Permit Checklist for Building – Commercial New (w/ Phased)

Plan Reviews:
Building Official Approval, Environmental, Fire, Building Compliance, Planning

Inspections:
Notice of Commencement – Certificate, Private Provider (Pile Log Report- Certificate, Foundation, Termite Treatment - Certificates, Slab, Under Construction - Elevation Certificate, Floodproofing Certificate - Under Construction, Columns, Beams, Framing, Columns, Drywall / Metal Lath, Trusses, Sheathing, Penetration Protection, Fire Stopping Affidavits), Preliminary Fire Safety, Final Elevation Certificate, Elevator Final, Fire Final, Final Floodproofing Certificate - Final, Planning Final, Public Works Final, Final Termite Treatment - Certificate, Final Elevation Certificate, Building Final (last inspection all others must be approved prior to scheduling).

Not all inspections listed may be required.

Required Construction Documents for Submittal: Digitally or Electronically Signed and Sealed Drawings.

Construction Documents Department Review
Site Survey Signed & Sealed Topographic/Boundary Survey Building Compliance, Planning, Fire, Public Works
Civil Plans Public Works
Architectural Plans Building Compliance, Planning, Fire, Public Works
Structural Plans Building Compliance
Electrical Plans Building Compliance
Elevator plans Public Works
Mechanical Plans Building Compliance
Landscaping Plans Planning
Pool plans and/or Water Feature (as needed) Building Compliance, Planning, Fire, Public Works
Fire Protection Plans Fire
Fire Alarm Plans Fire, Building Compliance
Life Safety Plans Building Compliance, Fire
Building Compliance Building Compliance, Fire
Tree survey Tree survey
  • Site Plan must show setbacks, both existing and proposed structures, property lines, lot dimensions, and grade elevation as per survey. It must also include all proposed structures such as fences/walls, accessory buildings, pool, decks, walkways, mechanical equipment, etc. as may be required for scope.
  • All elevations must include the following in NGVD values: BFE, Grade, Adjusted Grade, Freeboard (if applicable).
  • Review of construction documents may require additional departments

Supporting Documents That May be Required:

Construction Documents Department Review
Private provider required forms Building Official
Private Provide Plan Compliance Affidavits Building Official
Private provider review comments (approval of life safety drawings) Building Official, Fire
Declaration of Restrictive Covenant (if applicable) Planning
Hold Harmless Agreement (if applicable) Building Official, City Attorney
Smoke Control (if applicable) Fire, Building Compliance
Structural Calculations Building Compliance
Geotechnical Report Building Compliance
Special Inspector Forms Building Compliance
Product Approval with specification on installations Fire, Building Compliance, Planning for the location
Heating/Cooling Sizing Load Calculations Building Compliance
Energy Calculation Form Building Compliance
Flood Emergency Operations Plan Building Compliance
Tree Disposition (if applicable) Urban Forestry Group
Tree Protection Plan (if applicable) Urban Forestry Group
Approved Tree Permit (if applicable) Urban Forestry Group, Planning
Drainage Calculations Report Public Works
Percolation Test Report Public Works
Public Works – Stormwater Utility Fee Worksheet Public Works
Fire Flow Test Fire
Preliminary approval from Transportation Department Public Works
Seawall Permit in the review stage and submitted to DERM Building Compliance
Construction Site Sediment and Erosion Control Affidavit Environmental
Electric Vehicles Parking Ordinance to be followed if parking lot/space/garage will be part of the project Planning
DRB, HPB, BO, PB recorded order or Determination of Architectural Significance (if applicable) scanned into plans after cover sheet. Planning
Completed City of Miami Beach Commercial Zoning Data Sheet scanned into plans. Zoning Data Sheet may not be altered or modified in any way Planning
All proposed mechanical equipment and/or allowable encroachments within required yards shall be indicated on setbacks and floor elevation. Please refer to Planning & Zoning Department for additional regulations. Planning

Required Additional Agency Approval:

Miami-Dade County Approval and Documents to include:

  • DERM Air Quality
  • Drainage Well Permit from DERM (if applicable)
  • DERM Sewer Capacity Certification Letter
  • WASD Ordinance 89-95 Compliance Form and proof of payment