Generator Placement

SEÇÃO 2 REQUISITOS DE CONSTRUÇÃO DE DIREITOS DE PASSAGEM

A. Permissões e procedimentos de direitos de passagem

10. Generator Placement

Permit requirements for Generator Placement:

 

 a) Quatro (4) conjuntos de plantas do local desenhados em escala (tamanho mínimo 11″x17″), para incluir dimensões de direito de passagem identificando os limites da propriedade.

 

 b) Generator placement requires location approval by Code Compliance Department/*Environmental Division prior to Right- of -Way Permit issuance.

 

 c) Requires Fire Department approval for location placement.

 

 d) Provide current copy of Certificate of Insurance Liability//Workmen’s Compensation coverage to be approved by the City’s Risk Management Division.

 

 e) $500.00 minimum sidewalk bond or security deposit

 f) Photographs of existing sidewalk/curb/gutter/asphalt pre-existing conditions.

 

 g) Proof (receipt) of parking meter space purchased from City of Miami Beach Parking Enforcement Division

 h) Provide generator specifications length, width, and height of trailer mounted unit with rubber tires (must provide photographs of trailer mounted generator).

 

 

pt_BRPT
Voltar ao topo