Lis Verifikasyon Pèmi pou Èkondisyone – Modifikasyon Komèsyal

Permits

Pwojè yo ka bezwen apwobasyon Komisyon Planifikasyon anvan yo soumèt pèmi konstriksyon an.

Revizyon Plan yo: Building-Multiple Trades, Fire, Planning, Public Works

Enspeksyon: Mechanical Underground, Mechanical Rough,(Optional Roofing in progress and Final for new roof
curb/curb adapter or stand) Fire Final, Planning Final, Public Works Final and Mechanical Final.

Li posib ke se pa tout enspeksyon ki nan lis la ki obligatwa.

Dokiman Konstriksyon Obligatwa pou Soumèt: Desen ki siyen epi sele dijitalman oswa elektwonikman.

Dokiman Konstriksyon Revizyon Depatman an
Sondaj Sit ki Siyen & Sele Sondaj Topografik/Limit Building, Mechanical, Planning
Electrical Plans (if applicable) Elektrik
Plan Mekanik yo Mekanik
Fire Protection Plans (if applicable) Dife
Fire Alarm Plans (if applicable) Fire, Electrical
Proposed location plan (including roof areas as needed) show location and height of equipment. Building, Fire, Planning
  • Plan sit la dwe montre distans ki genyen ant estrikti ki deja egziste ak sa yo pwopoze yo, limit pwopriyete yo, dimansyon teren yo, ak elevasyon nivo a dapre sondaj la. Li dwe gen ladan tou tout estrikti pwopoze yo tankou kloti/mi, bilding akseswa, pisin, teras, chemen pyeton, ekipman mekanik, elatriye jan sa ka nesesè pou dimansyon pwojè a.
  • Revizyon dokiman konstriksyon yo ka mande plis depatman.

Dokiman Sipò Ki Ka Nesesè

Dokiman Konstriksyon Revizyon Depatman an
Smoke Control (if applicable) Fire, Mechanical
Kalkil estriktirèl Estriktirèl
Phasing Plan Pre-approved by Fire Marshal (if alteration is in an occupied building and proposed work compromises existing life safety systems Fire Marshal, Building
Detailed section showing the height of the unit measured from B.F.E. and grade when located within a required setback area Building, Planning
Stand Product Approval with specification on installations Building, Mechanical, Structural, Planning
Kalkil Chaj pou Dimansyon Chofaj/Refwadisman (ranplasman èkondisyone a pa yon chanjman egzak) Mekanik
Details and dimensions of equipment, including screening (if applicable) Building, Fire, Mechanical, Planning, Public Works, Structural
Line of Sight Study of equipment mounted on the roof. Planifikasyon
Construction Site Sediment and Erosion Control Affidavit (if applicable) Environmental, Public Works
Building Dept Logo
agenda chat
agenda chat
ht
Scroll to Top