Section 2 A 22. Underground Utilities

Underground Utilities

SECTION 2 RIGHTS-OF-WAY CONSTRUCTION REQUIREMENTS

A. Rights-of-Way Permits and Procedures

22. Underground Utilities

Requirements for a permit for Underground Utilities:

a) Provide four (4) sets of the Engineer of Record/Utility Agency signed/sealed Plans/Profile section drawn to scale, (11″X17″ minimum size) showing existing/propose utility elevations.

b) Proof of Contractor’s licensed with the State of Florida and Miami Dade County

c) Provide certified Maintenance of Traffic Plan (MOT).

d) Provide copy of notification letter to property owners in construction area (s).

e) Provide copy of DERM Dewatering Permit.

f) Photographs of existing sidewalk/curb/gutter/asphalt pre-existing conditions.