{"id":272433,"date":"2023-09-14T09:27:35","date_gmt":"2023-09-14T13:27:35","guid":{"rendered":"https:\/\/www.miamibeachfl.gov\/?page_id=272433"},"modified":"2025-05-24T14:32:18","modified_gmt":"2025-05-24T18:32:18","slug":"building-permits-not-required-work-list","status":"publish","type":"page","link":"https:\/\/www.miamibeachfl.gov\/ht\/city-hall\/building\/permits\/building-permits-not-required-work-list\/","title":{"rendered":"Lis Travay ki pa Bezwen P\u00e8mi Konstriksyon"},"content":{"rendered":"Meni Bilding\t\t\t\n\t\t\t\t\t<ul id=\"menu-building-department\"><li id=\"menu-item-270333\" aria-haspopup=\"true\"><a aria-expanded=\"false\" href=\"\/ht\/city-hall\/building\/permits\/\">Aplikasyon pou P\u00e8mi<\/a>\n<ul>\n\t<li id=\"menu-item-286727\"><a href=\"\/ht\/city-hall\/building\/permits\/\">Pwosesis P\u00e8mi an \u2013 Kijan pou aplike<\/a><\/li>\n\t<li id=\"menu-item-271067\"><a href=\"\/ht\/city-hall\/building\/permits\/permitchecklists\/\">Lis verifikasyon p\u00e8mi yo<\/a><\/li>\n\t<li id=\"menu-item-322770\"><a href=\"\/ht\/city-hall\/building\/permits\/same-day-services\/\">S\u00e8vis Menm Jou a<\/a><\/li>\n\t<li id=\"menu-item-270341\"><a href=\"\/ht\/city-hall\/building\/onlinepermits\/\">Sant Resous P\u00e8mi Sou Ent\u00e8n\u00e8t \u2013 Aplike Sou Ent\u00e8n\u00e8t<\/a><\/li>\n\t<li id=\"menu-item-270340\"><a href=\"\/ht\/city-hall\/building\/permits\/interactive-permit-guide\/\">Gid P\u00e8mi Ent\u00e8aktif<\/a><\/li>\n\t<li id=\"menu-item-340585\"><a href=\"\/ht\/city-hall\/building\/permits\/expired-permits-and-permit-renewals\/\">P\u00e8mi ki ekspire ak renouv\u00e8lman p\u00e8mi<\/a><\/li>\n<\/ul>\n<\/li>\n<li id=\"menu-item-312699\" aria-haspopup=\"true\"><a aria-expanded=\"false\" href=\"#\">Resous P\u00e8mi<\/a>\n<ul>\n\t<li id=\"menu-item-280603\"><a href=\"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2025\/03\/Fee-Schedule-10.01.2024_Update-3.3.2025.pdf\">Or\u00e8 Fr\u00e8<\/a><\/li>\n\t<li id=\"menu-item-272445\"><a href=\"\/ht\/city-hall\/building\/permits\/building-permits-not-required-work-list\/\">Lis Moun Ki Pa Bezwen P\u00e8mi<\/a><\/li>\n\t<li id=\"menu-item-285785\"><a href=\"\/ht\/city-hall\/building\/permits\/permit-refunds\/\">Ranbousman P\u00e8mi<\/a><\/li>\n\t<li id=\"menu-item-285786\"><a href=\"\/ht\/city-hall\/building\/permits\/building-permit-reprieve-program\/\">Pwogram Amnisti pou Vyolasyon K\u00f2d Konstriksyon<\/a><\/li>\n\t<li id=\"menu-item-270348\"><a href=\"\/ht\/city-hall\/building\/building-recert\/\">Re-s\u00e8tifikasyon Bilding<\/a><\/li>\n\t<li id=\"menu-item-298042\"><a href=\"\/ht\/city-hall\/building\/permits\/fema-50-rule\/\">R\u00e8g Fema 50%<\/a><\/li>\n\t<li id=\"menu-item-270344\"><a href=\"\/ht\/city-hall\/building\/permits\/mdc\/\">Konte Miami-Dade<\/a><\/li>\n\t<li id=\"menu-item-270345\"><a href=\"\/ht\/city-hall\/building\/permits\/phased-permits\/\">P\u00e8mi faz<\/a><\/li>\n\t<li id=\"menu-item-270342\"><a href=\"\/ht\/city-hall\/building\/permits\/green\/\">P\u00e8mi V\u00e8t<\/a><\/li>\n\t<li id=\"menu-item-270346\"><a href=\"\/ht\/city-hall\/building\/statistics\/\">Tablodb\u00f2 Estatistik<\/a><\/li>\n\t<li id=\"menu-item-286018\"><a href=\"\/ht\/permits-search-dashboard\/\">Rech\u00e8ch P\u00e8mi Achiv<\/a><\/li>\n<\/ul>\n<\/li>\n<li id=\"menu-item-270334\"><a href=\"\/ht\/city-hall\/building\/forms\/\">F\u00f2m yo<\/a><\/li>\n<li id=\"menu-item-270335\"><a href=\"\/ht\/city-hall\/building\/inspections\/\">Enspeksyon yo<\/a><\/li>\n<li id=\"menu-item-270336\"><a href=\"\/ht\/city-hall\/building\/violations\/\">Vyolasyon<\/a><\/li>\n<li