{"id":29023,"date":"2017-08-11T00:10:59","date_gmt":"2017-08-11T00:10:59","guid":{"rendered":"http:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/table-of-contents-details\/section-1-e-electronic-media-standards-and-requirements\/"},"modified":"2018-01-26T15:31:45","modified_gmt":"2018-01-26T20:31:45","slug":"section-1-e-electronic-media-standards-and-requirements","status":"publish","type":"page","link":"https:\/\/www.miamibeachfl.gov\/pt\/city-hall\/public-works\/engineering-division\/section-1-e-electronic-media-standards-and-requirements\/","title":{"rendered":"Se\u00e7\u00e3o 1 E Padr\u00f5es e Requisitos de M\u00eddia Eletr\u00f4nica"},"content":{"rendered":"<\/p>\n<div class=\"text-left\">\n<div class=\"text-left\">\n<div class=\"text-left\">\n<table>\n<caption>Padr\u00f5es e Requisitos de M\u00eddia Eletr\u00f4nica\u00a0<\/caption>\n<tbody>\n<tr>\n<td colspan=\"3\">\n<p><strong>SE\u00c7\u00c3O 1 CRIT\u00c9RIOS PADR\u00c3O DE PROJETO E PLANO DE PRODU\u00c7\u00c3O<\/p>\n<p>E. Padr\u00f5es e Requisitos de M\u00eddia Eletr\u00f4nica<\/strong>\u00a0<\/p>\n<p>\u00c9 inten\u00e7\u00e3o da Cidade que todos os arquivos de desenho eletr\u00f4nico, independentemente da empresa que os produza, sejam semelhantes em estilo e conte\u00fado. Para tanto, todos os consultores devem obedecer \u00e0s seguintes diretrizes.<\/p>\n<p>Os seguintes requisitos m\u00ednimos devem ser seguidos para todos os produtos CADD. Al\u00e9m do documento impresso obrigat\u00f3rio, os arquivos digitais devem ser fornecidos na vers\u00e3o mais recente do AUTOCAD, no formato .dwg. Todos os arquivos de desenho em um projeto devem ser salvos na mesma vers\u00e3o do AUTOCAD. Todos os arquivos CAD ser\u00e3o configurados inserindo o Bloco de T\u00edtulo no &quot;Espa\u00e7o do Papel&quot; e o desenho no &quot;Espa\u00e7o do Modelo&quot;. Todos os arquivos de desenho ser\u00e3o salvos no formato AUTOCAD.dwg.<\/p>\n<p>1. O desenho no arquivo AutoCAD deve ser feito em escala 1:1 no ESPA\u00c7O DO MODELO. A escala de plotagem, salvo indica\u00e7\u00e3o em contr\u00e1rio, deve ser:\u00a0\u00a0\u00a0<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Vista da planta 1\u2033=20\u2032<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Perfil horizontal 1\u2033=20\u2032<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Perfil Vertical 1\u2033=2\u2032<\/p>\n<p>2. As entidades devem ser definidas em camadas conforme o Guia de Propriedades de Camadas aprovado, mostrado na Tabela 1.<\/p>\n<p>3. Os n\u00fameros das esta\u00e7\u00f5es da linha base devem ter no m\u00ednimo 1\/8 de polegada de altura no espa\u00e7o do papel.<\/p>\n<p>4. Os nomes das ruas devem ter no m\u00ednimo 1\/4 de polegada de altura no espa\u00e7o do papel. Todos os outros textos devem estar de acordo com o Guia de Escala de Letras aprovado, mostrado na Tabela 6.<\/p>\n<p>5. Para manter a uniformidade nas notas, r\u00f3tulos, dimensionamento, etc., cada escala plotada ter\u00e1 3 estilos de texto diferentes (pequeno, m\u00e9dio e grande). Haver\u00e1 tamb\u00e9m um estilo de texto adicional para dimensionamento (dim). Todos os estilos de texto usar\u00e3o a fonte simplex, conforme indicado na Tabela 4 (Guia de Dimensionamento) e na Tabela 6 (Guia de Letras).<\/p>\n<p>6. O posicionamento da Linha de Base deve aumentar de oeste para leste e de sul para norte. As esta\u00e7\u00f5es iniciais no local do projeto devem ser identificadas e referenciadas \u00e0 interse\u00e7\u00e3o mais pr\u00f3xima.<\/p>\n<p>7. A topografia deve ser plotada em um \u00fanico arquivo completo usando o Sistema de Coordenadas da Fl\u00f3rida 1983\/90, Zona Leste para controle horizontal e Bay Datum para controle vertical.<\/p>\n<p>8. Os r\u00f3tulos dos itens topogr\u00e1ficos devem ficar fora do direito de passagem e devem ser orientados para leitura no lado direito da planta.