Permit Checklist for Building – Commercial Accessory Structure

Plan Reviews: Building-Multiple Trades, Environmental, Fire, Flood, Planning,
Public Works, Urban Forestry

Inspections: Notice Of Commencement – Certificate, Foundation, Columns, Beams, Framing, Rough (InProgress), Planning Final, Public Works Final, Fire Final,Building Final. (last inspection all others must be approved prior to scheduling).

Not all inspections listed may be required.

Required Construction Documents for Submittal: Digitally or Electronically Signed and Sealed Drawings.

Construction Documents Department Review
Site Survey Signed & Sealed Topographic/Boundary Survey Building-Multiple Trades, Fire, Planning, Public Works
Structural Plans Structural
Fire Protection Plans (if applicable) Fire
  • Site Plan must show setbacks, both existing and proposed structures, property lines, lot dimensions, and grade elevation as per survey. It must also include all proposed structures such as fences/walls, accessory buildings, pool, decks, walkways, mechanical equipment, etc. as may be required for scope.
  • All elevations must include the following in NGVD values: BFE, Grade, Adjusted Grade, Freeboard (if applicable).
  • Clearance height from Ground Finish Floor (Height Minimum = 7’-0”)

Supporting Documents That May be Required

Building Dept Logo
agenda chat
agenda chat
en_US
Scroll to Top