Section 2 A 2. Asphalt Driveway Connection

Sidewalk Curb & Gutter Construction/Repair

SECTION 2 RIGHTS-OF-WAY CONSTRUCTION REQUIREMENTS

A. Rights-of-Way Permits and Procedures

2. Asphalt Driveway Connection

Permit requirements for Asphalt Driveway connection:

a) Certified Property Survey less than 2 years old Four (4) sets of plans, profile/ section drawn to scale (11″x17″minimum size) – see minimum construction standards below.

b) Proof of Property Ownership for Owner/Builder construction permit (warranty deed, property

tax assessment document.)

c) Proof of Contractor’s license with the State of Florida and Miami-Dade County

d) $500 minimum bond per driveway approach required for Owner/Builder permit

e) Florida Department of Transportation permit required for state roads and right of ways (District 6th Permit Office, 1000 NW 111 Ave., Miami, FL 33172 Ph.305-470-5367)

State roadways: Alton Road, 5th Street Collins Avenue, 63rd Street, 71st Street/ Normandy Drive., and

Indian Creek Drive

f) Miami-Dade County permit required for County roads and right-of- ways (Miami-Dade County Public Works 111 NW 1st Street, Miami FL 33132 – Ph. 305-375-2142) Miami-Dade County roadways: 23rd Street, Dade Blvd, Pine Tree Drive, La Gorce Drive and Venetian Causeway

g) Maintenance of Traffic Plan (MOT). An off duty Miami Beach Police officer or F.D.O.T. Certified Flagman may be required. A determination will be made by Public Works Engineering.