{"id":395720,"date":"2026-01-28T16:54:32","date_gmt":"2026-01-28T21:54:32","guid":{"rendered":"https:\/\/www.miamibeachfl.gov\/?p=395720"},"modified":"2026-01-28T17:05:50","modified_gmt":"2026-01-28T22:05:50","slug":"commercial-marine","status":"publish","type":"post","link":"https:\/\/www.miamibeachfl.gov\/fr\/commercial-marine\/","title":{"rendered":"Liste de v\u00e9rification des permis de construction \u2013 Marine commerciale"},"content":{"rendered":"Menu du b\u00e2timent\t\t\t\n\t\t\t\t\t<ul id=\"menu-building-department\"><li id=\"menu-item-270333\" aria-haspopup=\"true\"><a aria-expanded=\"false\" href=\"\/fr\/city-hall\/building\/permits\/\">Demande de permis<\/a>\n<ul>\n\t<li id=\"menu-item-286727\"><a href=\"\/fr\/city-hall\/building\/permits\/\">Le processus d&#039;autorisation \u2013 Comment postuler<\/a><\/li>\n\t<li id=\"menu-item-271067\"><a href=\"\/fr\/city-hall\/building\/permits\/permitchecklists\/\">Listes de contr\u00f4le des permis<\/a><\/li>\n\t<li id=\"menu-item-322770\"><a href=\"\/fr\/city-hall\/building\/permits\/same-day-services\/\">Service le jour m\u00eame<\/a><\/li>\n\t<li id=\"menu-item-270341\"><a href=\"\/fr\/city-hall\/building\/onlinepermits\/\">Centre de ressources pour les permis en ligne \u2013 Postulez en ligne<\/a><\/li>\n\t<li id=\"menu-item-270340\"><a href=\"\/fr\/city-hall\/building\/permits\/interactive-permit-guide\/\">Guide interactif des permis<\/a><\/li>\n\t<li id=\"menu-item-340585\"><a href=\"\/fr\/city-hall\/building\/permits\/expired-permits-and-permit-renewals\/\">Permis expir\u00e9s et renouvellements de permis<\/a><\/li>\n<\/ul>\n<\/li>\n<li id=\"menu-item-312699\" aria-haspopup=\"true\"><a aria-expanded=\"false\" href=\"#\">Ressources relatives aux permis<\/a>\n<ul>\n\t<li id=\"menu-item-280603\"><a href=\"\/wp-content\/uploads\/2025\/10\/Building-Department-Fee-Guide-2025.pdf\">Grille tarifaire<\/a><\/li>\n\t<li id=\"menu-item-272445\"><a href=\"\/fr\/city-hall\/building\/permits\/building-permits-not-required-work-list\/\">Liste des permis non requis<\/a><\/li>\n\t<li id=\"menu-item-285785\"><a href=\"\/fr\/city-hall\/building\/permits\/permit-refunds\/\">Remboursements de permis<\/a><\/li>\n\t<li id=\"menu-item-285786\"><a href=\"\/fr\/city-hall\/building\/permits\/building-permit-reprieve-program\/\">Programme d&#039;amnistie pour les violations du code du b\u00e2timent<\/a><\/li>\n\t<li id=\"menu-item-270348\"><a href=\"\/fr\/city-hall\/building\/building-recert\/\">Recertification des b\u00e2timents<\/a><\/li>\n\t<li id=\"menu-item-298042\"><a href=\"\/fr\/city-hall\/building\/permits\/fema-50-rule\/\">R\u00e8gle Fema 50%<\/a><\/li>\n\t<li id=\"menu-item-270344\"><a href=\"\/fr\/city-hall\/building\/permits\/mdc\/\">Comt\u00e9 de Miami-Dade<\/a><\/li>\n\t<li id=\"menu-item-270345\"><a href=\"\/fr\/city-hall\/building\/permits\/phased-permits\/\">Permis \u00e9chelonn\u00e9s<\/a><\/li>\n\t<li id=\"menu-item-270342\"><a href=\"\/fr\/city-hall\/building\/permits\/green\/\">Permis verts<\/a><\/li>\n\t<li id=\"menu-item-270346\"><a href=\"\/fr\/city-hall\/building\/statistics\/\">Tableaux de bord statistiques<\/a><\/li>\n\t<li id=\"menu-item-286018\"><a href=\"\/fr\/permits-search-dashboard\/\">Recherche de permis d&#039;archivage<\/a><\/li>\n<\/ul>\n<\/li>\n<li id=\"menu-item-270334\"><a href=\"\/fr\/city-hall\/building\/forms\/\">Formulaires<\/a><\/li>\n<li id=\"menu-item-270335\"><a href=\"\/fr\/city-hall\/building\/inspections\/\">Inspections<\/a><\/li>\n<li id=\"menu-item-270336\"><a href=\"\/fr\/city-hall\/building\/violations\/\">Infractions<\/a><\/li>\n<li id=\"menu-item-270339\"><a href=\"\/fr\/city-hall\/building\/contractors\/\">Entrepreneurs<\/a><\/li>\n<li id=\"menu-item-270338\"><a href=\"\/fr\/city-hall\/building\/contact-us\/\">Contactez-nous<\/a><\/li>\n<li id=\"menu-item-270337\" aria-haspopup=\"true\"><a aria-expanded=\"false\" href=\"#\">Plus de liens<\/a>\n<ul>\n\t<li id=\"menu-item-270352\"><a href=\"\/fr\/city-hall\/building\/faq\/\">FAQ<\/a><\/li>\n\t<li id=\"menu-item-270350\"><a href=\"\/fr\/city-hall\/building\/events\/\">\u00c9v\u00e9nements et annonces<\/a><\/li>\n\t<li id=\"menu-item-270353\"><a href=\"\/fr\/city-hall\/building\/local-flood-hazard-info\/\">Gestion des plaines inondables<\/a><\/li>\n\t<li