Commercial – Condominium (including condominiums/apartments) Online Flooring (Interior flooring only; No bathroom/balcony)

building department page header

Plan Reviews
N/A

Inspections*
Soundproofing/Underlayment/Coating, Building Final

*Not all inspections listed may be required.

PROJECTS MAY REQUIRE PLANNING BOARD APPROVAL PRIOR TO BUILDING PERMIT SUBMITTAL.

Required Construction Documents for Submittal: Digitally or electronically signed and sealed drawings.

Construction Documents Department Review
Unit Floor Plan N/A

* Site Plan must show setbacks, both existing and proposed structures, property lines, lot dimensions, and grade elevation as per survey. It must also include all proposed structures such as fences/walls, accessory buildings, pool, decks, walkways, mechanical equipment, etc. as may be required for scope.

** All elevations must include the following in NGVD values: BFE, Grade, Adjusted Grade, Freeboard (if applicable).

***Review of construction documents may require additional departments

Supporting Documents That May be Required

Construction Documents Department Review
Soundproofing Specification Sheet N/A
Flooring Affidavit N/A

*Flooring affidavit - Flooring Permit Affidavit (Form)

Sample Submission of Simple Flooring Permit Application

Proof Of Ownership

  • Recorded warranty deed
  • Articles of Incorporation (listing managing members/officers/directors)
  • Certificate of Good Standing for out of State Corporations (within 1 year)

Contractor Information (All Insurance Certificates must be addressed to the City of Miami Beach)

  • Liability insurance
  • Workman’s Compensation Insurance **
  • Workman’s Comp Exemption (Form)
  • State License OR Municipal Contractor Occupational License – Must be a GC or licensed for flooring.
  • Local Business Tax License from municipality in Florida · Certificate of Competency
  • **When the contractor is workers compensation exempt, they must notify the owner and provide signed owner

Sample Submittal

The text shown here MUST be written on the plans.

Property Address: ____________________________________

Unit #: _________________________

Scope of work:

  • Remove old flooring type XXX
  • Install New XXX type flooring over soundproof material type XXXXXX with a sound transmission class not less than 50
  • No flooring in bathrooms or balcony
  • No vertical change in floor level will not exceed ¼”
  • Maximum threshold height of ½ inch across the main entrance exit door
  • Floor work area: XXX sq. ft
  • Foyer
  • Living Room
  • Kitchen
  • No cabinet removal

*** Include: The flooring and soundproof underlayment specification

File Type: www
agenda chat
agenda chat
en_USEN
Scroll to Top