Permit Checklist for Building – Commercial New (w/ Phased)

Gebäudemenü
Permits

Projekte erfordern möglicherweise die Genehmigung des Planungsausschusses vor der Einreichung der Baugenehmigung

Planüberprüfungen:
Building Official Approval, Environmental, Fire, Building Compliance, Planning

Inspektionen:
Notice of Commencement – Certificate, Private Provider (Pile Log Report- Certificate, Foundation, Termite Treatment - Certificates, Slab, Under Construction - Elevation Certificate, Floodproofing Certificate - Under Construction, Columns, Beams, Framing, Columns, Drywall / Metal Lath, Trusses, Sheathing, Penetration Protection, Fire Stopping Affidavits), Preliminary Fire Safety, Final Elevation Certificate, Elevator Final, Fire Final, Final Floodproofing Certificate - Final, Planning Final, Public Works Final, Final Termite Treatment - Certificate, Final Elevation Certificate, Building Final (last inspection all others must be approved prior to scheduling).

Möglicherweise sind nicht alle aufgeführten Inspektionen erforderlich.

Required Construction Documents for Submittal: Digitally or Electronically Signed and Sealed Drawings.

Baudokumente Abteilungsüberprüfung
Standortuntersuchung Signierte und versiegelte topografische/Grenzvermessung Building Compliance, Planning, Fire, Public Works
Civil Plans Öffentliche Arbeiten
Architekturpläne Building Compliance, Planning, Fire, Public Works
Strukturpläne Building Compliance
Elektrische Pläne Building Compliance
Elevator plans Öffentliche Arbeiten
Mechanische Pläne Building Compliance
Landscaping Plans Planung
Pool plans and/or Water Feature (as needed) Building Compliance, Planning, Fire, Public Works
Fire Protection Plans Feuer
Fire Alarm Plans Fire, Building Compliance
Life Safety Plans Building Compliance, Fire
Building Compliance Building Compliance, Fire
Baumuntersuchung Baumuntersuchung
  • Site Plan must show setbacks, both existing and proposed structures, property lines, lot dimensions, and grade elevation as per survey. It must also include all proposed structures such as fences/walls, accessory buildings, pool, decks, walkways, mechanical equipment, etc. as may be required for scope.
  • All elevations must include the following in NGVD values: BFE, Grade, Adjusted Grade, Freeboard (if applicable).
  • Review of construction documents may require additional departments

Supporting Documents That May be Required:

Baudokumente Abteilungsüberprüfung
Private provider required forms Building Official
Private Provide Plan Compliance Affidavits Building Official
Private provider review comments (approval of life safety drawings) Building Official, Fire
Declaration of Restrictive Covenant (if applicable) Planung
Hold Harmless Agreement (if applicable) Building Official, City Attorney
Smoke Control (if applicable) Fire, Building Compliance
Strukturberechnungen Building Compliance
Geotechnischer Bericht Building Compliance
Spezielle Prüferformulare Building Compliance
Produktzulassung mit Installationsspezifikation Fire, Building Compliance, Planning for the location
Heating/Cooling Sizing Load Calculations Building Compliance
Energieberechnungsformular Building Compliance
Flood Emergency Operations Plan Building Compliance
Baumdisposition (falls zutreffend) Urban Forestry Group
Baumschutzplan (falls zutreffend) Urban Forestry Group
Approved Tree Permit (if applicable) Urban Forestry Group, Planung
Bericht zur Entwässerungsberechnung Öffentliche Arbeiten
Perkolationstestbericht Öffentliche Arbeiten
Öffentliche Arbeiten – Arbeitsblatt zur Regenwasserentsorgung Öffentliche Arbeiten
Fire Flow Test Feuer
Preliminary approval from Transportation Department Öffentliche Arbeiten
Seawall Permit in the review stage and submitted to DERM Building Compliance
Eidesstattliche Erklärung zur Sediment- und Erosionskontrolle auf Baustellen Umwelt
Electric Vehicles Parking Ordinance to be followed if parking lot/space/garage will be part of the project Planung
DRB, HPB, BO, PB recorded order or Determination of Architectural Significance (if applicable) scanned into plans after cover sheet. Planung
Completed City of Miami Beach Commercial Zoning Data Sheet scanned into plans. Zoning Data Sheet may not be altered or modified in any way Planung
All proposed mechanical equipment and/or allowable encroachments within required yards shall be indicated on setbacks and floor elevation. Please refer to Planning & Zoning Department for additional regulations. Planung

Required Additional Agency Approval:

Genehmigung und Dokumente des Miami-Dade County müssen enthalten sein:

  • DERM Air Quality
  • Drainage Well Permit from DERM (if applicable)
  • DERM Sewer Capacity Certification Letter
  • WASD-Verordnung 89-95 – Konformitätsformular und Zahlungsnachweis