id=\"menu-item-270339\"><a href=\"\/ht\/city-hall\/building\/contractors\/\">Kontrakt\u00e8 yo<\/a><\/li>\n<li id=\"menu-item-270338\" aria-haspopup=\"true\"><a aria-expanded=\"false\" href=\"\/ht\/city-hall\/building\/contact-us\/\">Kontakte nou<\/a>\n<ul>\n\t<li id=\"menu-item-270351\"><a href=\"\/ht\/city-hall\/building\/web-booking-terms\/\">Pran yon randevou sou ent\u00e8n\u00e8t<\/a><\/li>\n<\/ul>\n<\/li>\n<li id=\"menu-item-270337\" aria-haspopup=\"true\"><a aria-expanded=\"false\" href=\"#\">Plis Lyen<\/a>\n<ul>\n\t<li id=\"menu-item-270352\"><a href=\"\/ht\/city-hall\/building\/faq\/\">Kesyon yo poze souvan<\/a><\/li>\n\t<li id=\"menu-item-270350\"><a href=\"\/ht\/city-hall\/building\/events\/\">Ev\u00e8nman ak Anons<\/a><\/li>\n\t<li id=\"menu-item-270353\"><a href=\"\/ht\/city-hall\/building\/local-flood-hazard-info\/\">Jesyon pl\u00e8n inondasyon<\/a><\/li>\n\t<li id=\"menu-item-270347\"><a href=\"\/ht\/city-hall\/building\/hurricane-preparedness\/\">Preparasyon pou Sikl\u00f2n<\/a><\/li>\n\t<li id=\"menu-item-270349\"><a href=\"\/ht\/city-hall\/building\/records-management\/\">Jesyon Dosye<\/a><\/li>\n\t<li id=\"menu-item-270343\"><a href=\"\/ht\/city-hall\/building\/permits\/private-provider-info\/\">Enf\u00f2masyon sou Founis\u00e8 Prive<\/a><\/li>\n\t<li id=\"menu-item-280714\"><a href=\"\/ht\/city-hall\/building\/building-recert\/annual-maintenance-log\/\">Jounal Antretyen Any\u00e8l<\/a><\/li>\n\t<li id=\"menu-item-285447\"><a href=\"\/ht\/city-hall\/building\/sop\/\">SOP<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\t\nMeni Bilding \u00d7\t\t\t\t\t\t<ul id=\"menu-building-department-1\"><li id=\"menu-item-270333\" aria-haspopup=\"true\"><a aria-expanded=\"false\" href=\"\/ht\/city-hall\/building\/permits\/\">Aplikasyon pou P\u00e8mi<\/a>\n<ul>\n\t<li id=\"menu-item-286727\"><a href=\"\/ht\/city-hall\/building\/permits\/\">Pwosesis P\u00e8mi an \u2013 Kijan pou aplike<\/a><\/li>\n\t<li id=\"menu-item-271067\"><a href=\"\/ht\/city-hall\/building\/permits\/permitchecklists\/\">Lis verifikasyon p\u00e8mi yo<\/a><\/li>\n\t<li id=\"menu-item-322770\"><a href=\"\/ht\/city-hall\/building\/permits\/same-day-services\/\">S\u00e8vis Menm Jou a<\/a><\/li>\n\t<li id=\"menu-item-270341\"><a href=\"\/ht\/city-hall\/building\/onlinepermits\/\">Sant Resous P\u00e8mi Sou Ent\u00e8n\u00e8t \u2013 Aplike Sou Ent\u00e8n\u00e8t<\/a><\/li>\n\t<li id=\"menu-item-270340\"><a href=\"\/ht\/city-hall\/building\/permits\/interactive-permit-guide\/\">Gid P\u00e8mi Ent\u00e8aktif<\/a><\/li>\n\t<li id=\"menu-item-340585\"><a href=\"\/ht\/city-hall\/building\/permits\/expired-permits-and-permit-renewals\/\">P\u00e8mi ki ekspire ak renouv\u00e8lman p\u00e8mi<\/a><\/li>\n<\/ul>\n<\/li>\n<li id=\"menu-item-312699\" aria-haspopup=\"true\"><a aria-expanded=\"false\" href=\"#\">Resous P\u00e8mi<\/a>\n<ul>\n\t<li id=\"menu-item-280603\"><a href=\"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2025\/03\/Fee-Schedule-10.01.2024_Update-3.3.2025.pdf\">Or\u00e8 Fr\u00e8<\/a><\/li>\n\t<li id=\"menu-item-272445\"><a href=\"\/ht\/city-hall\/building\/permits\/building-permits-not-required-work-list\/\">Lis Moun Ki Pa Bezwen P\u00e8mi<\/a><\/li>\n\t<li id=\"menu-item-285785\"><a href=\"\/ht\/city-hall\/building\/permits\/permit-refunds\/\">Ranbousman P\u00e8mi<\/a><\/li>\n\t<li id=\"menu-item-285786\"><a href=\"\/ht\/city-hall\/building\/permits\/building-permit-reprieve-program\/\">Pwogram Amnisti pou Vyolasyon K\u00f2d Konstriksyon<\/a><\/li>\n\t<li id=\"menu-item-270348\"><a href=\"\/ht\/city-hall\/building\/building-recert\/\">Re-s\u00e8tifikasyon