<\/p>\n<p>9. Notas gerais, abrevia\u00e7\u00f5es, setas e outros s\u00edmbolos padr\u00e3o devem estar de acordo com o Guia de S\u00edmbolos aprovado mostrado na Tabela 3, Parte III Se\u00e7\u00e3o 14.<\/p>\n<p>10. Marcas de verifica\u00e7\u00e3o e valores de esta\u00e7\u00e3o devem ser colocados a cada 100 p\u00e9s (30 m) de esta\u00e7\u00f5es. As marcas de verifica\u00e7\u00e3o devem ter no m\u00ednimo 1\/8 de polegada de comprimento no espa\u00e7o do papel. Marcas de verifica\u00e7\u00e3o intermedi\u00e1rias devem ser colocadas a cada 20 p\u00e9s (6 m) entre as marcas de verifica\u00e7\u00e3o.<\/p>\n<p>11. Todas as entidades ser\u00e3o criadas de forma que possam ser editadas. N\u00e3o ser\u00e1 permitida a prote\u00e7\u00e3o de texto ou s\u00edmbolos.<\/p>\n<p>12. As linhas de direito de passagem, linhas de base, linhas de lote e outras entidades relacionadas \u00e0 geometria devem ser definidas em eleva\u00e7\u00f5es Z = 0,00<\/p>\n<p>13. A espessura e a tonalidade da linha devem ser conforme o Guia de Camadas e Espessuras de Linha aprovado, mostrado na Tabela 1.<\/p>\n<p>14. As vari\u00e1veis de dimens\u00e3o devem ser semelhantes \u00e0s do Guia de Dimens\u00f5es aprovado, mostrado na Tabela 4.<\/p>\n<p>15. Todos os desenhos finais devem ser produzidos para plotar um ANSI D equivalente em tamanho real (paisagem) \u2013 22 polegadas por 34 polegadas, conforme o Guia de Limites\/Estrutura aprovado na Tabela 5.<\/p>\n<p>16. Todos os desenhos devem mostrar no m\u00ednimo o seguinte: linhas de direito de passagem, linhas centrais, linhas de base, linhas de monumentos, se houver, servid\u00f5es, se houver, vinculadas a pontos de refer\u00eancia permanentes, linhas de lote, linhas de parcelas, monumentos, nomes de ruas, dimens\u00f5es de direito de passagem, informa\u00e7\u00f5es de subdivis\u00e3o de lote e endere\u00e7os de propriedade, servid\u00f5es de utilidade p\u00fablica, seta norte e escala gr\u00e1fica.<\/p>\n<p>17. Os desenhos de utilidades devem mostrar, no m\u00ednimo, o seguinte: Perfil separado para cada segmento e tipo de utilidade (\u00e1gua, esgoto, esgoto pluvial, etc.); planta mostrando tamanho, material e deslocamento da tubula\u00e7\u00e3o principal, deflex\u00f5es (se houver), esta\u00e7\u00e3o, servi\u00e7os, hidrante, lateral, bueiros e conex\u00f5es.<\/p>\n<p>18. Refer\u00eancias Externas (X-Refs): Todos os arquivos de desenho ser\u00e3o compostos por dois tipos de arquivo: arquivos de modelo ou arquivos de folha. Cada tipo de arquivo ter\u00e1 seu pr\u00f3prio diret\u00f3rio denominado &quot;\/MODELO\/&quot; ou &quot;\/FOLHA\/&quot;. Todas as entidades que representam melhorias existentes e\/ou naturais ser\u00e3o desenhadas no espa\u00e7o &quot;Modelo&quot;. Essas entidades ser\u00e3o sempre desenhadas em tamanho real, usando a unidade de medida &quot;p\u00e9&quot;. Todas as entidades ser\u00e3o desenhadas com a cor, o tipo de linha e a espessura apropriados, e definidas por camada, conforme indicado na Tabela 1. Observe que os consultores enviar\u00e3o um formul\u00e1rio de Certifica\u00e7\u00e3o de Ades\u00e3o \u00e0s Normas CAD com suas submiss\u00f5es de 60% e 90% de conclus\u00e3o e o conjunto final de documentos do contrato, conforme fornecido no final desta se\u00e7\u00e3o. Observe que o Gerente de Projeto selecionar\u00e1 aleatoriamente dois (2) desenhos, que o consultor dever\u00e1 fornecer em formato eletr\u00f4nico como parte da submiss\u00e3o para verifica\u00e7\u00e3o de conformidade com o Manual de Obras P\u00fablicas. Isso inclui o seguinte:<\/p>\n<p>\u2022 Os arquivos do modelo conter\u00e3o o desenho base ilustrando o plano geral do projeto, que ser\u00e1 usado para fornecer o gr\u00e1fico para planta, eleva\u00e7\u00f5es, se\u00e7\u00f5es, perfis, etc. nos arquivos de folhas.