_Permit Application Submittal Checklist

Permit Application (Required)

  • Detailed Description of work
  • Square Ft.
  • Job Value
  • Address
  • Folio/Parcel No
  • Owner info.
  • Architect/Engineer
  • Contractor

Proof Of Ownership

  • Recorded warranty deed
  • Articles of Incorporation (listing managing members/officers/directors)
  • Power of Attorney (original needs to be submitted)
  • Certificate of Good Standing for out of State Corporations (within 1 year)

Contractor Information (All Insurance Certificates must be addressed to the City of Miami Beach)

  • Liability insurance
  • Workman’s Compensation Insurance
  • Workman’s Comp Exemption (Form)
  • State License
  • Local Business Tax License
  • Certificate of Competency
  • Municipal Contractor Occupational License
  • Broward Local Business Tax

Drawings And Documents

  • Required Drawings and Documents – Please click here to refer to the Permit Type checklists,
  • Construction Cost Affidavit (If required)
  • CPMP - Construction Parking Management Plan (Jobs over $250,000)
  • Affidavit in lieu of the Construction Parking Management
  • Construction Site Sediment and Erosion Control Affidavit (Jobs proposing land disturbingactivities)
  • Condominium board approval letter on board letterhead, signed and notarized, required for work inside condominium units.
  • Notice to Owner form required for contractors with workers compensation exemption. Form available on the Forms page.
Filename: Permit-Application-Checklist-v10.27.2022.pdf
File Type: pdf