Bilding<\/a><\/li>\n\t<li id=\"menu-item-298042\"><a href=\"\/ht\/city-hall\/building\/permits\/fema-50-rule\/\">R\u00e8g Fema 50%<\/a><\/li>\n\t<li id=\"menu-item-270344\"><a href=\"\/ht\/city-hall\/building\/permits\/mdc\/\">Konte Miami-Dade<\/a><\/li>\n\t<li id=\"menu-item-270345\"><a href=\"\/ht\/city-hall\/building\/permits\/phased-permits\/\">P\u00e8mi faz<\/a><\/li>\n\t<li id=\"menu-item-270342\"><a href=\"\/ht\/city-hall\/building\/permits\/green\/\">P\u00e8mi V\u00e8t<\/a><\/li>\n\t<li id=\"menu-item-270346\"><a href=\"\/ht\/city-hall\/building\/statistics\/\">Tablodb\u00f2 Estatistik<\/a><\/li>\n\t<li id=\"menu-item-286018\"><a href=\"\/ht\/permits-search-dashboard\/\">Rech\u00e8ch P\u00e8mi Achiv<\/a><\/li>\n<\/ul>\n<\/li>\n<li id=\"menu-item-270334\"><a href=\"\/ht\/city-hall\/building\/forms\/\">F\u00f2m yo<\/a><\/li>\n<li id=\"menu-item-270335\"><a href=\"\/ht\/city-hall\/building\/inspections\/\">Enspeksyon yo<\/a><\/li>\n<li id=\"menu-item-270336\"><a href=\"\/ht\/city-hall\/building\/violations\/\">Vyolasyon<\/a><\/li>\n<li id=\"menu-item-270339\"><a href=\"\/ht\/city-hall\/building\/contractors\/\">Kontrakt\u00e8 yo<\/a><\/li>\n<li id=\"menu-item-270338\" aria-haspopup=\"true\"><a aria-expanded=\"false\" href=\"\/ht\/city-hall\/building\/contact-us\/\">Kontakte nou<\/a>\n<ul>\n\t<li id=\"menu-item-270351\"><a href=\"\/ht\/city-hall\/building\/web-booking-terms\/\">Pran yon randevou sou ent\u00e8n\u00e8t<\/a><\/li>\n<\/ul>\n<\/li>\n<li id=\"menu-item-270337\" aria-haspopup=\"true\"><a aria-expanded=\"false\" href=\"#\">Plis Lyen<\/a>\n<ul>\n\t<li id=\"menu-item-270352\"><a href=\"\/ht\/city-hall\/building\/faq\/\">Kesyon yo poze souvan<\/a><\/li>\n\t<li id=\"menu-item-270350\"><a href=\"\/ht\/city-hall\/building\/events\/\">Ev\u00e8nman ak Anons<\/a><\/li>\n\t<li id=\"menu-item-270353\"><a href=\"\/ht\/city-hall\/building\/local-flood-hazard-info\/\">Jesyon pl\u00e8n inondasyon<\/a><\/li>\n\t<li id=\"menu-item-270347\"><a href=\"\/ht\/city-hall\/building\/hurricane-preparedness\/\">Preparasyon pou Sikl\u00f2n<\/a><\/li>\n\t<li id=\"menu-item-270349\"><a href=\"\/ht\/city-hall\/building\/records-management\/\">Jesyon Dosye<\/a><\/li>\n\t<li id=\"menu-item-270343\"><a href=\"\/ht\/city-hall\/building\/permits\/private-provider-info\/\">Enf\u00f2masyon sou Founis\u00e8 Prive<\/a><\/li>\n\t<li id=\"menu-item-280714\"><a href=\"\/ht\/city-hall\/building\/building-recert\/annual-maintenance-log\/\">Jounal Antretyen Any\u00e8l<\/a><\/li>\n\t<li id=\"menu-item-285447\"><a href=\"\/ht\/city-hall\/building\/sop\/\">SOP<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\t\t\t\t\n\t\t\t<h1>\n\t\t\t Lis Moun Ki Pa Bezwen P\u00e8mi\t<\/h1>\n\t\t\t<a href=\"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2024\/09\/Work-exempt-from-permit-923.2024.pdf\" target=\"_blank\" rel=\"noopener\">\n\t\t\t\t\t\t\tTelechaje v\u00e8syon PDF Travay ki pa bezwen p\u00e8mi\n\t\t\t<\/a>\n\t<p>Atik ki nan lis anba a pa bezwen yon P\u00e8mi Konstriksyon nan Vil Miami Beach dapre FBC 105.2.2 Reparasyon Min\u00e8. Travay la dwe f\u00e8t an konf\u00f2mite av\u00e8k k\u00f2d ki aplikab yo.<\/p>\n<h2>\n\t\t\tTravay Kom\u00e8syal, Travay Plizy\u00e8 Fanmi Ki Egzan De P\u00e8mi\t<\/h2>\n\t\t\t\t\t\t<h5> Jeneral:<\/h5>\n\t\t\t<p>Se s\u00e8lman antrepren\u00e8 yo ki dwe itilize trel\u00e8 konstriksyon ak konten\u00e8 konstriksyon (Pa gen itilizasyon piblik, nenp\u00f2t koneksyon ak s\u00e8vis piblik yo ap bezwen p\u00e8mi)<\/p>\n\t\t\t\t\t\t<h5> Twati:<\/h5>\n\t\t\t<p>Travay reparasyon twati PA estriktir\u00e8l nan nati li, li pa afekte sekirite lavi, epi li pa depase 10% sifas twati oubyen li pa egal a 200 pye kare sifas reparasyon, k\u00e8lkeswa sa ki pi piti a. <strong>(Travay la dwe f\u00e8t epi s\u00e8tifye pa yon kontrakt\u00e8 ki gen lisans).