Emergency Force Main Replacement - Hawthorne Ave

Project Overview:

In October 2025, a wastewater force main in the vicinity of Biscayne Bay Elementary School experienced a break, prompting emergency repairs and extensive cleaning and disinfection efforts in the affected areas.

The force main was originally installed in 1981 and had been identified for replacement as part of the City’s long-term master planning efforts. However, due to the corrosive conditions associated with Miami Beach’s tidal environment, the pipeline deteriorated more rapidly than anticipated and now requires replacement on an emergency basis.

To minimize impacts to the neighborhood, roadway excavation, and the surrounding environment, the City is replacing the force main via horizontal directional drilling (HDD). This construction method allows the new pipeline to be installed beneath the ground with limited surface disruption. The new force main will extend along Hawthorne Avenue to the west end of 75 Street, connecting Pump Stations #23 and #24.

Amici Engineering Contractors was selected to perform the work, and construction activities began in late April.

Parking Restrictions

Temporary parking restrictions for this project are as follow:

75 Street and Dickens Ave: restricted until July 27, 2026

Hawthrone Ave, from 79 Street to Crespi Blvd: restricted until July 13, 2026

Hawthorne Ave, from 81 to 82 Street: restricted until August 27, 2026

Location

Questions?

Reach out for more information.

Project Staff

Department Director
John Norris

Assistant Director/City Engineer
Kara Boyles, PhD, PE

Project Manager
Mariano Valle

Point of Contact
Nicholas Levy
NicholasLevy@maimibeachfl.gov

Contractor
Amici Engineering Contractors

Project Status

Construction

Last updated:

May 2026