Liste de vérification des permis de construction – Bâtiment commercial neuf (avec phases)

Menu du bâtiment
Permits

Les projets peuvent nécessiter l'approbation du conseil d'urbanisme avant la soumission du permis de construire

Examens du plan :
Building Official Approval, Environmental, Fire, Building Compliance, Planning

Inspections :
Notice of Commencement – Certificate, Private Provider (Pile Log Report- Certificate, Foundation, Termite Treatment - Certificates, Slab, Under Construction - Elevation Certificate, Floodproofing Certificate - Under Construction, Columns, Beams, Framing, Columns, Drywall / Metal Lath, Trusses, Sheathing, Penetration Protection, Fire Stopping Affidavits), Preliminary Fire Safety, Final Elevation Certificate, Elevator Final, Fire Final, Final Floodproofing Certificate - Final, Planning Final, Public Works Final, Final Termite Treatment - Certificate, Final Elevation Certificate, Building Final (last inspection all others must be approved prior to scheduling).

Toutes les inspections énumérées ne sont peut-être pas requises.

Required Construction Documents for Submittal: Digitally or Electronically Signed and Sealed Drawings.

Documents de construction Examen du département
Relevé de site Relevé topographique/limites signé et scellé Building Compliance, Planning, Fire, Public Works
Civil Plans Travaux publics
Plans architecturaux Building Compliance, Planning, Fire, Public Works
Plans structurels Building Compliance
Plans électriques Building Compliance
Elevator plans Travaux publics
Plans mécaniques Building Compliance
Landscaping Plans Planification
Pool plans and/or Water Feature (as needed) Building Compliance, Planning, Fire, Public Works
Fire Protection Plans Feu
Fire Alarm Plans Fire, Building Compliance
Life Safety Plans Building Compliance, Fire
Building Compliance Building Compliance, Fire
Enquête sur les arbres Enquête sur les arbres
  • Site Plan must show setbacks, both existing and proposed structures, property lines, lot dimensions, and grade elevation as per survey. It must also include all proposed structures such as fences/walls, accessory buildings, pool, decks, walkways, mechanical equipment, etc. as may be required for scope.
  • All elevations must include the following in NGVD values: BFE, Grade, Adjusted Grade, Freeboard (if applicable).
  • Review of construction documents may require additional departments

Supporting Documents That May be Required:

Documents de construction Examen du département
Private provider required forms Building Official
Private Provide Plan Compliance Affidavits Building Official
Private provider review comments (approval of life safety drawings) Building Official, Fire
Declaration of Restrictive Covenant (if applicable) Planification
Hold Harmless Agreement (if applicable) Building Official, City Attorney
Smoke Control (if applicable) Fire, Building Compliance
Calculs de structure Building Compliance
Rapport géotechnique Building Compliance
Formulaires d'inspecteur spécial Building Compliance
Approbation du produit avec spécifications sur les installations Fire, Building Compliance, Planning for the location
Heating/Cooling Sizing Load Calculations Building Compliance
Formulaire de calcul d'énergie Building Compliance
Flood Emergency Operations Plan Building Compliance
Disposition des arbres (le cas échéant) Groupe de foresterie urbaine
Plan de protection des arbres (le cas échéant) Groupe de foresterie urbaine
Approved Tree Permit (if applicable) Groupe de foresterie urbaine, planification
Rapport de calcul de drainage Travaux publics
Rapport de test de percolation Travaux publics
Travaux publics – Feuille de calcul des frais de service des eaux pluviales Travaux publics
Fire Flow Test Feu
Preliminary approval from Transportation Department Travaux publics
Seawall Permit in the review stage and submitted to DERM Building Compliance
Déclaration sous serment relative au contrôle des sédiments et de l'érosion sur les chantiers de construction Environnement
Electric Vehicles Parking Ordinance to be followed if parking lot/space/garage will be part of the project Planification
DRB, HPB, BO, PB recorded order or Determination of Architectural Significance (if applicable) scanned into plans after cover sheet. Planification
Completed City of Miami Beach Commercial Zoning Data Sheet scanned into plans. Zoning Data Sheet may not be altered or modified in any way Planification
All proposed mechanical equipment and/or allowable encroachments within required yards shall be indicated on setbacks and floor elevation. Please refer to Planning & Zoning Department for additional regulations. Planification

Required Additional Agency Approval:

Approbation du comté de Miami-Dade et documents à inclure :

  • DERM Air Quality
  • Drainage Well Permit from DERM (if applicable)
  • DERM Sewer Capacity Certification Letter
  • Formulaire de conformité à l'ordonnance WASD 89-95 et preuve de paiement