Permit Checklist for Building – Commercial New (w/ Phased)

Menu de construção

Avaliações do plano:
Building Official Approval, Environmental, Fire, Building Compliance, Planning

Inspeções:
Notice of Commencement – Certificate, Private Provider (Pile Log Report- Certificate, Foundation, Termite Treatment - Certificates, Slab, Under Construction - Elevation Certificate, Floodproofing Certificate - Under Construction, Columns, Beams, Framing, Columns, Drywall / Metal Lath, Trusses, Sheathing, Penetration Protection, Fire Stopping Affidavits), Preliminary Fire Safety, Final Elevation Certificate, Elevator Final, Fire Final, Final Floodproofing Certificate - Final, Planning Final, Public Works Final, Final Termite Treatment - Certificate, Final Elevation Certificate, Building Final (last inspection all others must be approved prior to scheduling).

Nem todas as inspeções listadas podem ser necessárias.

Documentos de construção necessários para submissão: Desenhos assinados e selados digitalmente ou eletronicamente.

Documentos de construção Revisão do Departamento
Levantamento de local, levantamento topográfico/de limites assinado e selado Building Compliance, Planning, Fire, Public Works
Civil Plans Obras públicas
Plantas arquitetônicas Building Compliance, Planning, Fire, Public Works
Planos Estruturais Building Compliance
Planos Elétricos Building Compliance
Elevator plans Obras públicas
Planos Mecânicos Building Compliance
Landscaping Plans Planejamento
Pool plans and/or Water Feature (as needed) Building Compliance, Planning, Fire, Public Works
Fire Protection Plans Fogo
Fire Alarm Plans Fire, Building Compliance
Life Safety Plans Building Compliance, Fire
Building Compliance Building Compliance, Fire
Levantamento de árvores Levantamento de árvores
  • A planta do terreno deve mostrar os recuos, as estruturas existentes e propostas, os limites da propriedade, as dimensões do lote e a elevação do terreno conforme o levantamento topográfico. Deve também incluir todas as estruturas propostas, como cercas/muros, edificações acessórias, piscina, decks, passarelas, equipamentos mecânicos, etc., conforme necessário para o escopo do projeto.
  • Todas as elevações devem incluir os seguintes valores NGVD: BFE, Inclinação, Inclinação Ajustada, Borda Livre (se aplicável).
  • A revisão dos documentos de construção pode exigir a participação de outros departamentos.

Supporting Documents That May be Required:

Documentos de construção Revisão do Departamento
Private provider required forms Building Official
Private Provide Plan Compliance Affidavits Building Official
Private provider review comments (approval of life safety drawings) Building Official, Fire
Declaration of Restrictive Covenant (if applicable) Planejamento
Hold Harmless Agreement (if applicable) Building Official, City Attorney
Smoke Control (if applicable) Fire, Building Compliance
Cálculos Estruturais Building Compliance
Relatório Geotécnico Building Compliance
Formulários de Inspetor Especial Building Compliance
Aprovação de produto com especificação de instalações Fire, Building Compliance, Planning for the location
Heating/Cooling Sizing Load Calculations Building Compliance
Formulário de Cálculo de Energia Building Compliance
Flood Emergency Operations Plan Building Compliance
Disposição das árvores (se aplicável) Grupo de Silvicultura Urbana
Plano de Proteção de Árvores (se aplicável) Grupo de Silvicultura Urbana
Approved Tree Permit (if applicable) Grupo de Silvicultura Urbana, Planejamento
Relatório de Cálculos de Drenagem Obras públicas
Relatório de Teste de Percolação Obras públicas
Obras Públicas – Planilha de Taxas de Serviços Públicos de Águas Pluviais Obras públicas
Fire Flow Test Fogo
Preliminary approval from Transportation Department Obras públicas
Seawall Permit in the review stage and submitted to DERM Building Compliance
Declaração de controle de sedimentos e erosão em canteiros de obras Ambiental
Electric Vehicles Parking Ordinance to be followed if parking lot/space/garage will be part of the project Planejamento
DRB, HPB, BO, PB recorded order or Determination of Architectural Significance (if applicable) scanned into plans after cover sheet. Planejamento
Completed City of Miami Beach Commercial Zoning Data Sheet scanned into plans. Zoning Data Sheet may not be altered or modified in any way Planejamento
All proposed mechanical equipment and/or allowable encroachments within required yards shall be indicated on setbacks and floor elevation. Please refer to Planning & Zoning Department for additional regulations. Planejamento

Required Additional Agency Approval:

Aprovação e documentos do Condado de Miami-Dade para incluir:

  • DERM Air Quality
  • Drainage Well Permit from DERM (if applicable)
  • DERM Sewer Capacity Certification Letter
  • Formulário de conformidade com a Portaria WASD 89-95 e comprovante de pagamento