id=\"menu-item-270347\"><a href=\"\/fr\/city-hall\/building\/hurricane-preparedness\/\">Pr\u00e9paration aux ouragans<\/a><\/li>\n\t<li id=\"menu-item-270349\"><a href=\"\/fr\/city-hall\/building\/records-management\/\">Gestion des documents<\/a><\/li>\n\t<li id=\"menu-item-270343\"><a href=\"\/fr\/city-hall\/building\/permits\/private-provider-info\/\">Informations sur les fournisseurs priv\u00e9s<\/a><\/li>\n\t<li id=\"menu-item-280714\"><a href=\"\/fr\/city-hall\/building\/building-recert\/annual-maintenance-log\/\">Journal de maintenance annuel<\/a><\/li>\n\t<li id=\"menu-item-285447\"><a href=\"\/fr\/city-hall\/building\/sop\/\">AMADOUER<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\t\nMenu du b\u00e2timent \u00d7\t\t\t\t\t\t<ul id=\"menu-building-department-1\"><li id=\"menu-item-270333\" aria-haspopup=\"true\"><a aria-expanded=\"false\" href=\"\/fr\/city-hall\/building\/permits\/\">Demande de permis<\/a>\n<ul>\n\t<li id=\"menu-item-286727\"><a href=\"\/fr\/city-hall\/building\/permits\/\">Le processus d&#039;autorisation \u2013 Comment postuler<\/a><\/li>\n\t<li id=\"menu-item-271067\"><a href=\"\/fr\/city-hall\/building\/permits\/permitchecklists\/\">Listes de contr\u00f4le des permis<\/a><\/li>\n\t<li id=\"menu-item-322770\"><a href=\"\/fr\/city-hall\/building\/permits\/same-day-services\/\">Service le jour m\u00eame<\/a><\/li>\n\t<li id=\"menu-item-270341\"><a href=\"\/fr\/city-hall\/building\/onlinepermits\/\">Centre de ressources pour les permis en ligne \u2013 Postulez en ligne<\/a><\/li>\n\t<li id=\"menu-item-270340\"><a href=\"\/fr\/city-hall\/building\/permits\/interactive-permit-guide\/\">Guide interactif des permis<\/a><\/li>\n\t<li id=\"menu-item-340585\"><a href=\"\/fr\/city-hall\/building\/permits\/expired-permits-and-permit-renewals\/\">Permis expir\u00e9s et renouvellements de permis<\/a><\/li>\n<\/ul>\n<\/li>\n<li id=\"menu-item-312699\" aria-haspopup=\"true\"><a aria-expanded=\"false\" href=\"#\">Ressources relatives aux permis<\/a>\n<ul>\n\t<li id=\"menu-item-280603\"><a href=\"\/wp-content\/uploads\/2025\/10\/Building-Department-Fee-Guide-2025.pdf\">Grille tarifaire<\/a><\/li>\n\t<li id=\"menu-item-272445\"><a href=\"\/fr\/city-hall\/building\/permits\/building-permits-not-required-work-list\/\">Liste des permis non requis<\/a><\/li>\n\t<li id=\"menu-item-285785\"><a href=\"\/fr\/city-hall\/building\/permits\/permit-refunds\/\">Remboursements de permis<\/a><\/li>\n\t<li id=\"menu-item-285786\"><a href=\"\/fr\/city-hall\/building\/permits\/building-permit-reprieve-program\/\">Programme d&#039;amnistie pour les violations du code du b\u00e2timent<\/a><\/li>\n\t<li id=\"menu-item-270348\"><a href=\"\/fr\/city-hall\/building\/building-recert\/\">Recertification des b\u00e2timents<\/a><\/li>\n\t<li id=\"menu-item-298042\"><a href=\"\/fr\/city-hall\/building\/permits\/fema-50-rule\/\">R\u00e8gle Fema 50%<\/a><\/li>\n\t<li id=\"menu-item-270344\"><a href=\"\/fr\/city-hall\/building\/permits\/mdc\/\">Comt\u00e9 de Miami-Dade<\/a><\/li>\n\t<li id=\"menu-item-270345\"><a href=\"\/fr\/city-hall\/building\/permits\/phased-permits\/\">Permis \u00e9chelonn\u00e9s<\/a><\/li>\n\t<li id=\"menu-item-270342\"><a href=\"\/fr\/city-hall\/building\/permits\/green\/\">Permis verts<\/a><\/li>\n\t<li id=\"menu-item-270346\"><a href=\"\/fr\/city-hall\/building\/statistics\/\">Tableaux de bord statistiques<\/a><\/li>\n\t<li id=\"menu-item-286018\"><a href=\"\/fr\/permits-search-dashboard\/\">Recherche de permis d&#039;archivage<\/a><\/li>\n<\/ul>\n<\/li>\n<li id=\"menu-item-270334\"><a href=\"\/fr\/city-hall\/building\/forms\/\">Formulaires<\/a><\/li>\n<li id=\"menu-item-270335\"><a href=\"\/fr\/city-hall\/building\/inspections\/\">Inspections<\/a><\/li>\n<li id=\"menu-item-270336\"><a href=\"\/fr\/city-hall\/building\/violations\/\">Infractions<\/a><\/li>\n<li id=\"menu-item-270339\"><a href=\"\/fr\/city-hall\/building\/contractors\/\">Entrepreneurs<\/a><\/li>\n<li id=\"menu-item-270338\"><a href=\"\/fr\/city-hall\/building\/contact-us\/\">Contactez-nous<\/a><\/li>\n<li id=\"menu-item-270337\" aria-haspopup=\"true\"><a aria-expanded=\"false\" href=\"#\">Plus de liens<\/a>\n<ul>\n\t<li id=\"menu-item-270352\"><a href=\"\/fr\/city-hall\/building\/faq\/\">FAQ<\/a><\/li>\n\t<li