<\/p>\n<p>\u2022 Os arquivos de planilha mostrar\u00e3o gr\u00e1ficos de borda, texto e simbologia para eleva\u00e7\u00f5es de planta, se\u00e7\u00f5es, perfis, detalhes, etc.<\/p>\n<p>\u2022 Al\u00e9m disso, o consultor se abster\u00e1 de \u201caninhar\u201d arquivos de refer\u00eancia (ou seja, colocar um arquivo de refer\u00eancia dentro de um arquivo de refer\u00eancia).<\/p>\n<p>\u2022 O consultor garantir\u00e1 que todos os arquivos de refer\u00eancia estejam localizados corretamente no diret\u00f3rio \u201c\/MODEL\/\u201d.<\/p>\n<p>\u2022 O consultor utilizar\u00e1 apenas elementos padr\u00e3o do AutoCAD (ou seja, sem elementos de software de terceiros). Os elementos s\u00e3o vetores, texto, dimens\u00f5es, hachuras, arquivos de forma, blocos, etc.<\/p>\n<p>\u2022 Imagens raster podem ser usadas apenas para apresentar imagens fotogr\u00e1ficas digitais de logotipos preenchidos. Certifique-se de incluir as imagens raster no diret\u00f3rio \u201c\/MODEL\/\u201d.<\/p>\n<p>\u2022 Para simplificar a produ\u00e7\u00e3o de folhas inteiras e meias folhas, todos os elementos no arquivo de folhas ser\u00e3o criados para caber em folhas de tamanho D, de 34 polegadas de largura (x) e 22 polegadas de altura (y).<\/p>\n<p>\u2022 O consultor evitar\u00e1 o uso de blocos aninhados, certificando-se de que todos os blocos sejam transport\u00e1veis em seu arquivo host, sem perda de informa\u00e7\u00f5es.<\/p>\n<p>\u2022 Todos os padr\u00f5es usados no arquivo AutoCAD devem ser produzidos pelo software principal do AutoCAD e n\u00e3o espec\u00edficos de nenhum software de terceiros.<\/p>\n<p>Todas as informa\u00e7\u00f5es ser\u00e3o completas e precisas o suficiente para que o Departamento de Obras P\u00fablicas da Cidade de Miami Beach possa reproduzir a vers\u00e3o final do gr\u00e1fico impresso em seu sistema AutoCAD. No m\u00ednimo, isso inclui o seguinte:<\/p>\n<p>\u2022 Nome e modelo do plotter;<\/p>\n<p>\u2022 Linguagem de sa\u00edda gr\u00e1fica (HPGL, EPS, etc.);<\/p>\n<p>\u2022 Lista de arquivos de refer\u00eancia vis\u00edveis no gr\u00e1fico, incluindo bordas de folhas e blocos de t\u00edtulo;<\/p>\n<p>\u2022 Lista de blocos vis\u00edveis;<\/p>\n<p>\u2022 Lista de camadas vis\u00edveis;<\/p>\n<p>\u2022 Atribui\u00e7\u00f5es de caneta;<\/p>\n<p>\u2022 Outra configura\u00e7\u00e3o que controla a sa\u00edda (bloqueio);<\/p>\n<p>\u2022 Data do lote, data da \u00faltima modifica\u00e7\u00e3o no arquivo, data do arquivo;<\/p>\n<p>\u2022 e qualquer outra considera\u00e7\u00e3o necess\u00e1ria para produzir o enredo.<\/p>\n<p>Todos os materiais de desenho do contrato entregues \u00e0 cidade de Miami Beach estar\u00e3o em formato de CD-ROM digital, contendo os dois principais diret\u00f3rios: \u201c\/MODELO\/\u201d e \u201c\/FOLHA\/\u201d.<\/p>\n<p>19. A &quot;Caixa de Revis\u00e3o&quot; dever\u00e1 ser preenchida para cada fase do projeto, ou seja, Fase de Projeto, Fase de Licita\u00e7\u00e3o e Fase de Constru\u00e7\u00e3o. Para a Fase de Projeto, a &quot;Caixa de Revis\u00e3o&quot; dever\u00e1 ser preenchida para cada uma das submiss\u00f5es de Progresso do Projeto, ou seja, 60%, 90%, 100%, submiss\u00f5es de autoriza\u00e7\u00e3o, etc. Uma vez conclu\u00eddo o projeto, a &quot;Caixa de Revis\u00e3o&quot; dever\u00e1 ser limpa para acompanhar a fase de licita\u00e7\u00e3o do projeto, ou seja, Emitido para Licita\u00e7\u00e3o, Adendo n\u00ba 1, Adendo n\u00ba 2, etc. Ao t\u00e9rmino da fase de licita\u00e7\u00e3o, a &quot;Caixa de Revis\u00e3o&quot; dever\u00e1 ser limpa novamente para acompanhar a fase de constru\u00e7\u00e3o do projeto, ou seja, Desenho Conformado, Esclarecimento n\u00ba 1 do Documento Contratual, Solicita\u00e7\u00e3o de Proposta n\u00ba 1, Desenho de Registro, etc.