Permit Checklist for Building – Commercial Curb Adaptor for Roof Top Unit

Plan Reviews:
Building-Multiple Trades, Planning

Inspections:
Mechanical Final, Planning Final, Building Final (last inspection all others must be approved prior to scheduling).

Not all inspections listed may be required.

Required Construction Documents for Submittal: Digitally or Electronically Signed and Sealed Drawings.

Construction Documents Department Review
Site Survey Signed & Sealed Topographic/Boundary Survey Building-Multiple Trades, Planning
Architectural Plans Building-Multiple Trades, Planning
Structural Plans Structural
Mechanical Plans Mechanical
  • Site Plan must show setbacks, both existing and proposed structures, property lines, lot dimensions, and grade elevation as per survey. It must also include all proposed structures such as fences/walls, accessory buildings, pool, decks, walkways, mechanical equipment, etc. as may be required for scope.
  • All elevations must include the following in NGVD values: BFE, Grade, Adjusted Grade, Freeboard (if applicable).
  • Review of construction documents may require additional departments

Supporting Documents That May be Required:

Construction Documents Department Review
Structural Calculations Structural
Special Inspector Forms (Threshold inspector required for buildings 4 stories or more) Structural
Building Dept Logo
agenda chat
agenda chat
en_US
Scroll to Top