{"id":29122,"date":"2017-08-11T00:12:05","date_gmt":"2017-08-11T00:12:05","guid":{"rendered":"http:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/table-of-contents-details\/section-7-2-installation\/"},"modified":"2018-01-26T15:36:29","modified_gmt":"2018-01-26T20:36:29","slug":"section-7-2-installation","status":"publish","type":"page","link":"https:\/\/www.miamibeachfl.gov\/pt\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/","title":{"rendered":"Se\u00e7\u00e3o 7 2. Instala\u00e7\u00e3o"},"content":{"rendered":"<\/p>\n<p><strong>SE\u00c7\u00c3O 7 SISTEMA DE COLETA DE ESGOTO SANIT\u00c1RIO POR GRAVIDADE<\/p>\n<p>2. INSTALA\u00c7\u00c3O<\/strong><\/p>\n<p>A. Devem ser utilizadas ferramentas e equipamentos adequados e adequados para o manuseio e assentamento seguro e conveniente da tubula\u00e7\u00e3o, em conformidade com as recomenda\u00e7\u00f5es do fabricante. No momento do assentamento, a tubula\u00e7\u00e3o dever\u00e1 ser examinada cuidadosamente quanto a defeitos e, caso seja constatado algum defeito ap\u00f3s o assentamento, dever\u00e1 ser removida e substitu\u00edda por uma tubula\u00e7\u00e3o em boas condi\u00e7\u00f5es, custeada pelo Contratante, \u00e0s suas expensas.<\/p>\n<p>B. A escava\u00e7\u00e3o e o aterro de valas e po\u00e7os de visita devem ser especificados na Se\u00e7\u00e3o de Escava\u00e7\u00e3o e Aterro de Obras para Utilidades e Estruturas do Manual de Obras P\u00fablicas do CMB.<\/p>\n<p>C. Onde a localiza\u00e7\u00e3o do esgoto n\u00e3o estiver claramente definida, instale-o de forma que n\u00e3o fique a menos de 1,8 m (6 p\u00e9s) horizontalmente, com a tubula\u00e7\u00e3o face a face (de prefer\u00eancia, 3 m) de uma tubula\u00e7\u00e3o principal ou linha de servi\u00e7o de abastecimento de \u00e1gua. Quando a base da tubula\u00e7\u00e3o de \u00e1gua estiver pelo menos 45 cm (6 p\u00e9s) acima do topo da tubula\u00e7\u00e3o de esgoto, o espa\u00e7amento horizontal pode ser de no m\u00ednimo 1,8 m (6 p\u00e9s) de separa\u00e7\u00e3o, face a face da tubula\u00e7\u00e3o (consulte a se\u00e7\u00e3o (IV)(A)(4) para o material de tubula\u00e7\u00e3o a ser utilizado).<\/p>\n<p>D. As larguras das valas em solos est\u00e1veis devem proporcionar uma folga m\u00e1xima de 30 cm em cada lado, entre a parte externa do cilindro do tubo e a face da escava\u00e7\u00e3o, ou revestimento, se utilizado, quando medido a um ponto de 30 cm acima do topo do tubo. As larguras m\u00ednimas das valas sob as mesmas condi\u00e7\u00f5es devem ser de no m\u00ednimo 15 cm em cada lado. As larguras m\u00ednimas das valas s\u00e3o necess\u00e1rias para fornecer espa\u00e7o para que um homem coloque e compacte as pernas e o material de aterro inicial. Em solos inst\u00e1veis (definidos como turfa, cobertura morta ou outros solos org\u00e2nicos, siltes el\u00e1sticos e argila ou areias finas abaixo do len\u00e7ol fre\u00e1tico), as larguras das valas devem ter no m\u00ednimo cinco (5) di\u00e2metros nominais de tubo de largura quando medidos a um ponto de 30 cm acima do topo do tubo para acomodar os equipamentos e requisitos de abertura de valas e compacta\u00e7\u00e3o.<\/p>\n<p>E. A cama e o aterro inicial 6 polegadas abaixo e 12 polegadas acima das redes e servi\u00e7os de esgoto devem ser de areia grossa, sem pedras maiores que \u00be de polegada de di\u00e2metro.<\/p>\n<p>\u00a0<\/p>\n<p>F. Molde o fundo da vala manualmente para fornecer suporte circunferencial substancialmente uniforme ao fundo de cada tubo. Quando aplic\u00e1vel, o assentamento dos tubos deve ser feito em declive, com as extremidades das torneiras apontando na dire\u00e7\u00e3o do fluxo.<\/p>\n<p>G. O tubo dever\u00e1 ser assentado na vala preparada, fiel \u00e0 linha e ao n\u00edvel do solo. O corpo do tubo dever\u00e1 receber suporte cont\u00ednuo e uniforme, sem press\u00e3o exercida sobre as juntas do tubo a partir do fundo da vala.<\/p>\n<p>H. Uma fita detectora de pl\u00e1stico \u201cverde\u201d com folha met\u00e1lica e com as palavras \u201cCUIDADO LINHA DE ESGOTO ENTERRADA ABAIXO\u201d impressas em intervalos de 30\u2033 ao longo da fita, deve ser colocada 18\u2033 acima de todos os canos principais e laterais de esgoto.