<\/p>\n<p>20. Cada Desenho Base dever\u00e1 ter um Mapa-chave do Desenho no canto inferior direito da folha. O Mapa-chave do desenho ser\u00e1 &quot;conectado&quot; ao Mapa-chave do S\u00edtio do projeto. O Mapa-chave do Desenho identificar\u00e1 claramente os limites das melhorias propostas descritas no Desenho Base em rela\u00e7\u00e3o ao Mapa-chave do S\u00edtio geral.<\/p>\n<p>21. Quando necess\u00e1rio, ser\u00e3o elaborados planos e detalhes diversos. Esses desenhos ser\u00e3o elaborados em uma escala m\u00ednima de 2,5 cm = 6 metros, embora planos parciais possam ser elaborados em escalas maiores, se o consultor julgar necess\u00e1rio para ilustrar o n\u00edvel de detalhamento necess\u00e1rio. N\u00e3o ser\u00e3o permitidas refer\u00eancias a recursos externos sem a ilustra\u00e7\u00e3o dos detalhes reais nos documentos.<\/p>\n<p>22. Observe as seguintes conven\u00e7\u00f5es a serem usadas ao estabelecer nomes de desenhos:<\/p>\n<p>\u2022 G: Geral<\/p>\n<p>\u2022 CE: Condi\u00e7\u00f5es Existentes<\/p>\n<p>\u2022 DM: Demoli\u00e7\u00e3o<\/p>\n<p>\u2022 PG&amp;D: Pavimenta\u00e7\u00e3o, Nivelamento e Drenagem<\/p>\n<p>\u2022 HS: Paisagismo<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0 -Pavimentadoras<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0 -Concreto Especial \/ Acabamentos<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0 -Cal\u00e7adas<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0 -Pilares<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0 -Esgrima<\/p>\n<p>\u2022 WM: Adutora de \u00c1gua<\/p>\n<p>\u2022 SS: Esgoto Sanit\u00e1rio<\/p>\n<p>\u2022 SO: \u00c1guas pluviais<\/p>\n<p>\u2022 E: El\u00e9trica<\/p>\n<p>\u2022 LA: Paisagem (Streetscape)<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0 -Plantios<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0 - Coberturas de solo<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0 - Grama \/ Semente<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0 -Ralar<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0 - Mobili\u00e1rio e Acess\u00f3rios Urbanos<\/p>\n<p>\u2022 IR: Irriga\u00e7\u00e3o<\/p>\n<p>\u2022 PM: Marca\u00e7\u00e3o e Sinaliza\u00e7\u00e3o de Pavimentos<\/p>\n<p>\n23. Todos os documentos finais e documentos conforme constru\u00eddos devem estar de acordo com o Guia de nomenclatura de arquivos aprovado, mostrado na Tabela 2.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">\n<p>Departamento de Obras P\u00fablicas<\/p>\n<p>Tel: 305-673-7080, Fax: 305-673-7028\u00a0<\/p>\n<p>\u00a0\u00a0\u00a0<\/p>\n<p>CIDADE DE MIAMI BEACH, MANUAL DE OBRAS P\u00daBLICAS, RECONHECIMENTO DO CONSULTOR DE CONFORMIDADE COM OS PADR\u00d5ES CAD<\/p>\n<p>Nome do Projeto: ____________________________________________________<\/p>\n<p>Envio do est\u00e1gio de conclus\u00e3o: Circule um \u2013 60% 90% 100%<\/p>\n<p>Esta lista de verifica\u00e7\u00e3o tem como objetivo verificar a ades\u00e3o do Consultor aos Padr\u00f5es da Vers\u00e3o Mais Recente do AutoCAD da Cidade de Miami Beach.<\/p>\n<p>Cada Consultor A\/E fornecer\u00e1 uma lista completa com seu contrato de est\u00e1gio de conclus\u00e3o 60%, 90%, 100%<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>Por favor, indique o n\u00famero total de desenhos no conjunto de envio: ____________________________<\/p>\n<p>Todos os arquivos de desenho foram nomeados de acordo com os padr\u00f5es da cidade?\u00a0\u00a0\u00a0<\/p>\n<p>Todos os arquivos de desenho foram nomeados de acordo com os padr\u00f5es da cidade?\u00a0\u00a0\u00a0<\/p>\n<p>Todas as refer\u00eancias cruzadas foram nomeadas e dispostas em camadas de acordo com os padr\u00f5es da cidade?\u00a0\u00a0\u00a0<\/p>\n<p>A folha de rosto e o bloco de t\u00edtulo atendem aos padr\u00f5es da cidade?