Permit Checklist for Building – Commercial Demolition Total Demolition Only

Plan Reviews:
Building-Multiple Trades, Environmental, Fire, Planning,
Public Works, Urban Forestry Group

Inspections:
Notice Of Commencement – Certificate, Pile Log Report- Certificate, Foundation, Termite Treatment - Certificates, Slab, Under Construction - Elevation Certificate, Floodproofing Certificate - Under Construction, Columns, Beams, Framing, Columns, Drywall/Metal Lath, Trusses, Sheathing, Penetration Protection, Fire Stopping Affidavits, Preliminary Fire Safety, Final Elevation Certificate, Elevator Final, Fire Final, Final Floodproofing Certificate - Final, Planning Final, Public Works Final, Final Termite Treatment - Certificate, Final Elevation Certificate, Building Final (last inspection all others must be approved prior to scheduling).

Not all inspections listed may be required.

Required Construction Documents for Submittal: Digitally or Electronically Signed and Sealed Drawings.

Construction Documents Department Review
Site Survey Signed & Sealed Topographic/Boundary Survey Building-Multiple Trades, Fire, Planning, Public Works
Architectural Plans Building-Multiple Trades, Fire, Planning, Public Works
Life Safety Plans Building, Fire
Tree survey Urban Forestry Group
  • Site Plan must show setbacks, both existing and proposed structures, property lines, lot dimensions, and grade elevation as per survey. It must also include all proposed structures such as fences/walls, accessory buildings, pool, decks, walkways, mechanical equipment, etc. as may be required for scope.
  • All elevations must include the following in NGVD values: BFE, Grade, Adjusted Grade, Freeboard (if applicable).
  • Review of construction documents may require additional departments

Supporting Documents That May be Required:

Construction Documents Department Review
DRB, HPB, BOA recorded order or Determination of Architectural Significance (if applicable) Planning
Utility disconnect letters to include FPL, Gas, Water & Sewer Electrical, Plumbing, Public Works
Dust control procedure (letter from contractor) Environmental
Tree Disposition (if applicable) Urban Forestry Group
Tree Protection Plan (if applicable) Urban Forestry Group
Approved Tree Permit (if applicable) Urban Forestry Group, Planning
Public Works – Right of Way Permit Public Works
Construction Site Sediment and Erosion Control Affidavit Environmental

Required Additional Agency Approval:

Miami-Dade County Approval and Documents to include: DERM Air Quality