<\/p>\n<p>I. Cada tubo deve ser instalado fielmente \u00e0 linha e ao n\u00edvel, conforme indicado nos desenhos, de modo a formar uma junta conc\u00eantrica pr\u00f3xima com o tubo adjacente e a evitar desvios repentinos da linha de fluxo. O tubo deve ser instalado de forma que as marca\u00e7\u00f5es de identifica\u00e7\u00e3o fiquem localizadas na parte superior das tubula\u00e7\u00f5es instaladas. A Contratada dever\u00e1 utilizar instrumentos de levantamento topogr\u00e1fico para manter o alinhamento e o n\u00edvel. Pelo menos uma tomada de eleva\u00e7\u00e3o dever\u00e1 ser feita em cada junta do tubo.<\/p>\n<p>J. O interior dos canos de esgoto deve ser mantido limpo e livre de toda sujeira e materiais sup\u00e9rfluos. Quando a limpeza ap\u00f3s o assentamento for dif\u00edcil devido ao pequeno tamanho do cano, um cotonete ou pano de algod\u00e3o adequado deve ser mantido no cano e puxado para frente, passando por cada junta, imediatamente ap\u00f3s a conclus\u00e3o da jun\u00e7\u00e3o. Durante a suspens\u00e3o do trabalho por qualquer motivo e a qualquer momento, um tamp\u00e3o adequado deve ser colocado na extremidade do \u00faltimo cano instalado para evitar que lama ou outros materiais estranhos entrem no cano. Nesse caso, deve ser fornecido suporte adequado para manter o cano no lugar contra o levantamento devido \u00e0 \u00e1gua na vala. Qualquer cano com defeito deve ser imediatamente removido e substitu\u00eddo por um cano em boas condi\u00e7\u00f5es.<\/p>\n<p>K. Os canos de esgoto devem ser instalados de acordo com a \u00faltima revis\u00e3o da norma ASTM D2321 e com a \u201cPr\u00e1tica Recomendada para Instala\u00e7\u00e3o de Canos de Esgoto de PVC\u201d da Uni-Bell Plastic Pipe Association.<\/p>\n<p>L. Os po\u00e7os de visita dever\u00e3o ser constru\u00eddos conforme indicado nos desenhos, de acordo com os Detalhes Padr\u00e3o da Cidade de Miami Beach. As aberturas dos tubos dos po\u00e7os de visita dever\u00e3o ser vedadas com argamassa elastom\u00e9rica ou similar aprovado. N\u00e3o ser\u00e1 permitido o uso de gesso para moldagem.<\/p>\n<p>M. Os canais de invers\u00e3o devem ser feitos de tijolos ou entulho de tijolos, cuidadosamente assentados e cobertos com argamassa de areia e cimento, moldados com precis\u00e3o em um fundo semicircular, adaptando-se \u00e0 parte interna da se\u00e7\u00e3o de esgoto adjacente. Declives acentuados fora dos canais de invers\u00e3o devem ser evitados. Altera\u00e7\u00f5es no tamanho e no declive devem ser feitas de forma gradual e uniforme. Altera\u00e7\u00f5es na dire\u00e7\u00e3o do esgoto ou do ramal de entrada devem ser uma curva suave com raio t\u00e3o longo quanto poss\u00edvel.<\/p>\n<p>N. Ap\u00f3s a instala\u00e7\u00e3o e inspe\u00e7\u00e3o das caixas de visita pela Prefeitura quanto a rachaduras e defeitos, duas (2) dem\u00e3os (espessura m\u00ednima de 8 mils cada, seco, de material protetor, Kopper&#039;s 300M ou equivalente) dever\u00e3o ser aplicadas na superf\u00edcie interna da caixa de visita no local da obra. Este material dever\u00e1 ser aplicado de acordo com as especifica\u00e7\u00f5es do fabricante e cobrir todos os espa\u00e7os vazios. As dem\u00e3os dever\u00e3o ter cores contrastantes para facilitar a verifica\u00e7\u00e3o.<\/p>\n<p>O. Conex\u00f5es de bueiro para rede de esgoto:<\/p>\n<p>1. Esgotos de PVC: A primeira junta nos esgotos de afluentes e efluentes em cada po\u00e7o de visita, incluindo ramais de servi\u00e7o, deve consistir em um acoplamento de po\u00e7o de visita aprovado, rejuntado na parede do po\u00e7o de visita e fornecendo uma veda\u00e7\u00e3o de junta elastom\u00e9rica cont\u00ednua e estanque entre o acoplamento e o tubo inserido nele. O acoplamento deve ter um interior c\u00f4nico crescente a partir da ranhura da junta para permitir flexibilidade ao tubo em caso de recalque futuro do po\u00e7o de visita ou da tubula\u00e7\u00e3o. O primeiro trecho de tubo de PVC para dentro ou para fora do po\u00e7o de visita deve ter dois (2) p\u00e9s de comprimento, no m\u00e1ximo, e deve ser de extremidade lisa por extremidade lisa, ou extremidade lisa por sino. Na primeira op\u00e7\u00e3o, a pr\u00f3xima junta deve ser um acoplamento de reparo de PVC de sino duplo (sem batente) com uma folga m\u00e1xima de uma (1) polegada entre os tubos inseridos nele. Na \u00faltima op\u00e7\u00e3o, a pr\u00f3xima junta deve ser outra se\u00e7\u00e3o de dois (2) p\u00e9s de comprimento, no m\u00e1ximo, de tubo de PVC de extremidade lisa por sino.<\/p>\n<p>2. Tubos de Ferro D\u00factil: O primeiro trecho de tubo que entra ou sai do po\u00e7o de visita deve ser um tubo de ferro d\u00factil de 60 cm de comprimento, com extremidades lisas (ou seja, 60 cm, medido a partir da parede externa), rejuntado diretamente na abertura da parede do po\u00e7o. Esta manga curta, de ponta a ponta lisa, deve ser unida \u00e0 extremidade da torneira de um tubo de ferro d\u00factil adjacente ou ao tubo de argila vitrificada com um adaptador Fernco.