id=\"menu-item-270350\"><a href=\"\/fr\/city-hall\/building\/events\/\">\u00c9v\u00e9nements et annonces<\/a><\/li>\n\t<li id=\"menu-item-270353\"><a href=\"\/fr\/city-hall\/building\/local-flood-hazard-info\/\">Gestion des plaines inondables<\/a><\/li>\n\t<li id=\"menu-item-270347\"><a href=\"\/fr\/city-hall\/building\/hurricane-preparedness\/\">Pr\u00e9paration aux ouragans<\/a><\/li>\n\t<li id=\"menu-item-270349\"><a href=\"\/fr\/city-hall\/building\/records-management\/\">Gestion des documents<\/a><\/li>\n\t<li id=\"menu-item-270343\"><a href=\"\/fr\/city-hall\/building\/permits\/private-provider-info\/\">Informations sur les fournisseurs priv\u00e9s<\/a><\/li>\n\t<li id=\"menu-item-280714\"><a href=\"\/fr\/city-hall\/building\/building-recert\/annual-maintenance-log\/\">Journal de maintenance annuel<\/a><\/li>\n\t<li id=\"menu-item-285447\"><a href=\"\/fr\/city-hall\/building\/sop\/\">AMADOUER<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\t\t\t\t\n\t\t\t<a href=\"https:\/\/cityofmiamibeachfl.tylerportico.com\/navigator\/public\/selections?parentId=14966\" target=\"_self\">\n\t\t\t\t\t\tRetour au service de conciergerie des services municipaux\n\t\t\t\t\t<\/a>\n\t\t\t\t<img decoding=\"async\" src=\"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2025\/10\/icon-permits.png\" alt=\"Permits\" itemprop=\"image\" height=\"225\" width=\"225\" title=\"ic\u00f4nes-permis\" onerror=\"this.style.display='none'\" loading=\"lazy\" \/>\n<h2>\n\t\t\tLes projets peuvent n\u00e9cessiter l&#039;approbation du conseil d&#039;urbanisme avant la soumission du permis de construire\t<\/h2>\n\t<p><a href=\"https:\/\/www.miamibeachfl.gov\/fr\/city-hall\/planning\/planning-document-checklist\/\"><button>Pour acc\u00e9der aux listes de contr\u00f4le du service de planification, cliquez ici.<\/button><\/a><\/p>\n\t<p><a href=\"\/fr\/city-hall\/building\/onlinepermits\/\"><button>Pour acc\u00e9der aux ressources en ligne concernant les permis, cliquez ici.<\/button><\/a><\/p>\n\t<p>Inclut les copropri\u00e9t\u00e9s et les immeubles d&#039;appartements.<\/p>\n<strong>Examens du plan :<br \/>\n<\/strong>Groupe B\u00e2timent - M\u00e9tiers multiples, Environnement, Incendie, Planification, Travaux publics, Foresterie urbaine<br \/>\n\n<strong>Inspections :<br \/>\n<\/strong>Contr\u00f4le de l&#039;\u00e9rosion, Certificat de d\u00e9but des travaux, Rapport d&#039;inspection des pieux \u2013 Certificat, Planification finale, Travaux publics finaux, DERM final, B\u00e2timent final (derni\u00e8re inspection, toutes les autres doivent \u00eatre approuv\u00e9es avant)<br \/>\nplanification).<br \/>\n\n<p><em>Toutes les inspections \u00e9num\u00e9r\u00e9es ne sont peut-\u00eatre pas requises.<\/em><\/p>\n<h3>\n\t\t\tDocuments de construction requis pour la soumission\u00a0: plans sign\u00e9s et scell\u00e9s num\u00e9riquement ou \u00e9lectroniquement.\t<\/h3>\n\t\t\t\t<table>\n\t\t\t\t\t<thead>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<th rowspan=\"\" colspan=\"\">\n\t\t\t\t\t\t\t\t\t\t Documents de construction \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/th>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<th rowspan=\"\" colspan=\"\">\n\t\t\t\t\t\t\t\t\t\t Examen du d\u00e9partement \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/th>\n\t\t\t\t\t\t\t\t\t\t\t<\/tr><\/thead>\n\t\t\t\t\t<tbody>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t  Relev\u00e9 de site Relev\u00e9 topographique\/limites sign\u00e9 et scell\u00e9 \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t B\u00e2timent - M\u00e9tiers multiples, Incendie, Planification, Travaux publics \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr><tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Plans architecturaux \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t B\u00e2timent - M\u00e9tiers multiples, Incendie, Planification, Travaux publics \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr><tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Plans structurels \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t De construction \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr><tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Plans \u00e9lectriques (le cas \u00e9ch\u00e9ant) \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t \u00c9lectrique \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr><tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Plans de plomberie \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Plomberie \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr><tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Plans de protection contre l&#039;incendie (le cas \u00e9ch\u00e9ant) \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Feu \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr><tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Enqu\u00eate sur les arbres \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Groupe de foresterie urbaine \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t<\/tr><\/tbody>\n\t\t\t\t<\/table>\n\t<ul>\n<li>Le plan d&#039;am\u00e9nagement doit indiquer les marges de recul, les constructions existantes et projet\u00e9es, les limites de propri\u00e9t\u00e9, les dimensions du lot et l&#039;altitude du terrain conform\u00e9ment au relev\u00e9 topographique. Il doit \u00e9galement inclure toutes les constructions projet\u00e9es telles que cl\u00f4tures\/murs, d\u00e9pendances, piscine, terrasses, all\u00e9es, \u00e9quipements m\u00e9caniques, etc., selon les besoins du projet.<\/li>\n<li>Toutes les \u00e9l\u00e9vations doivent inclure les \u00e9l\u00e9ments suivants dans les valeurs NGVD\u00a0: BFE, pente, pente ajust\u00e9e, franc-bord (le cas \u00e9ch\u00e9ant).<\/li>\n<\/ul>\n<h3>\n\t\t\tDocuments justificatifs pouvant \u00eatre requis\u00a0:\t<\/h3>\n\t\t\t\t<table>\n\t\t\t\t\t<thead>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<th rowspan=\"\" colspan=\"\">\n\t\t\t\t\t\t\t\t\t\t Documents de construction \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/th>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<th rowspan=\"\" colspan=\"\">\n\t\t\t\t\t\t\t\t\t\t Examen du d\u00e9partement \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/th>\n\t\t\t\t\t\t\t\t\t\t\t<\/tr><\/thead>\n\t\t\t\t\t<tbody>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t  Calculs de structure  \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t De construction \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr><tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Formulaires d&#039;inspecteur sp\u00e9cial \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t De construction \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr><tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Disposition des arbres (le cas \u00e9ch\u00e9ant) \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Groupe de foresterie urbaine \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr><tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Plan de protection des arbres (le cas \u00e9ch\u00e9ant) \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Groupe de foresterie urbaine \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr><tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Permis d&#039;arbre approuv\u00e9 (le cas \u00e9ch\u00e9ant)  \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Groupe de foresterie urbaine, planification \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr><tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Commande enregistr\u00e9e DRB, HPB, BOA ou d\u00e9termination de l&#039;importance architecturale (le cas \u00e9ch\u00e9ant) num\u00e9ris\u00e9e dans les plans apr\u00e8s la page de couverture. \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Planification \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr><tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t D\u00e9claration sous serment relative au contr\u00f4le des s\u00e9diments et de l&#039;\u00e9rosion sur les chantiers de construction \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Environnement \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t<\/tr><\/tbody>\n\t\t\t\t<\/table>\n\t\t\t\t<table>\n\t\t\t\t\t<thead>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<th rowspan=\"1\" colspan=\"2\">\n\t\t\t\t\t\t\t\t\t\t Approbation suppl\u00e9mentaire requise de l&#039;agence \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/th>\n\t\t\t\t\t\t\t\t\t\t\t<\/thead>\n\t\t\t\t\t<tbody>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"2\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Approbation du comt\u00e9 de Miami-Dade et documents \u00e0 inclure\u00a0:<br \/>-Approbation pr\u00e9liminaire du DERM (Permis de classe I)<br \/>-Plans structurels localisant clairement les limites de propri\u00e9t\u00e9, le front de mer, le chapeau de mer et le quai avec leurs \u00e9l\u00e9vations respectives et l&#039;approbation pr\u00e9liminaire du DERM. \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr><tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<td colspan=\"2\" rowspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t D\u00e9partement de la protection de l&#039;environnement (DEP)<br \/>District de gestion de l&#039;eau du sud de la Floride (SFWMD) \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t<\/tr><\/tbody>\n\t\t\t\t<\/table>\n\t\t\t\t<img decoding=\"async\" src=\"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2021\/03\/Building-Dept-Logo-1x4.png\" alt=\"Building Dept Logo\" itemprop=\"image\" height=\"315\" width=\"1201\" title=\"Logo du service du b\u00e2timent 1x4\" onerror=\"this.style.display='none'\" loading=\"lazy\" \/>","protected":false},"excerpt":{"rendered":"<p>Building Menu Permit Application The Permitting Process &#8211; How to Apply Permitting Checklists Same Day Service Online Permitting Resource Center [&hellip;]<\/p>\n","protected":false},"author":222,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_searchwp_excluded":"","site-sidebar-layout":"no-sidebar","site-content-layout":"","ast-site-content-layout":"normal-width-container","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1057,1059,1],"tags":[1863],"class_list":["post-395720","post","type-post","status-publish","format-standard","hentry","category-building-permits-checklists","category-commercial-building-permits-checklists","category-uncategorized","tag-marine"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Permit Checklist for Building \u2013 Commercial Marine - City of Miami Beach<\/title>\n<meta name=\"description\" content=\"Required Construction Documents for Submittal: Digitally or electronically signed and sealed drawings.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.miamibeachfl.gov\/fr\/commercial-marine\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Permit Checklist for Building \u2013 Commercial Marine\" \/>\n<meta property=\"og:description\" content=\"Required Construction Documents for Submittal: Digitally or electronically signed and sealed drawings.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.miamibeachfl.gov\/fr\/commercial-marine\/\" \/>\n<meta property=\"og:site_name\" content=\"City of Miami Beach\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/cityofmiamibeach\" \/>\n<meta property=\"article:published_time\" content=\"2026-01-28T21:54:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-28T22:05:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2025\/10\/icon-permits.png\" \/>\n<meta name=\"author\" content=\"Olga Lyons\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Miamibeachnews\" \/>\n<meta name=\"twitter:site\" content=\"@Miamibeachnews\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/commercial-marine\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/commercial-marine\\\/\"},\"author\":{\"name\":\"Olga Lyons\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#\\\/schema\\\/person\\\/f914fc83374f9c126dbb11b1dabefa22\"},\"headline\":\"Permit Checklist for Building \u2013 Commercial Marine\",\"datePublished\":\"2026-01-28T21:54:32+00:00\",\"dateModified\":\"2026-01-28T22:05:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/commercial-marine\\\/\"},\"wordCount\":493,\"publisher\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/commercial-marine\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/icon-permits.png\",\"keywords\":[\"Marine\"],\"articleSection\":[\"Building Permit Checklists\",\"Commercial Building Permit Checklists\",\"Uncategorized\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/commercial-marine\\\/\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/commercial-marine\\\/\",\"name\":\"Permit Checklist for Building \u2013 Commercial Marine - City of Miami Beach\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/commercial-marine\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/commercial-marine\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/icon-permits.png\",\"datePublished\":\"2026-01-28T21:54:32+00:00\",\"dateModified\":\"2026-01-28T22:05:50+00:00\",\"description\":\"Required Construction Documents for Submittal: Digitally or electronically signed and sealed drawings.