Permit Checklist for Building – Commercial Fence/Vehicular Gates

Plan Reviews:
Building-Multiple Trades, Environmental, Fire, Planning, Public Works, Urban Forestry Group

Inspections:
Notice Of Commencement - Certificate, Pile Log Report – Certificate, Foundation, Framing, Planning Final, Fire Final, Public Works Final, Building Final (last inspection all others must be approved prior to scheduling).

Not all inspections listed may be required.

Required Construction Documents for Submittal: Digitally or Electronically Signed and Sealed Drawings.

Construction Documents Department Review
Site Survey Signed & Sealed Topographic/Boundary Survey Building-Multiple Trades, Fire, Planning, Public Works
Architectural Plans Building-Multiple Trades, Fire, Planning, Public Works
Structural Plans Structural
Electrical Plans Electrical
  • Site Plan must show setbacks, both existing and proposed structures, property lines, lot dimensions, and grade elevation as per survey. It must also include all proposed structures such as fences/walls, accessory buildings, pool, decks, walkways, mechanical equipment, etc. as may be required for scope.
  • All elevations must include the following in NGVD values: BFE, Grade, Adjusted Grade, Freeboard (if applicable).
  • Review of construction documents may require additional departments

Supporting Documents That May be Required:

Construction Documents Department Review
Structural Calculations Structural
Entrapment Sensors if Automatic Vehicular Gates are included. Building
Product Approval with specification on installation Building
Public Works Department – Right of Way Permit (If applicable) Public Works
Building Dept Logo
agenda chat
agenda chat
en_US
Scroll to Top