<\/p>\n<p>3. Tubos de Argila Vitrificada (VCP): devem ser removidos e substitu\u00eddos por tubos de PVC ou DI. Os novos tubos devem ser conectados ao VCP existente por meio de adaptadores Fernco apropriados.<\/p>\n<p>\u00a0\u00a0\u00a0<\/p>\n<p>4. Quando uma rampa de servi\u00e7o entrar em um po\u00e7o de visita a uma altitude de 60 cm (2 p\u00e9s) ou menos, dever\u00e1 ser prevista uma queda interna. Para quedas acima de 60 cm (2 p\u00e9s) acima da entrada principal de esgoto, dever\u00e1 ser prevista uma conex\u00e3o de queda externa, com uma extens\u00e3o de limpeza para dentro do po\u00e7o. N\u00e3o s\u00e3o permitidas caixas de visita de tijolos com quedas externas.<\/p>\n<p>P. Estruturas e Tampas: Estruturas e tampas de ferro fundido devem ser assentadas sobre uma camada de argamassa e cuidadosamente ajustadas \u00e0 eleva\u00e7\u00e3o mostrada nos desenhos. Devem ser instaladas no m\u00ednimo 3 e no m\u00e1ximo 5 fiadas de tijolos sob as estruturas para ajustar a eleva\u00e7\u00e3o das tampas de bueiro. O interior deve ser vedado conforme especificado acima para as caixas de visita.<\/p>","protected":false},"excerpt":{"rendered":"<p>SECTION 7 SANITARY SEWER GRAVITY COLLECTION SYSTEM 2. INSTALLATION A.\u00a0Proper and suitable tools and equipment for the safe and convenient [&hellip;]<\/p>\n","protected":false},"author":222,"featured_media":0,"parent":28940,"menu_order":183,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_searchwp_excluded":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[],"tags":[],"class_list":["post-29122","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Section 7  2. Installation - City of Miami Beach<\/title>\n<meta name=\"description\" content=\"%\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.miamibeachfl.gov\/pt\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Section 7  2. Installation\" \/>\n<meta property=\"og:description\" content=\"%\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.miamibeachfl.gov\/pt\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/\" \/>\n<meta property=\"og:site_name\" content=\"City of Miami Beach\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/cityofmiamibeach\" \/>\n<meta property=\"article:modified_time\" content=\"2018-01-26T20:36:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2024\/01\/1000pxSquare-miamibeach-aerial-southpointview.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@Miamibeachnews\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-7-2-installation\\\/\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-7-2-installation\\\/\",\"name\":\"Section 7 2. Installation - City of Miami Beach\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#website\"},\"datePublished\":\"2017-08-11T00:12:05+00:00\",\"dateModified\":\"2018-01-26T20:36:29+00:00\",\"description\":\"%\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-7-2-installation\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-7-2-installation\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/section-7-2-installation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"City Hall\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Public Works\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Engineering Division\",\"item\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/city-hall\\\/public-works\\\/engineering-division\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Section 7 2. Installation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#website\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\",\"name\":\"City of Miami Beach\",\"description\":\"The official website of the City of Miami Beach. Stay informed, find important information on city services, news, alerts, events, trolley routes, government employment and more.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#organization\",\"name\":\"City of Miami Beach\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/miamibeach-logoblue.png\",\"contentUrl\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/miamibeach-logoblue.png\",\"width\":1962,\"height\":381,\"caption\":\"City of Miami Beach\"},\"image\":{\"@id\":\"https:\\\/\\\/www.miamibeachfl.gov\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/cityofmiamibeach\",\"https:\\\/\\\/x.com\\\/Miamibeachnews\",\"https:\\\/\\\/www.instagram.com\\\/miamibeachnews\\\/\"],\"description\":\"The official website of the City of Miami Beach. Stay informed, find important information on city services, news, alerts, events, trolley routes, government employment and more.