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/commercial-marine\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.miamibeachfl.gov\\\/commercial-marine\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/commercial-marine\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/icon-permits.png\",\"contentUrl\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/icon-permits.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/commercial-marine\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Permit Checklist for Building \u2013 Commercial Marine\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#website\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\",\"name\":\"City of Miami Beach\",\"description\":\"The official website of the City of Miami Beach. Stay informed, find important information on city services, news, alerts, events, trolley routes, government employment and more.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#organization\",\"name\":\"City of Miami Beach\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/miamibeach-logoblue.png\",\"contentUrl\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/miamibeach-logoblue.png\",\"width\":1962,\"height\":381,\"caption\":\"City of Miami Beach\"},\"image\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/cityofmiamibeach\",\"https:\\\/\\\/x.com\\\/Miamibeachnews\",\"https:\\\/\\\/www.instagram.com\\\/miamibeachnews\\\/\"],\"description\":\"The official website of the City of Miami Beach. Stay informed, find important information on city services, news, alerts, events, trolley routes, government employment and more.\",\"telephone\":\"305.604.CITY(2489)\",\"legalName\":\"City of Miami Beach\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#\\\/schema\\\/person\\\/f914fc83374f9c126dbb11b1dabefa22\",\"name\":\"Olga Lyons\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Liste de v\u00e9rification des permis de construction \u2013 B\u00e2timents maritimes commerciaux \u2013 Ville de Miami Beach","description":"Documents de construction requis pour la soumission : Dessins sign\u00e9s et scell\u00e9s num\u00e9riquement ou \u00e9lectroniquement.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.miamibeachfl.gov\/fr\/commercial-marine\/","og_locale":"fr_FR","og_type":"article","og_title":"Permit Checklist for Building \u2013 Commercial Marine","og_description":"Required Construction Documents for Submittal: Digitally or electronically signed and sealed drawings.","og_url":"https:\/\/www.miamibeachfl.gov\/fr\/commercial-marine\/","og_site_name":"City of Miami Beach","article_publisher":"https:\/\/www.facebook.com\/cityofmiamibeach","article_published_time":"2026-01-28T21:54:32+00:00","article_modified_time":"2026-01-28T22:05:50+00:00","og_image":[{"url":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2025\/10\/icon-permits.png","type":"","width":"","height":""}],"author":"Olga Lyons","twitter_card":"summary_large_image","twitter_creator":"@Miamibeachnews","twitter_site":"@Miamibeachnews","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.miamibeachfl.gov\/commercial-marine\/#article","isPartOf":{"@id":"https:\/\/www.miamibeachfl.gov\/commercial-marine\/"},"author":{"name":"Olga Lyons","@id":"https:\/\/www.miamibeachfl.gov\/#\/schema\/person\/f914fc83374f9c126dbb11b1dabefa22"},"headline":"Permit Checklist for Building \u2013 Commercial Marine","datePublished":"2026-01-28T21:54:32+00:00","dateModified":"2026-01-28T22:05:50+00:00","mainEntityOfPage":{"@id":"https:\/\/www.miamibeachfl.gov\/commercial-marine\/"},"wordCount":493,"publisher":{"@id":"https:\/\/www.miamibeachfl.gov\/#organization"},"image":{"@id":"https:\/\/www.miamibeachfl.gov\/commercial-marine\/#primaryimage"},"thumbnailUrl":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2025\/10\/icon-permits.png","keywords":["Marine"],"articleSection":["Building