Section 2 A 8. Fire Hydrant

Fire Hydrant

SECTION 2 RIGHTS-OF-WAY CONSTRUCTION REQUIREMENTS

A. Rights-of-Way Permits and Procedures

8. Fire Hydrant

Permit requirements for Fire Hydrant Installation/Relocation:

a) 4 copies of the construction drawing to include right of way dimensions identifying property lines signed and sealed by the engineer of record.

b) The applicant must install City approved “American Darling” type fire hydrant assembly model number B84B-5, with 5-1/4″ threads.