<\/strong><\/p>\n\t\t\t\t\t\t<h5> Plonbri:<\/h5>\n\t\t\t<ul>\n<li>Ranplasman twal\u00e8t, bid\u00e8, urinal, lavabo, wobin\u00e8, broyeur fatra, machin alave ves\u00e8l, depi ranplasman sa yo pa enplike oswa mande pou rearanjman enstalasyon yo (2 enstalasyon maksim\u00f2m). Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<li>Netwayaj bouchaj oswa reparasyon flit nan tiyo, valv oswa ekipman ak retire ak reenstalasyon twal\u00e8t dlo, depi reparasyon sa yo pa enplike oswa mande ranplasman oswa rearanjman valv, tiyo oswa ekipman. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<li>Pou bouche flit nan drenaj, dlo, t\u00e8, tiyo dech\u00e8 oswa tiyo vantilasyon, sepandan, si nenp\u00f2t sifon kache, tiyo drenaj, dlo, t\u00e8, tiyo dech\u00e8 oswa tiyo vantilasyon vin defektye epi li vin neses\u00e8 pou retire li epi ranplase li ak nouvo matery\u00e8l, travay sa a dwe konsidere k\u00f2m nouvo travay epi yo dwe jwenn yon p\u00e8mi epi f\u00e8 enspeksyon jan k\u00f2d sa a prevwa. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<\/ul>\n\t\t\t\t\t\t<h5> Elektrik:<\/h5>\n\t\t\t<ul>\n<li>Ranplasman limy\u00e8 elektrik yo (pa gen modifikasyon fil elektrik oswa chaj, 2 apar\u00e8y maksim\u00f2m). Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<li>Ranplasman switch ak priz elektrik ki gen 20 amp ak 120 v\u00f2lt oubyen mwens (2 apar\u00e8y maksim\u00f2m). Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<li>Ranplasman ant\u00e8n satelit ki gen yon dyam\u00e8t mwens pase 39\u2033 ak fil elektrik ki deja egziste a (nouvo fil elektrik ap bezwen p\u00e8mi). Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<\/ul>\n\t\t\t\t\t\t<h5> Mekanik:<\/h5>\n\t\t\t<ul>\n<li>Chofaj p\u00f2tab, refwadisman, vantilasyon (apar\u00e8y branche),<\/li>\n<li>Ranplasman nenp\u00f2t py\u00e8s ki pa chanje apwobasyon li oswa ki pa f\u00e8 li pa an sekirite.<\/li>\n<li>Refwadis\u00e8 evaporatif p\u00f2tab.<\/li>\n<li>Enstalasyon, ranplasman, retire oswa mezire nenp\u00f2t apar\u00e8y kontw\u00f2l jesyon chaj. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<li>Sist\u00e8m refrijerasyon endepandan ki gen 10 liv (4.54 kg) oswa mwens febrifuj epi ki fonksyone ak mot\u00e8 ki gen 1 puisans cheval (0.75 kW) oswa mwens. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<li>Reparasyon kanal \u00e8kondisyone, reparasyon fanatik vantilasyon, reparasyon py\u00e8s inite chofaj ak refwadisman. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<\/ul>\n\t\t\t\t\t\t<h5>Gaz<\/h5>\n\t\t\t<ul>\n<li>Apar\u00e8y chofaj p\u00f2tab.<\/li>\n<li>Ranplasman nenp\u00f2t ti py\u00e8s ki pa chanje apwobasyon ekipman an oswa ki pa rann ekipman sa a pa an sekirite. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<\/ul>\n<h2>\n\t\t\tTravay pou yon s\u00e8l fanmi, yon duplex, yon triplex ki egzante de p\u00e8mi\t<\/h2>\n\t\t\t\t\t\t<h5> Jeneral:<\/h5>\n\t\t\t<ul>\n<li>Ekipman lakou rekreyasyon (balanse, glisad, ba pou f\u00e8 makak, panyen bask\u00e8tb\u00f2l, elatriye) pou itilizasyon rezidansy\u00e8l. Tout<br \/>Ekipman ak estrikti yo dwe respekte limit zonaj yo.<\/li>\n<li>Ref\u00e8 twal ki deja egziste a ak menm koul\u00e8 a san okenn modifikasyon.<\/li>\n<li>Ranplasman kabin\u00e8t kwizin yo (si ranplasman sa yo pa enplike oswa mande pou rearanjman<br \/>enstalasyon ak apar\u00e8y).<\/li>\n<li>Ranplasman planche.