Permit Checklists","Commercial Building Permit Checklists","Uncategorized"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.miamibeachfl.gov\/commercial-marine\/","url":"https:\/\/www.miamibeachfl.gov\/commercial-marine\/","name":"Liste de v\u00e9rification des permis de construction \u2013 B\u00e2timents maritimes commerciaux \u2013 Ville de Miami Beach","isPartOf":{"@id":"https:\/\/www.miamibeachfl.gov\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.miamibeachfl.gov\/commercial-marine\/#primaryimage"},"image":{"@id":"https:\/\/www.miamibeachfl.gov\/commercial-marine\/#primaryimage"},"thumbnailUrl":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2025\/10\/icon-permits.png","datePublished":"2026-01-28T21:54:32+00:00","dateModified":"2026-01-28T22:05:50+00:00","description":"Documents de construction requis pour la soumission : Dessins sign\u00e9s et scell\u00e9s num\u00e9riquement ou \u00e9lectroniquement.","breadcrumb":{"@id":"https:\/\/www.miamibeachfl.gov\/commercial-marine\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.miamibeachfl.gov\/commercial-marine\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.miamibeachfl.gov\/commercial-marine\/#primaryimage","url":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2025\/10\/icon-permits.png","contentUrl":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2025\/10\/icon-permits.png"},{"@type":"BreadcrumbList","@id":"https:\/\/www.miamibeachfl.gov\/commercial-marine\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.miamibeachfl.gov\/"},{"@type":"ListItem","position":2,"name":"Permit Checklist for Building \u2013 Commercial Marine"}]},{"@type":"WebSite","@id":"https:\/\/www.miamibeachfl.gov\/#website","url":"https:\/\/www.miamibeachfl.gov\/","name":"Ville de Miami Beach","description":"Site officiel de la ville de Miami Beach. Restez inform\u00e9 et trouvez des informations importantes sur les services municipaux, les actualit\u00e9s, les alertes, les \u00e9v\u00e9nements, les itin\u00e9raires de tramway, les emplois gouvernementaux et bien plus encore.","publisher":{"@id":"https:\/\/www.miamibeachfl.gov\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.miamibeachfl.gov\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.miamibeachfl.gov\/#organization","name":"Ville de Miami Beach","url":"https:\/\/www.miamibeachfl.gov\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.miamibeachfl.gov\/#\/schema\/logo\/image\/","url":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2022\/06\/miamibeach-logoblue.png","contentUrl":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2022\/06\/miamibeach-logoblue.png","width":1962,"height":381,"caption":"City of Miami Beach"},"image":{"@id":"https:\/\/www.miamibeachfl.gov\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/cityofmiamibeach","https:\/\/x.com\/Miamibeachnews","https:\/\/www.instagram.com\/miamibeachnews\/"],"description":"Site officiel de la ville de Miami Beach. Restez inform\u00e9 et trouvez des informations importantes sur les services municipaux, les actualit\u00e9s, les alertes, les \u00e9v\u00e9nements, les itin\u00e9raires de tramway, les emplois gouvernementaux et bien plus encore.","telephone":"305.604.CITY(2489)","legalName":"City of Miami Beach"},{"@type":"Person","@id":"https:\/\/www.miamibeachfl.gov\/#\/schema\/person\/f914fc83374f9c126dbb11b1dabefa22","name":"Olga Lyons"}]}},"_links":{"self":[{"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/posts\/395720","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/users\/222"}],"replies":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/comments?post=395720"}],"version-history":[{"count":2,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/posts\/395720\/revisions"}],"predecessor-version":[{"id":395723,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/posts\/395720\/revisions\/395723"}],"wp:attachment":[{"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/media?parent=395720"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/categories?post=395720"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/fr\/wp-json\/wp\/v2\/tags?post=395720"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}