\u00a0\u00a0\u00a0<\/p>\n<p>\u00c9 fornecido um Mapa de Chaves?\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/p>\n<p>Os Desenhos de Disciplinas individuais s\u00e3o referenciados ao Mapa Chave?\u00a0\u00a0\u00a0<\/p>\n<p>Todos os propriet\u00e1rios de servi\u00e7os p\u00fablicos da \u00e1rea foram contatados e suas contribui\u00e7\u00f5es foram anotadas?\u00a0\u00a0<\/p>\n<p>O mapa base do levantamento topogr\u00e1fico foi referenciado em X em cada desenho?\u00a0\u00a0\u00a0<\/p>\n<p>Todos os itens relacionados ao design foram colocados no \u201cModelspace\u201d?\u00a0\u00a0\u00a0\u00a0<\/p>\n<p>Os crit\u00e9rios adequados de nomenclatura\/estrutura\u00e7\u00e3o de disciplinas foram respeitados?\u00a0\u00a0\u00a0<\/p>\n<p>Todos os padr\u00f5es de hachura e diretrizes de sombreamento foram seguidos?\u00a0\u00a0\u00a0\u00a0<\/p>\n<p>Todas as cores est\u00e3o de acordo com os padr\u00f5es de espessura especificados pela City Line?\u00a0\u00a0\u00a0<\/p>\n<p>As dimens\u00f5es e os l\u00edderes est\u00e3o associados a um item?\u00a0\u00a0\u00a0\u00a0<\/p>\n<p>As escalas gr\u00e1ficas s\u00e3o fornecidas em cada desenho no paperspace?\u00a0\u00a0\u00a0\u00a0<\/p>\n<p>As setas do norte s\u00e3o fornecidas em cada desenho, conforme aplic\u00e1vel, no espa\u00e7o do papel?\u00a0\u00a0<\/p>\n<p>O logotipo do consultor est\u00e1 inserido corretamente no paperspace?\u00a0\u00a0\u00a0\u00a0<\/p>\n<\/td>\n<td>\n<p>Sim N\u00e3o<\/p>\n<p>Sim N\u00e3o<\/p>\n<p>Sim N\u00e3o<\/p>\n<p>Sim N\u00e3o<\/p>\n<p>Sim N\u00e3o<\/p>\n<p>Sim N\u00e3o<\/p>\n<p>Sim N\u00e3o<\/p>\n<p>Sim N\u00e3o<\/p>\n<p>Sim N\u00e3o<\/p>\n<p>Sim N\u00e3o<\/p>\n<p>Sim N\u00e3o<\/p>\n<p>Sim N\u00e3o<\/p>\n<p>Sim N\u00e3o<\/p>\n<p>Sim N\u00e3o<\/p>\n<p>Sim N\u00e3o<\/p>\n<p>Sim N\u00e3o\n<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p><\/p>\n<p>\u00a0<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\">\n<p>Coment\u00e1rios:________________________________________________<\/p>\n<p>_________________________________________________________<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/p>\n<p>_________________________________________________________<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Assinatura<\/p>\n<p>_________________________________________________________<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Nome impresso e t\u00edtulo<\/p>\n<p>_________________________________________________________<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Empresa\n<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\">TABELA 1 \u2013 CAMADA E PROPRIEDADES<\/p>\n<p>TABELA 2 \u2013 GUIA DE NOMES DE ARQUIVOS<\/p>\n<p>TABELA 3 \u2013 NOTAS GERAIS, ABREVIATURAS E GUIA DE S\u00cdMBOLOS<\/p>\n<p>TABELA 4 \u2013 GUIA DE DIMENS\u00d5ES<\/p>\n<p>TABELA 5 \u2013 GUIA DE QUADRO\/LIMITES<\/p>\n<p>TABELA 6 \u2013 GUIA DE LETRAS<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"text-left\">\n<div class=\"text-left\">\u00a0<\/div>\n<\/div>\n<p>\u00a0<\/p>","protected":false},"excerpt":{"rendered":"<p>Electronic Media Standards and Requirements\u00a0 SECTION 1 STANDARD DESIGN AND PLAN PRODUCTION CRITERIA E.\u00a0Electronic Media Standards and Requirements\u00a0 It is [&hellip;]<\/p>\n","protected":false},"author":222,"featured_media":0,"parent":28940,"menu_order":176,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_searchwp_excluded":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[],"tags":[],"class_list":["post-29023","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Section 1  E  Electronic Media Standards And Requirements - City of Miami Beach<\/title>\n<meta name=\"description\" content=\"%\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.miamibeachfl.gov\/pt\/city-hall\/public-works\/engineering-division\/section-1-e-electronic-media-standards-and-requirements\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Section 