Permit Checklist for A/C – Commercial Alteration

Plan Reviews: Building-Multiple Trades, Fire, Planning, Public Works

Inspections: Mechanical Underground, Mechanical Rough,(Optional Roofing in progress and Final for new roof
curb/curb adapter or stand) Fire Final, Planning Final, Public Works Final and Mechanical Final.

Not all inspections listed may be required.

Required Construction Documents for Submittal: Digitally or Electronically Signed and Sealed Drawings.

Construction Documents Department Review
Site Survey Signed & Sealed Topographic/Boundary Survey Building, Mechanical, Planning
Electrical Plans (if applicable) Electrical
Mechanical Plans Mechanical
Fire Protection Plans (if applicable) Fire
Fire Alarm Plans (if applicable) Fire, Electrical
Proposed location plan (including roof areas as needed) show location and height of equipment. Building, Fire, Planning
  • Site Plan must show setbacks, both existing and proposed structures, property lines, lot dimensions, and grade elevation as per survey. It must also include all proposed structures such as fences/walls, accessory buildings, pool, decks, walkways, mechanical equipment, etc. as may be required for scope.
  • Review of construction documents may require additional departments

Supporting Documents That May be Required

Construction Documents Department Review
Smoke Control (if applicable) Fire, Mechanical
Structural Calculations Structural
Phasing Plan Pre-approved by Fire Marshal (if alteration is in an occupied building and proposed work compromises existing life safety systems Fire Marshal, Building
Detailed section showing the height of the unit measured from B.F.E. and grade when located within a required setback area Building, Planning
Stand Product Approval with specification on installations Building, Mechanical, Structural, Planning
Heating/Cooling Sizing Load Calculations (AC replaced not an exact changeout) Mechanical
Details and dimensions of equipment, including screening (if applicable) Building, Fire, Mechanical, Planning, Public Works, Structural
Line of Sight Study of equipment mounted on the roof. Planning
Construction Site Sediment and Erosion Control Affidavit (if applicable) Environmental, Public Works