<\/li>\n<li>Rezidans unifamilyal s\u00e8lman. Egzan de reparasyon oswa ranplasman miray s\u00e8k ki mwens pase 16 pye kare.<\/li>\n<li>Trel\u00e8 konstriksyon ak konten\u00e8 konstriksyon ki dwe itilize s\u00e8lman pa kontrakt\u00e8 yo (Pa gen itilizasyon piblik, okenn<br \/>koneksyon ak s\u00e8vis piblik yo ap bezwen p\u00e8mi).<\/li>\n<\/ul>\n\t\t\t\t\t\t<h5> Twati:<\/h5>\n\t\t\t<ul>\n<li>Travay reparasyon twati PA estriktir\u00e8l, li pa afekte sekirite lavi, epi li pa depase 10% sifas twati a oubyen li pa depase 200 pye kare sifas reparasyon, k\u00e8lkeswa sa ki pi piti a. (Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans).<\/li>\n<li>Reparasyon fasya\/sofit 10% nan max LF (Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans).<\/li>\n<li>Reparasyon\/ranplasman gouty\u00e8 (Pa yon antrepren\u00e8 ki gen lisans).<\/li>\n<\/ul>\n\t\t\t\t\t\t<h5> Plonbri:<\/h5>\n\t\t\t<ul>\n<li>Amonize Drenaj Sit la ak Sist\u00e8m Dlo Lapli Vil la. Travay ki f\u00e8t pa yon antrepren\u00e8 ki gen lisans anba yon<br \/>P\u00e8mi DERM Klas II. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<li>Reparasyon sist\u00e8m irigasyon an. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<li>Netwayaj bouchaj oswa reparasyon flit nan tiyo, valv oswa ekipman. Travay la dwe f\u00e8t &amp;<br \/>s\u00e8tifye pa yon kontrakt\u00e8 ki gen lisans.<\/li>\n<li>Pou bouche flit nan drenaj, dlo, t\u00e8, tiyo dech\u00e8 oswa tiyo vantilasyon, sepandan, si nenp\u00f2t sifon kache, tiyo drenaj, dlo, t\u00e8, tiyo dech\u00e8 oswa tiyo vantilasyon vin defektye epi li vin neses\u00e8 pou retire li epi ranplase li ak nouvo matery\u00e8l, travay sa a dwe konsidere k\u00f2m nouvo travay epi yo dwe jwenn yon p\u00e8mi epi f\u00e8 enspeksyon jan k\u00f2d sa a prevwa. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<li>Ranplasman twal\u00e8t, bid\u00e8, urinwa, lavabo, wobin\u00e8, broyeur, machin alave ves\u00e8l, apar\u00e8y chofaj pisin elektrik, depi sa yo<br \/>Ranplasman yo pa enplike oswa mande pou rearanjman enstalasyon yo (2 enstalasyon maksim\u00f2m).<\/li>\n<\/ul>\n\t\t\t\t\t\t<h5> Elektrik:<\/h5>\n\t\t\t<ul>\n<li>P\u00e8mi pou ba v\u00f2ltaj. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<li>Ranplasman 2 maksim\u00f2m limy\u00e8 elektrik (san modifikasyon fil elektrik oswa chaj).<\/li>\n<li>Ranplasman switch ak priz elektrik jiska 20 amp\u00e8 ak 120 v\u00f2lt oswa mwens (2 apar\u00e8y maksim\u00f2m).<\/li>\n<li>Ranplasman ant\u00e8n satelit ki gen yon dyam\u00e8t mwens pase 39\u2033 ak fil elektrik ki deja egziste yo.<\/li>\n<\/ul>\n\t\t\t\t\t\t<h5> Mekanik:<\/h5>\n\t\t\t<ul>\n<li>Reparasyon kanal \u00e8kondisyone, fanatik vantilasyon, oswa py\u00e8s inite chofaj ak refwadisman.<\/li>\n<li>Ranplasman inite fen\u00e8t \u00e8kondisyone ki egziste deja, ki te gen otorizasyon anvan.<\/li>\n<li>Chofaj, refwadisman, oswa vantilasyon p\u00f2tab (apar\u00e8y ploge), ranplasman hotte kwizin san kanalizasyon.<\/li>\n<li>Chofaj p\u00f2tab, refwadisman, vantilasyon (apar\u00e8y branche),<\/li>\n<li>Tiyo vap\u00e8, dlo cho oswa dlo fr\u00e8t nan nenp\u00f2t ekipman chofaj oswa refwadisman ki reglemante pa k\u00f2d sa a. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon kontrakt\u00e8 ki gen lisans. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon kontrakt\u00e8 ki gen lisans.<\/li>\n<li>Ranplasman nenp\u00f2t py\u00e8s ki pa chanje apwobasyon li oswa ki pa f\u00e8 li pa an sekirite.<\/li>\n<li>Refwadis\u00e8 evaporatif p\u00f2tab.<\/li>\n<li>Enstalasyon, ranplasman, retire oswa mezire nenp\u00f2t apar\u00e8y kontw\u00f2l jesyon chaj. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<li>Sist\u00e8m refrijerasyon endepandan ki gen 10 liv (4.54 kg) oswa mwens febrifuj epi ki fonksyone ak mot\u00e8 ki gen 1 puisans cheval (0.75 kW) oswa mwens. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<li>Reparasyon kanal \u00e8kondisyone, reparasyon fanatik vantilasyon, reparasyon py\u00e8s inite chofaj ak refwadisman. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<\/ul>\n\t\t\t\t\t\t<h5>Gaz<\/h5>\n\t\t\t<ul>\n<li>Apar\u00e8y chofaj p\u00f2tab.<\/li>\n<li>Ranplasman nenp\u00f2t ti py\u00e8s ki pa chanje apwobasyon ekipman an oswa ki pa rann ekipman sa a pa an sekirite. Travay la dwe f\u00e8t epi s\u00e8tifye pa yon antrepren\u00e8 ki gen lisans.<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Building Menu Permit Application The Permitting Process &#8211; How to Apply Permitting Checklists Same Day Service Online Permitting Resource Center [&hellip;]<\/p>\n","protected":false},"author":222,"featured_media":0,"parent":268879,"menu_order":83,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_searchwp_excluded":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[],"tags":[1044,1022],"class_list":["post-272433","page","type-page","status-publish","hentry","tag-building-department","tag-building-permit"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Building Permits Not Required Work List - City of Miami Beach<\/title>\n<meta name=\"description\" content=\"The City of Miami Beach Building Department is dedicated to serving the public through ef\ufb01cient and effective supervision and regulation of construction activities in Miami Beach.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.miamibeachfl.gov\/ht\/city-hall\/building\/permits\/building-permits-not-required-work-list\/\" \/>\n<meta property=\"og:locale\" content=\"ht_HT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Building Permits Not Required Work List\" \/>\n<meta property=\"og:description\" content=\"The City of Miami Beach Building Department is dedicated to serving the public through ef\ufb01cient and effective supervision and regulation of construction activities in Miami Beach.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.miamibeachfl.gov\/ht\/city-hall\/building\/permits\/building-permits-not-required-work-list\/\" \/>\n<meta property=\"og:site_name\" content=\"City of Miami Beach\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/cityofmiamibeach\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-24T18:32:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2023\/08\/Masterpermitcircle.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"1200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@Miamibeachnews\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/building\\\/permits\\\/building-permits-not-required-work-list\\\/\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/building\\\/permits\\\/building-permits-not-required-work-list\\\/\",\"name\":\"Building Permits Not Required Work List - City of Miami Beach\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#website\"},\"datePublished\":\"2023-09-14T13:27:35+00:00\",\"dateModified\":\"2025-05-24T18:32:18+00:00\",\"description\":\"The City of Miami Beach Building Department is dedicated to serving the public through ef\ufb01cient and effective supervision and regulation of construction activities in Miami Beach.