\",\"telephone\":\"305.604.CITY(2489)\",\"legalName\":\"City of Miami Beach\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Se\u00e7\u00e3o 7 2. Instala\u00e7\u00e3o - Cidade de Miami Beach","description":"%","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.miamibeachfl.gov\/pt\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/","og_locale":"pt_BR","og_type":"article","og_title":"Section 7  2. Installation","og_description":"%","og_url":"https:\/\/www.miamibeachfl.gov\/pt\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/","og_site_name":"City of Miami Beach","article_publisher":"https:\/\/www.facebook.com\/cityofmiamibeach","article_modified_time":"2018-01-26T20:36:29+00:00","og_image":[{"width":1000,"height":1000,"url":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2024\/01\/1000pxSquare-miamibeach-aerial-southpointview.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@Miamibeachnews","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/","url":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/","name":"Se\u00e7\u00e3o 7 2. Instala\u00e7\u00e3o - Cidade de Miami Beach","isPartOf":{"@id":"https:\/\/www.miamibeachfl.gov\/#website"},"datePublished":"2017-08-11T00:12:05+00:00","dateModified":"2018-01-26T20:36:29+00:00","description":"%","breadcrumb":{"@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/section-7-2-installation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.miamibeachfl.gov\/"},{"@type":"ListItem","position":2,"name":"City Hall","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/"},{"@type":"ListItem","position":3,"name":"Public Works","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/"},{"@type":"ListItem","position":4,"name":"Engineering Division","item":"https:\/\/www.miamibeachfl.gov\/city-hall\/public-works\/engineering-division\/"},{"@type":"ListItem","position":5,"name":"Section 7 2. Installation"}]},{"@type":"WebSite","@id":"https:\/\/www.miamibeachfl.gov\/#website","url":"https:\/\/www.miamibeachfl.gov\/","name":"Cidade de Miami Beach","description":"Site oficial da cidade de Miami Beach. Mantenha-se informado e encontre informa\u00e7\u00f5es importantes sobre servi\u00e7os municipais, not\u00edcias, alertas, eventos, rotas de bonde, empregos p\u00fablicos e muito mais.","publisher":{"@id":"https:\/\/www.miamibeachfl.gov\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.miamibeachfl.gov\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/www.miamibeachfl.gov\/#organization","name":"Cidade de Miami Beach","url":"https:\/\/www.miamibeachfl.gov\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/www.miamibeachfl.gov\/#\/schema\/logo\/image\/","url":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2022\/06\/miamibeach-logoblue.png","contentUrl":"https:\/\/www.miamibeachfl.gov\/wp-content\/uploads\/2022\/06\/miamibeach-logoblue.png","width":1962,"height":381,"caption":"City of Miami Beach"},"image":{"@id":"https:\/\/www.miamibeachfl.gov\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/cityofmiamibeach","https:\/\/x.com\/Miamibeachnews","https:\/\/www.instagram.com\/miamibeachnews\/"],"description":"Site oficial da cidade de Miami Beach. Mantenha-se informado e encontre informa\u00e7\u00f5es importantes sobre servi\u00e7os municipais, not\u00edcias, alertas, eventos, rotas de bonde, empregos p\u00fablicos e muito mais.","telephone":"305.604.CITY(2489)","legalName":"City of Miami Beach"}]}},"_links":{"self":[{"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/pages\/29122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/users\/222"}],"replies":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/comments?post=29122"}],"version-history":[{"count":0,"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/pages\/29122\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/pages\/28940"}],"wp:attachment":[{"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/media?parent=29122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/categories?post=29122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.miamibeachfl.gov\/pt\/wp-json\/wp\/v2\/tags?post=29122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}