1  E  Electronic Media Standards And Requirements\" \/>\n<meta property=\"og:description\" content=\"%\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.miamibeachfl.gov\/pt\/city-hall\/public-works\/engineering-division\/section-1-e-electronic-media-standards-and-requirements\/\" \/>\n<meta property=\"og:site_name\" content=\"City of Miami Beach\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/cityofmiamibeach\" \/>\n<meta property=\"article:modified_time\" content=\"2018-01-26T20:31:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2024\/01\/1000pxSquare-miamibeach-aerial-southpointview.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@Miamibeachnews\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-1-e-electronic-media-standards-and-requirements\\\/\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-1-e-electronic-media-standards-and-requirements\\\/\",\"name\":\"Section 1 E Electronic Media Standards And Requirements - City of Miami Beach\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#website\"},\"datePublished\":\"2017-08-11T00:10:59+00:00\",\"dateModified\":\"2018-01-26T20:31:45+00:00\",\"description\":\"%\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-1-e-electronic-media-standards-and-requirements\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-1-e-electronic-media-standards-and-requirements\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-1-e-electronic-media-standards-and-requirements\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"City Hall\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Public Works\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Engineering Division\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Section 1 E Electronic Media Standards And Requirements\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#website\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\",\"name\":\"City of Miami Beach\",\"description\":\"The official website of the City of Miami Beach. Stay informed, find important information on city services, news, alerts, events, trolley routes, government employment and more.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#organization\",\"name\":\"City of Miami Beach\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/miamibeach-logoblue.png\",\"contentUrl\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/miamibeach-logoblue.png\",\"width\":1962,\"height\":381,\"caption\":\"City of Miami Beach\"},\"image\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/cityofmiamibeach\",\"https:\\\/\\\/x.com\\\/Miamibeachnews\",\"https:\\\/\\\/www.instagram.com\\\/miamibeachnews\\\/\"],\"description\":\"The official website of the City of Miami Beach. Stay informed, find important information on city services, news, alerts, events, trolley routes, government employment and more.\",\"telephone\":\"305.604.CITY(2489)\",\"legalName\":\"City of Miami Beach\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Se\u00e7\u00e3o 1 E Padr\u00f5es e Requisitos de M\u00eddia Eletr\u00f4nica - Cidade de Miami Beach","description":"%","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.miamibeachfl.gov\/pt\/city-hall\/public-works\/engineering-division\/section-1-e-electronic-media-standards-and-requirements\/","og_locale":"pt_BR","og_type":"article","og_title":"Section 1  E  Electronic Media Standards And Requirements","og_description":"%","og_url":"https:\/\/www.miamibeachfl.gov\/pt\/city-hall\/public-works\/engineering-division\/section-1-e-electronic-media-standards-and-requirements\/","og_site_name":"City of Miami Beach","article_publisher":"https:\/\/www.facebook.com\/cityofmiamibeach","article_modified_time":"2018-01-26T20:31:45+00:00","og_image":[{"width":1000,"height":1000,"url":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2024\/01\/1000pxSquare-miamibeach-aerial-southpointview.