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/building\\\/permits\\\/building-permits-not-required-work-list\\\/#breadcrumb\"},\"inLanguage\":\"ht\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/building\\\/permits\\\/building-permits-not-required-work-list\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/building\\\/permits\\\/building-permits-not-required-work-list\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"City Hall\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Building\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/building\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Building Permits\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/building\\\/permits\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Building Permits Not Required Work List\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#website\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\",\"name\":\"City of Miami Beach\",\"description\":\"The official website of the City of Miami Beach. Stay informed, find important information on city services, news, alerts, events, trolley routes, government employment and more.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ht\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#organization\",\"name\":\"City of Miami Beach\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ht\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/miamibeach-logoblue.png\",\"contentUrl\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/miamibeach-logoblue.png\",\"width\":1962,\"height\":381,\"caption\":\"City of Miami Beach\"},\"image\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/cityofmiamibeach\",\"https:\\\/\\\/x.com\\\/Miamibeachnews\",\"https:\\\/\\\/www.instagram.com\\\/miamibeachnews\\\/\"],\"description\":\"The official website of the City of Miami Beach. Stay informed, find important information on city services, news, alerts, events, trolley routes, government employment and more.\",\"telephone\":\"305.604.CITY(2489)\",\"legalName\":\"City of Miami Beach\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Lis Travay P\u00e8mi Konstriksyon Pa Obligatwa - Vil Miami Beach","description":"Depatman Konstriksyon Vil Miami Beach la dedye pou s\u00e8vi piblik la atrav\u00e8 sip\u00e8vizyon ak r\u00e8gleman efikas sou aktivite konstriksyon nan Miami Beach.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.miamibeachfl.gov\/ht\/city-hall\/building\/permits\/building-permits-not-required-work-list\/","og_locale":"ht_HT","og_type":"article","og_title":"Building Permits Not Required Work List","og_description":"The City of Miami Beach Building Department is dedicated to serving the public through ef\ufb01cient and effective supervision and regulation of construction activities in Miami Beach.","og_url":"https:\/\/www.miamibeachfl.gov\/ht\/city-hall\/building\/permits\/building-permits-not-required-work-list\/","og_site_name":"City of Miami Beach","article_publisher":"https:\/\/www.facebook.com\/cityofmiamibeach","article_modified_time":"2025-05-24T18:32:18+00:00","og_image":[{"width":1200,"height":1200,"url":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2023\/08\/Masterpermitcircle.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@Miamibeachnews","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/building\/permits\/building-permits-not-required-work-list\/","url":"https:\/\/www.miamibeachfl.gov\/city-hall\/building\/permits\/building-permits-not-required-work-list\/","name":"Lis Travay P\u00e8mi Konstriksyon Pa Obligatwa - Vil Miami Beach","isPartOf":{"@id":"https:\/\/www.miamibeachfl.gov\/#website"},"datePublished":"2023-09-14T13:27:35+00:00","dateModified":"2025-05-24T18:32:18+00:00","description":"Depatman Konstriksyon Vil Miami Beach la dedye pou s\u00e8vi piblik