Lorsqu&#039;une canalisation secondaire p\u00e9n\u00e8tre dans un regard \u00e0 une hauteur de deux (2) pieds ou moins, une d\u00e9nivellation interne doit \u00eatre pr\u00e9vue. Pour les d\u00e9nivellations sup\u00e9rieures \u00e0 deux (2) pieds au-dessus du radier de la conduite d&#039;\u00e9gout, un raccordement de d\u00e9nivellation ext\u00e9rieur, avec une extension de nettoyage dans le regard, doit \u00eatre pr\u00e9vu. Les regards en brique avec d\u00e9nivellation ext\u00e9rieure sont interdits.<\/p>\n<p>P. Cadres et couvercles\u00a0: Les cadres et couvercles en fonte doivent \u00eatre pos\u00e9s sur un lit de mortier et soigneusement ajust\u00e9s \u00e0 la hauteur indiqu\u00e9e sur les plans. Un minimum de trois et un maximum de cinq rang\u00e9es de briques doivent \u00eatre pr\u00e9vues sous les cadres pour permettre le r\u00e9glage de la hauteur des couvercles de regard. L&#039;int\u00e9rieur doit \u00eatre scell\u00e9 comme indiqu\u00e9 ci-dessus pour les regards.<\/p>","protected":false},"excerpt":{"rendered":"<p>SECTION 7 SANITARY SEWER GRAVITY COLLECTION SYSTEM 2. INSTALLATION A.\u00a0Proper and suitable tools and equipment for the safe and convenient [&hellip;]<\/p>\n","protected":false},"author":222,"featured_media":0,"parent":28940,"menu_order":183,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_searchwp_excluded":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[],"tags":[],"class_list":["post-29122","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Section 7  2. Installation - City of Miami Beach<\/title>\n<meta name=\"description\" content=\"%\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.miamibeachfl.gov\/fr\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Section 7  2. Installation\" \/>\n<meta property=\"og:description\" content=\"%\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.miamibeachfl.gov\/fr\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/\" \/>\n<meta property=\"og:site_name\" content=\"City of Miami Beach\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/cityofmiamibeach\" \/>\n<meta property=\"article:modified_time\" content=\"2018-01-26T20:36:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2024\/01\/1000pxSquare-miamibeach-aerial-southpointview.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@Miamibeachnews\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-7-2-installation\\\/\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-7-2-installation\\\/\",\"name\":\"Section 7 2. Installation - City of Miami Beach\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#website\"},\"datePublished\":\"2017-08-11T00:12:05+00:00\",\"dateModified\":\"2018-01-26T20:36:29+00:00\",\"description\":\"%\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-7-2-installation\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-7-2-installation\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-7-2-installation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"City Hall\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Public Works\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Engineering Division\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Section 7 2. Installation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#website\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\",\"name\":\"City of Miami Beach\",\"description\":\"The official website of the City of Miami Beach. Stay informed, find important information on city services, news, alerts, events, trolley routes, government employment and more.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#organization\",\"name\":\"City of Miami Beach\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/miamibeach-logoblue.png\",\"contentUrl\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/miamibeach-logoblue.png\",\"width\":1962,\"height\":381,\"caption\":\"City of Miami Beach\"},\"image\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/cityofmiamibeach\",\"https:\\\/\\\/x.com\\\/Miamibeachnews\",\"https:\\\/\\\/www.instagram.com\\\/miamibeachnews\\\/\"],\"description\":\"The official website of the City of Miami Beach. Stay informed, find important information on city services, news, alerts, events, trolley routes, government employment and more.\",\"telephone\":\"305.604.CITY(2489)\",\"legalName\":\"City of Miami Beach\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Section 7 2. Installation - Ville de Miami Beach","description":"%","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.miamibeachfl.gov\/fr\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/","og_locale":"fr_FR","og_type":"article","og_title":"Section 7  2. Installation","og_description":"%","og_url":"https:\/\/www.miamibeachfl.gov\/fr\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/","og_site_name":"City of Miami Beach","article_publisher":"https:\/\/www.facebook.com\/cityofmiamibeach","article_modified_time":"2018-01-26T20:36:29+00:00","og_image":[{"width":1000,"height":1000,"url":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2024\/01\/1000pxSquare-miamibeach-aerial-southpointview.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@Miamibeachnews","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/","url":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/","name":"Section 7 2. Installation - Ville de Miami Beach","isPartOf":{"@id":"https:\/\/www.miamibeachfl.gov\/#website"},"datePublished":"2017-08-11T00:12:05+00:00","dateModified":"2018-01-26T20:36:29+00:00","description":"%","breadcrumb":{"@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.miamibeachfl.gov\/"},{"@type":"ListItem","position":2,"name":"City Hall","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/"},{"@type":"ListItem","position":3,"name":"Public Works","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/"},{"@type":"ListItem","position":4,"name":"Engineering Division","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/"},{"@type":"ListItem","position":5,"name":"Section 7 2. Installation"}]},{"@type":"WebSite","@id":"https:\/\/www.miamibeachfl.gov\/#website","url":"https:\/\/www.miamibeachfl.gov\/","name":"Ville de Miami Beach","description":"Site officiel de la ville de Miami Beach. Restez inform\u00e9 et trouvez des informations importantes sur les services municipaux, les actualit\u00e9s, les alertes, les \u00e9v\u00e9nements, les itin\u00e9raires de tramway, les emplois gouvernementaux et bien plus encore.","publisher":{"@id":"https:\/\/www.miamibeachfl.gov\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.miamibeachfl.gov\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.miamibeachfl.gov\/#organization","name":"Ville de Miami Beach","url":"https:\/\/www.miamibeachfl.gov\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.miamibeachfl.gov\/#\/schema\/logo\/image\/","url":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2022\/06\/miamibeach-logoblue.png","contentUrl":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2022\/06\/miamibeach-logoblue.png","width":1962,"height":381,"caption":"City of Miami Beach"},"image":{"@id":"https:\/\/www.miamibeachfl.gov\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/cityofmiamibeach","https:\/\/x.com\/Miamibeachnews","https:\/\/www.instagram.com\/miamibeachnews\/"],"description":"Site officiel de la ville de Miami Beach. Restez inform\u00e9 et trouvez des informations importantes sur les services municipaux, les actualit\u00e9s, les alertes, les \u00e9v\u00e9nements, les itin\u00e9raires de tramway, les emplois gouvernementaux et bien plus encore.","telephone":"305.604.CITY(2489)","legalName":"City of Miami Beach"}]}},"_links":{"self":[{"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/pages\/29122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/users\/222"}],"replies":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/comments?post=29122"}],"version-history":[{"count":0,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/pages\/29122\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/pages\/28940"}],"wp:attachment":[{"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/media?parent=29122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/categories?post=29122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/tags?post=29122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}