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@Miamibeachnews","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-1-e-electronic-media-standards-and-requirements\/","url":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-1-e-electronic-media-standards-and-requirements\/","name":"Se\u00e7\u00e3o 1 E Padr\u00f5es e Requisitos de M\u00eddia Eletr\u00f4nica - Cidade de Miami Beach","isPartOf":{"@id":"https:\/\/www.miamibeachfl.gov\/#website"},"datePublished":"2017-08-11T00:10:59+00:00","dateModified":"2018-01-26T20:31:45+00:00","description":"%","breadcrumb":{"@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-1-e-electronic-media-standards-and-requirements\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-1-e-electronic-media-standards-and-requirements\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-1-e-electronic-media-standards-and-requirements\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.miamibeachfl.gov\/"},{"@type":"ListItem","position":2,"name":"City Hall","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/"},{"@type":"ListItem","position":3,"name":"Public Works","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/"},{"@type":"ListItem","position":4,"name":"Engineering Division","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/"},{"@type":"ListItem","position":5,"name":"Section 1 E Electronic Media Standards And Requirements"}]},{"@type":"WebSite","@id":"https:\/\/www.miamibeachfl.gov\/#website","url":"https:\/\/www.miamibeachfl.gov\/","name":"Cidade de Miami Beach","description":"Site oficial da cidade de Miami Beach. Mantenha-se informado e encontre informa\u00e7\u00f5es importantes sobre servi\u00e7os municipais, not\u00edcias, alertas, eventos, rotas de bonde, empregos p\u00fablicos e muito mais.","publisher":{"@id":"https:\/\/www.miamibeachfl.gov\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.miamibeachfl.gov\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/www.miamibeachfl.gov\/#organization","name":"Cidade de Miami Beach","url":"https:\/\/www.miamibeachfl.gov\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/www.miamibeachfl.gov\/#\/schema\/logo\/image\/","url":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2022\/06\/miamibeach-logoblue.png","contentUrl":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2022\/06\/miamibeach-logoblue.png","width":1962,"height":381,"caption":"City of Miami Beach"},"image":{"@id":"https:\/\/www.miamibeachfl.gov\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/cityofmiamibeach","https:\/\/x.com\/Miamibeachnews","https:\/\/www.instagram.com\/miamibeachnews\/"],"description":"Site oficial da cidade de Miami Beach. Mantenha-se informado e encontre informa\u00e7\u00f5es importantes sobre servi\u00e7os municipais, not\u00edcias, alertas, eventos, rotas de bonde, empregos p\u00fablicos e muito mais.","telephone":"305.604.CITY(2489)","legalName":"City of Miami Beach"}]}},"_links":{"self":[{"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/pages\/29023","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/users\/222"}],"replies":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/comments?post=29023"}],"version-history":[{"count":0,"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/pages\/29023\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/pages\/28940"}],"wp:attachment":[{"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/media?parent=29023"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/categories?post=29023"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/tags?post=29023"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}