la atrav\u00e8 sip\u00e8vizyon ak r\u00e8gleman efikas sou aktivite konstriksyon nan Miami Beach.","breadcrumb":{"@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/building\/permits\/building-permits-not-required-work-list\/#breadcrumb"},"inLanguage":"ht","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.miamibeachfl.gov\/city-hall\/building\/permits\/building-permits-not-required-work-list\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/building\/permits\/building-permits-not-required-work-list\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.miamibeachfl.gov\/"},{"@type":"ListItem","position":2,"name":"City Hall","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/"},{"@type":"ListItem","position":3,"name":"Building","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/building\/"},{"@type":"ListItem","position":4,"name":"Building Permits","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/building\/permits\/"},{"@type":"ListItem","position":5,"name":"Building Permits Not Required Work List"}]},{"@type":"WebSite","@id":"https:\/\/www.miamibeachfl.gov\/#website","url":"https:\/\/www.miamibeachfl.gov\/","name":"Vil Miami Beach","description":"Sitw\u00e8b ofisy\u00e8l Vil Miami Beach la. Rete enf\u00f2me, jwenn enf\u00f2masyon enp\u00f2tan sou s\u00e8vis vil la, nouv\u00e8l, al\u00e8t, ev\u00e8nman, wout tramway, travay gouv\u00e8nman an ak plis ank\u00f2.","publisher":{"@id":"https:\/\/www.miamibeachfl.gov\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.miamibeachfl.gov\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ht"},{"@type":"Organization","@id":"https:\/\/www.miamibeachfl.gov\/#organization","name":"Vil Miami Beach","url":"https:\/\/www.miamibeachfl.gov\/","logo":{"@type":"ImageObject","inLanguage":"ht","@id":"https:\/\/www.miamibeachfl.gov\/#\/schema\/logo\/image\/","url":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2022\/06\/miamibeach-logoblue.png","contentUrl":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2022\/06\/miamibeach-logoblue.png","width":1962,"height":381,"caption":"City of Miami Beach"},"image":{"@id":"https:\/\/www.miamibeachfl.gov\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/cityofmiamibeach","https:\/\/x.com\/Miamibeachnews","https:\/\/www.instagram.com\/miamibeachnews\/"],"description":"Sitw\u00e8b ofisy\u00e8l Vil Miami Beach la. Rete enf\u00f2me, jwenn enf\u00f2masyon enp\u00f2tan sou s\u00e8vis vil la, nouv\u00e8l, al\u00e8t, ev\u00e8nman, wout tramway, travay gouv\u00e8nman an ak plis ank\u00f2.","telephone":"305.604.CITY(2489)","legalName":"City of Miami Beach"}]}},"_links":{"self":[{"href":"https:\/\/www.miamibeachfl.gov\/ht\/wp-json\/wp\/v2\/pages\/272433","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.miamibeachfl.gov\/ht\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.miamibeachfl.gov\/ht\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/ht\/wp-json\/wp\/v2\/users\/222"}],"replies":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/ht\/wp-json\/wp\/v2\/comments?post=272433"}],"version-history":[{"count":0,"href":"https:\/\/www.miamibeachfl.gov\/ht\/wp-json\/wp\/v2\/pages\/272433\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/ht\/wp-json\/wp\/v2\/pages\/268879"}],"wp:attachment":[{"href":"https:\/\/www.miamibeachfl.gov\/ht\/wp-json\/wp\/v2\/media?parent=272433"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/ht\/wp-json\/wp\/v2\/categories?post=272433"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/ht\/wp-json\/wp\/v2\/tags?post=272433"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}